Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/10/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
|
| 03/10/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial, West side Exterior sheathing inspected except front vestibule. |
| 02/23/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
PARTIAL APPROVAL PA EAST AND SOUTH ELEVATIONS |
| 01/06/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial approval for 2nd floor hallway joists and shear ok to install drywall |
| 12/07/2020 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial, North end Stairwell shear wall on ground level, ok to start Sheetrock for fire assembly. |
| 12/01/2020 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Corridor section at units 103 thru 110. |