Inspection Status: Requested

Inspection History: COT - HCBU - Building Progress

Permit Number - TC-COM-0125-00202

Inspection Description - COT - HCBU - Building Progress

Inspection Status - Requested

Date Description Inspector Results Comments
COT - HCBU - Building Progress Requested
08/14/2025 COT - HCBU - Building Progress Partial Pass 8-14-25: reinforcement on CMU elevator enclosure verified per plans. Okay to grout 1st lift at 4'.
08/20/2025 COT - HCBU - Building Progress Partial Pass 8-20-25: reinforcement on CMU elevator enclosure verified per plans. Okay to,grout 4th lift at 16'.
08/27/2025 COT - HCBU - Building Progress Partial Pass North half of building, second level floor at GL: 1 - 11/J - B. OK to begin,framing in progress areas.
08/29/2025 COT - HCBU - Building Progress Partial Pass 8-29-25: reinforcement on elevator enclosure verified. Top out at 44' -okay to grout.
09/04/2025 COT - HCBU - Building Progress Not Ready 9-4-25: contractor will schedule a 2nd floor deck nailing inspection when ready.
Note: anchor bolts/hold-downs and framing on 1st floor not inspected.
09/12/2025 COT - HCBU - Building Progress Partial Pass South side of Level #2 deck,
10/02/2025 COT - HCBU - Building Progress Partial Pass 10-2-25: partial pass for 2x8 joists/hangers at 16" o.c. for 1st & 2nd floor corridors. Okay to continue with construction at progress areas.
10/08/2025 COT - HCBU - Building Progress Partial Pass Information only: placement of electric outlets in separation walls in room units.
10/17/2025 COT - HCBU - Building Progress Partial Pass 10-17-25: all hangers & hardware along the 3rd & 4th floor corridors approved. Okay to continue construction at progress areas.
10/23/2025 COT - HCBU - Building Progress Partial Pass 10-23-25: verified hold downs at shear walls throughout 1st & 2nd floor. A combined 44 in total consisting of HTT4'and Continuous rod hold down systems verified per plans. Okay to continue construction at progress areas.
10/27/2025 COT - HCBU - Building Progress Re-inspection required 10-27-25: correct gaps between roof sheathing at 2 locations along the middle section and south west end of the south roof. Another spacing correction between sheathing is required at the northern roof deck along the east end before transitioning up along the parapet. All mentioned gaps in question were measured between 1" to 1 1/2". Minimum spacing between sheathing joints is 1/8" to 1/4" maximum. Schedule a reinspection at your convenience.