Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Date Description Inspector Results Comments
01/20/2026 COT - HCPL - Plumbing Progress  Partial Pass Plumbing above ceilings and in walls for room units on Level #4. Ok to insulate and cover walls.
01/27/2026 COT - HCPL - Plumbing Progress  Re-inspection required (with fee) 1-27-26: Reinspection for plumbing at 1st floor -room's 101-112, fire caulk DWV at decking all rooms, 111-add protection to pex line at restroom where closer than 1 1/4" from edge of stud. 108-add Boca plate restroom sill plate. 107-add stud shoe at marked locations (stud over notched), 105-add stud shoe at marked stud & Boca plate. 104-add screw to boca plates at restroom sill plate & stud shoe to stud. 101-add Boca restroom sill plate.
Note: Fire foam any penetration where sprinklers penetration corridor and pour back at required at tubs. Make sure you wrap DWV prior to pouring concrete.
06/24/2026 COT - HCPL - Plumbing Progress  Passed
12/09/2025 COT - HCPL - Plumbing Progress  Partial Pass DWV test along with tubs approved at 4th and 3rd floors. Pending stud shoes and more hangers at every 4´ for horizontal supports. 12/9/2025