Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: BUILDING - PROGRESS

Permit Number - T20CM02530

Inspection Description - BUILDING - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
02/19/2021 BUILDING - PROGRESS Approved APPROVED - (3RD FLOOR HALLWAY 2 HR FIRE ASSEMBLY CEILNG APPROVED.,SOUTH STAIRWELL FRAMING HOLD-DOWNS FOR 3RD & 4TH FLOORS). ALL APPROVED AS NOTED HERE-IN
02/12/2021 BUILDING - PROGRESS Partial Approval PARTIAL, FIRE CAULKING PENETRATIONS IN CORRIDOR FROM ROOM 310-334.
02/10/2021 BUILDING - PROGRESS Not ready for Inspection NOT READY FOR 1420 E TUCSON MARKETPLACE BL AT THIS TIME
02/05/2021 BUILDING - PROGRESS Cancelled CANCELLED
02/03/2021 BUILDING - PROGRESS Not ready for Inspection NOT READY CONTRACTOR CANCELLED WILL RESCHEDULE FOR 4 FEBRUARY
02/02/2021 BUILDING - PROGRESS Not ready for Inspection NOT READY CANCELLED BY CONTRACTOR
02/01/2021 BUILDING - PROGRESS Partial Approval PARTIAL N. 1/3 OF 4TH FLOOR DECK NAILING OK - SECTION C
01/29/2021 BUILDING - PROGRESS Partial Approval artial. Level #2; Corridor ceiling with two layers of sheet rock for two hour rating. Level #3; joists hangers in corridor from room 301-334.
01/28/2021 BUILDING - PROGRESS Partial Approval Partial. Level #1; North and South Stairwells: framed and hold downs in place. Ok to insulate and cover walls. East and South mechanical room walls framed. Ok to cover progress areas.
01/25/2021 BUILDING - PROGRESS Partial Approval Partial. Level #3; joists clips in corridor at Room Units 210 - 222.
01/21/2021 BUILDING - PROGRESS Partial Approval Partial. (01035). Level #1; Room Units and laundry room areas, all areas except for lobby and amenities areas.
01/19/2021 BUILDING - PROGRESS Partial Approval Partial. Level #1; Center area, hangers and R C Channel are in place. Ok to cover progress areas. Level #3 South Corridor; Hangers (LUS26 and ESR 2523) in place. Room #303, South exterior wall two hour fire rated wall (2 layers of 5/8” sheet rock) at South Stairwell. Ok to tape progress area.
01/13/2021 BUILDING - PROGRESS Partial Approval Partial approval South corridor 1st floor corridor joist hangers OK for drywall room 111 to 124 ceiling grid to 2nd floor deck.
01/06/2021 BUILDING - PROGRESS Partial Approval Partial approval for;
1. 1st and 2nd floor hallways rooms 124 north to stairway, and 211 south.
Drywall screws and double layer overlap above grid including penetrations for exhaust ducts fire seal at rim boards
2. Partial approval for Electrical room in south east corner framing 1st floor ok to drywall
3. Partial approval for Mechanical room adjoining electrical room framing
4. Partial approval for stairwell in the south west corner framing ok to drywall 1st floor, not areas covering first to 2nd floor framing hold down connections or electrical
12/21/2020 BUILDING - PROGRESS Partial Approval Partial, South Corridor 2nd floor framing ok to start Fire barrier installation.
12/14/2020 BUILDING - PROGRESS Partial Approval Partial, North end Corridor on Ground level. Framing above ceiling, ok to start installing Fire barrier.