Permit: T20CM02530
Permit Details
Apply Date:
04/23/2020
Applicant:
KIM PRESSGROVE
Description:
NEW HOTEL
Architects:
- DAVID RICHARD SCHUKAI
Contractors:
- CHASSE BUILDING TEAM INC
- CHASSE BUILDING TEAM INC***APA***
Permit Reviews
Permit Number - T20CM02530
Permit Status: C of o
Permit Description: NEW HOTEL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/25/2021 | REVISION - - 1ST | 12/17/2021 | COMPLETED |
04/23/2020 | PLANS OK TO SUBMIT - COMM | 06/01/2020 | COMPLETED |
06/01/2020 | COMMERCIAL - NEW | 08/20/2020 | COMPLETED |
08/25/2020 | RESUBMITTAL | 09/14/2020 | COMPLETED |
09/14/2020 | RESUBMITTAL | 09/16/2020 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T20CM02530
Permit Description: NEW HOTEL
Total Completed Inspections - 41
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2020 | ELECTRIC - UFER | DMUNIZ | Approved | partial, uffers in footings. |
11/06/2020 | ELECTRIC - UNDERGROUND | DMUNIZ | Approved | Partial, Secondary conduits from Switchgear to interior Electrical room (Gl12- Elevator shaft.) ok to backfill progress. |
11/17/2020 | PLUMBING - ROUGH, SOIL | DMUNIZ | Approved | Approved, completion of Under slab plumbing from GL1-6 ok to backfill. |
11/25/2020 | BUILDING PRE-SLAB | DMUNIZ | Approved | Partial, ok for concrete placement GL 1-7. |
12/01/2020 | EXCAVATION/LAYOUT REBAR & ZON | ESTEVENS | Approved | Not ready. |
12/03/2020 | SHEET ROCK NAILING | JBURGE | Approved | Partial. Level #1 corridor ceiling from South stairway to room#102. Two layers of sheet rock for two hour rating.. |
12/07/2020 | EXT METAL CLIPS/EXT SHEATHING | TGAUSP | Approved | Partial, North end Stairwell shear wall on ground level, ok to start Sheetrock for fire assembly. |
12/10/2020 | PLUMBING - YARD WTR LINE/TEST | DMUNIZ | Approved | |
12/11/2020 | REINFORCED MASONRY PRE-GROUT | RBOOHER | Approved | Approved, Elevator shaft complete. |
12/15/2020 | SITE - SEWER | DMUNIZ | Approved | Partial, Private sewer lines tested and in compliance. |
12/21/2020 | BUILDING - PROGRESS | DMUNIZ | Approved | Partial, South Corridor 2nd floor framing ok to start Fire barrier installation. |
12/21/2020 | ROOF NAILING | DMUNIZ | Approved | Partial, Deck nailing for 3rd floor South End ok to proceed with frame. |
12/23/2020 | MECHANICAL - FINAL | DMUNIZ | Approved | Partial, Four Exterior footings for Canopy Columns West Entrance. Isolated Laundry pad with Gutter trench all ok for concrete placement. |
12/23/2020 | FIREWALL/FIREBARRIER/FIRESTOP | DMUNIZ | Approved | Partial, South Corridor 2nd Floor. Fire barrier for upper walls ok to Proceed on ceiling. |
12/30/2020 | PLUMBING - GAS PRESSURE TEST | DMUNIZ | Approved | Partial, Gas line installed and tested from Service entrance to Mechanical room and halfway through Ground level corridor to Room 105. |
01/08/2021 | PLUMBING - SEWER HCS CONNECT | ESTEVENS | Approved | |
04/09/2021 | ELECTRIC - OUTDOOR LIGHTING | DMUNIZ | Approved | Approved, light piers installed and ok for concrete placement. |
04/23/2021 | GAS CLEARANCE | DMUNIZ | Approved | CODE |
05/10/2021 | PLUMBING - ROOF DRAINS | DMUNIZ | Approved | |
05/10/2021 | U VALUE FOR WINDOW | DMUNIZ | Approved | |
05/10/2021 | STUCCO MESH | DMUNIZ | Approved | |
05/27/2021 | MECHANICAL - INTERMEDIATE | DMUNIZ | Approved | |
05/27/2021 | PLUMBING - INTERMEDIATE | DMUNIZ | Approved | |
05/27/2021 | PLUMBING - ABOVE CEILING | DMUNIZ | Approved | |
05/27/2021 | ELECTRIC - ABOVE CEILING | DMUNIZ | Approved | |
06/01/2021 | ELECTRIC - PROGRESS | DMUNIZ | Approved | Inspection of 1600AMP CT, MDP, DP1, DP2 OK to clear TEP ECO |
06/01/2021 | TEP CLEARANCE - PM | DMUNIZ | Approved | CODE ECO/1600 AMP, CT, MDP, DP1, DP2 |
08/11/2021 | FRAMING | DMUNIZ | Approved | Approved |
08/11/2021 | ELECTRIC - INTERMEDIATE | DMUNIZ | Approved | Approved |
08/11/2021 | ELECTRIC - TEMPORARY SERVICE | DMUNIZ | Approved | - Not Applicable |
08/11/2021 | ELECTRIC - CONSTRUCTION POWER | DMUNIZ | Approved | - Not Applicable |
09/07/2021 | FIRE - FINAL | CBASALDUA | Approved | |
09/07/2021 | FIRE - ALARM FINAL | CBASALDUA | Approved | |
09/07/2021 | FIRE SPKLR - FINAL | CBASALDUA | Approved | |
09/09/2021 | ENGINEERING - FINAL | MHERENANDEZ | Approved | OK FOR TCO |
09/09/2021 | BUILDING - FINAL | DMUNIZ | Approved | Approved All conditions have been met & ok to apply for CofO. |
09/09/2021 | BUILDING ABOVE CEILING | DMUNIZ | Approved | 1080 |
09/09/2021 | OUTDOOR LIGHTING FINAL | DMUNIZ | Approved | 2090 |
09/09/2021 | ELECTRIC - FINAL | DMUNIZ | Approved | Approved All conditions have been met & ok to apply for CofO. |
09/09/2021 | PLUMBING - FINAL | DMUNIZ | Approved | Approved All conditions have been met & ok to apply for CofO. |
09/09/2021 | CERTIFICATE OF OCCUPANCY | DMUNIZ | Approved | Approved All conditions have been met & ok to apply for CofO. |