| 09/09/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
1080 |
| 07/30/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 1st floor corridor above ceiling ok to drop ceiling tiles. |
| 07/29/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 06/14/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 4th floor above drop ceiling penetrations inspected and ok to install ceiling tiles. Corrections required for 3rd floor missing fire-stop at penetrations. |
| 06/11/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 06/03/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 4th floor South stairwell fire ceiling assembly installed. |
| 06/01/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
Approved, 1st floor public area complete. |
| 05/27/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Correction Required |
Corrections required, first floor public area missing fire stop. |
| 05/19/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial approval 1st floor above ceiling grid to bottom of 2nd floor fire barrier in rooms 103 to 113 ok |
| 05/12/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 1st floor North guest rooms fire tape complete above ceilings on demising walls. Note: rooms 122 & 131 need fire tape. |
| 04/27/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 2nd floor above ceilings for demising walls ok to install ceiling. |
| 04/26/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Correction Required |
Correction, Remove Sheetrock for inspection of demising wall fire tape above ceiling locations that have not been approved. |
| 04/23/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 2nd floor demising walls fire taped from room 222-206. |
| 04/23/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 04/22/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 04/06/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 3rd floor Fire stop for demising walls from rooms 301-319. Note: Fire seal any penetrations where missed. |
| 04/05/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 03/31/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, 3rd floor demising fire walls Sheet-rocked and ok to tape from Room 322 North. |
| 03/30/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 03/15/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, above ceiling and corridor penetrations 4th floor ok to proceed. |
| 03/12/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 03/09/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, North 4th floor corridor, fire assembly for ceiling installed. |
| 03/08/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 03/04/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, Fire rock for North stairwell 3rd floor installed. (Note: make sure all joints are overlapped where double rock required.) |
| 02/10/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
APPROVED FOR 1420 E TUCSON MARKETPLACE BL, 2010(ELECTRICAL UNDERGROUND OUT OF MAIN BLDG TO- -TRANSFORMER PAD) APPROVED, |
| 02/09/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 02/05/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
PARTIAL NORTH/SOUTH STAIRWELLS, 4TH FLOOR, 3 RD FLOOR CORRIDOR #324 TO #334 OK TO TAPE |
| 02/04/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 02/03/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
PARTIAL - LEVEL 1 NORTH STAIRWELL DOUBLE LAYER SHEET ROCK OK TO TAPE |
| 02/02/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Not ready for Inspection |
NOT READY CANCELLED BY CONTRACTOR WILL RESCHEDULE 3 FEBRUARY |
| 02/02/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 02/01/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Not ready for Inspection |
NOT READY ROCK NOT IN PLACE YET |
| 02/01/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/29/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #3; corridor ceiling from room 301-311. |
| 01/29/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/28/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #2; Center Section Corridor at ceiling. |
| 01/28/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/27/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/25/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Not ready for Inspection |
Not ready. Contractor cancelled |
| 01/22/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/21/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #1; Center Section Corridor; Level #3; Corridor from Room Units 302-311. Progress areas double sheet rocked and fire caulked. |
| 01/20/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/19/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #3; South Corridor from Room Units 301 to 311. |
| 01/15/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level #2 Corridor from Unit Rooms 224-234; South Stairwell #2. Progress areas fire caulked. Ok to,cover. |
| 01/15/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/14/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 01/13/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial approval 2nd floor rms 224 to 234 cling grid to 3rd floor deck ok to fire tape |
| 01/12/2021 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 12/23/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, South Corridor 2nd Floor. Fire barrier for upper walls ok to Proceed on ceiling. |
| 12/22/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - AP canceled |
| 12/21/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
Partial, North Stairwell 2nd floor ok to proceed with fire wall. North 2nd floor corridor ok to continue with fire barrier installation. |
| 12/21/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, North Stairwell 2nd floor ok to proceed with fire wall. North 2nd floor corridor ok to continue with fire barrier installation. |
| 12/17/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, North Corridor walls, Ground level ok to continue progress. (Rms 125-135.) |
| 12/16/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, South stairwell 2nd floor. Progress on Fire wall ok to proceed. |
| 12/15/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, no inspection needed today. |
| 12/08/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, North Stairwell Ground level. Fire wall installed and ok to Tape & proceed. |
| 12/07/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, South End corridor on Ground level, mechanical penetrations sealed and ok to Sheetrock ceiling. |
| 12/04/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
PARTIAL, no inspection today. |
| 12/02/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial, Top of Fire assembly on South end, Ground level Corridor Walls. Ok to continue, and Fire tape progress areas. (South Stairwell to Room 110). |
| 12/01/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Partial. Level 1. Two layers of Sheet rock between south stairwell and unit. |
| 11/30/2020 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Cancelled |
IVRS - RI canceled |