Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: FRAMING

Permit Number - T20CM02530

Inspection Description - FRAMING

Inspection Status - Approved

Date Description Inspector Results Comments
08/11/2021 FRAMING Approved Approved
06/30/2021 FRAMING Partial Approval Partial, second floor corridor inspection complete. Note: Finish Fire tape @ missing locations North and South Near stairwells.
05/27/2021 FRAMING Partial Approval
05/18/2021 FRAMING Partial Approval Partial. Level #1; Lobby area, amenities area, laundry area. Ok to insulate and cover walls.
05/12/2021 FRAMING Partial Approval Partial, 1st floor guest suites ok to Sheetrock.
05/11/2021 FRAMING Partial Approval Partial, no inspection today see previous notes.
05/10/2021 FRAMING Partial Approval Partial, no inspection today see previous notes.
04/30/2021 FRAMING Partial Approval Partial, 1st floor inspection Of guest rooms North of lobby. Ok to Sheetrock walls.
04/28/2021 FRAMING Partial Approval Partial, framing complete for East side canopy.
04/23/2021 FRAMING Partial Approval Partial, mechanical room inspected and ok to start Sheetrock
04/20/2021 FRAMING Partial Approval Partial, North and South Stairwell frame complete.
04/15/2021 FRAMING Not ready for Inspection NOT READY CANCELLED BY CONTRACTOR
04/14/2021 FRAMING Partial Approval PARTIAL APPROVAL FOR 2ND FLOOR INTERIORS
04/07/2021 FRAMING Partial Approval Partial, 3rd and 4th floor stairwells ok to Sheetrock.
03/31/2021 FRAMING Partial Approval Partial, 3rd floor Drop ceilings in corridor.
03/25/2021 FRAMING Partial Approval Partial, 3rd floor progress ok to proceed with Sheetrock.
03/24/2021 FRAMING Partial Approval Partial, inspection rescheduled see previous notes.
03/10/2021 FRAMING Partial Approval Partial, 4th floor framing inspected ok to Sheetrock tubs and showers. 3rd floor ok to Sheetrock tubs and showers as well.
03/09/2021 FRAMING Partial Approval Partial, framing above 4th floor ceiling for fire assembly, ok to Sheetrock progress.
03/08/2021 FRAMING Partial Approval Partial, no inspection today see previous notes.
03/04/2021 FRAMING Partial Approval Partial, 4th floor corridor frame for fire ceiling assembly ok to start Sheetrock.
03/02/2021 FRAMING Partial Approval Partial, North stairwell 3rd floor ok to install Sheetrock, 3rd floor corridor above ceiling ok to proceed with fire assembly.
02/25/2021 FRAMING Partial Approval Partial. Room framing at Level #1; Staff Laundry (except for three West rooms); Room Units 120 - 134; Level #2; Room Units 202 - 234
02/24/2021 FRAMING Partial Approval Partial. Level 3 at South Stairwell from Level #3 to Level #4; Level #1; Room Units 103 - 113; 142; 143.
02/23/2021 FRAMING Not ready for Inspection NOT READY
02/05/2021 FRAMING Partial Approval PARTIAL 3RD FLOOR CORRIDOR CEILING #310-#324 AND HANGERS, 2ND FLOOR NORTH/SOUTH STAIRWELLS AND 1ST FLOOR STAIRS/STRINGERS
01/13/2021 FRAMING Partial Approval Partial approval for south stairwell north wall sheathing shear wall and exterior walls ok to drywall up to 8’, double wall on interior walls in stair well ok to tape up to 8’