Inspection Status: Partial Pass

Inspection History: COT - HCBU - Interior Shear Bracing 

Date Description Inspector Results Comments
01/15/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 1-15-26: corrections made to exterior sheathing except for room 433 and damaged section of south corridor at 1st floor. Okay to stucco wrap elsewhere.
07/09/2026 COT - HCBU - Interior Shear Bracing  Passed
12/03/2025 COT - HCBU - Interior Shear Bracing  Re-inspection required 12-3-25: interior shear bracing at 4th floor room's 430, 429, 427, 428, 421, 422, 420, 419, 412, 411, 408,, 402, corridor, 403, 404. Add nails 6" o.c. 12" in the field, 3/8" from joints and cannot over-penetrate more than 1/8". Reschedule when ready
12/05/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 12/5/2025 partial pass. 3rd floor approved. Okay to proceed progress areas.
12/11/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 12/11/25
2nd floor good to go.
12/18/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 12-18-25: exterior sheathing inspection on 3rd floor. Room 303-fix broken section of sheathing at west wall top corner, add nails to west wall on 311, add nails east wall elevator lobby, 316-East wall-add nails/loose sheathing, add nails south wall at 319 above window, nails needed above window of 325, 327-nails above window and at edge-over penetrated. Framers will add nailing to sheathing above headers throughout