Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
280 S CHURCH AV
Apply Date:
06/11/2019
Applicant:
N/A
Description:
HOTEL
Architects:
  • MARLEY, EDWARD TODD
Contractors:
  • RYAN COMPANIES U S INC

Permit Reviews

Permit Number - T19CM04184
Permit Status: C of o
Permit Description: HOTEL
Start Date Submittal Complete Date Status  
02/07/2020 REVISION - - 1ST 03/11/2020 COMPLETED Review Details
06/11/2019 COMMERCIAL - BLDG/FIRE/ZONING/ENG 06/27/2019 COMPLETED Review Details
06/27/2019 COMMERCIAL - TI 09/23/2019 COMPLETED Review Details
08/02/2019 RESUBMITTAL - TI ALL 09/25/2019 COMPLETED Review Details
09/25/2019 RESUBMITTAL - TI ALL 03/17/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM04184
Permit Status: C of o
Permit Description: HOTEL
Total Outstanding Activity Conditions - 1
Date Name
06/11/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM04184
Permit Description: HOTEL
Total Completed Inspections - 57
Date Description Inspector Results Comments
12/03/2019 BUILDING PRE-SLAB JBURGE Approved Post Tension Cable System at Level #3; GL: A-H/5-13. Ok to place concrete.
12/12/2019 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved Level #3; elevator shear walls #3;4;5. Ok to set forms and place concrete in progress areas.
12/16/2019 FRAMING JBURGE Approved Courtesy inspection of new framing system.
12/26/2019 TEP CLEARANCE - PM ESTEVENS Approved Temporary power #2. CODE ECO.
12/26/2019 ELECTRIC - TEMPORARY SERVICE ESTEVENS Approved Temporary power #2. The TEP clearance code is ECO.
12/30/2019 REINFORCED MASONRY PRE-GROUT JBURGE Approved Stairwell #1; Northwest and North CMU walls at 8’-12’, CMU walls at 0’-4’; at GL: K.5/14.5-13.8; 14.5/K.8-K; K/14.5-12. Ok to grout progress areas.
09/08/2020 POOL/SPA ELECTRIC JBURGE Approved Approved. Ok to Gunite pool.
09/11/2020 GAS CLEARANCE JBURGE Approved CODE
10/16/2020 MECHANICAL - ABOVE CEILING JBURGE Approved Approved
10/16/2020 PLUMBING - GAS PRESS TEST FNL JBURGE Approved Approved
10/16/2020 BUILDING ABOVE CEILING JBURGE Approved Approved
10/16/2020 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved Approved
10/16/2020 POOL/SPA PLUMBING JBURGE Approved Approved
10/16/2020 POOL/SPA PRE-GUNITE JBURGE Approved Approved
10/16/2020 MECHANICAL - INTERMEDIATE JBURGE Approved Approved
10/16/2020 MECHANICAL - UNDERGROUND JBURGE Approved Approved
10/16/2020 PLUMBING - PROGRESS JBURGE Approved Approved
10/16/2020 SITE - SEWER JBURGE Approved Approved
10/16/2020 PLUMBING - BACK WATER VALVE JBURGE Approved Approved
10/16/2020 PLUMBING - GAS PRESSURE TEST JBURGE Approved Approved
10/16/2020 PLUMBING - YARD WTR LINE/TEST JBURGE Approved Approved
10/16/2020 PLUMBING - ROOF DRAINS JBURGE Approved Approved
10/16/2020 PLUMBING - ABOVE CEILING JBURGE Approved Approved
10/16/2020 PLUMBING - INTERMEDIATE JBURGE Approved Approved
10/16/2020 PLUMBING - PRE SLAB JBURGE Approved Approved
10/16/2020 PLUMBING - ROUGH, SOIL JBURGE Approved Approved
10/16/2020 ELECTRIC - SERVICE UPGRADE JBURGE Approved Approved
10/16/2020 ELECTRIC - CONSTRUCTION POWER JBURGE Approved Approved
10/16/2020 ELECTRIC - ABOVE CEILING JBURGE Approved Approved
10/16/2020 ELECTRIC - INTERMEDIATE JBURGE Approved Approved
10/16/2020 ELECTRIC - UFER JBURGE Approved Approved
10/16/2020 SHEET ROCK NAILING JBURGE Approved Approved
10/16/2020 U VALUE FOR WINDOW JBURGE Approved Approved
10/16/2020 STUCCO MESH JBURGE Approved Approved
10/16/2020 ROOF NAILING JBURGE Approved Approved
10/16/2020 STEM WALL/RETAINING WALL JBURGE Approved Approved
11/04/2020 BUILDING - PROGRESS JBURGE Approved Partial. Information for placement of 6” drain/clean out at sidewalk area of Southwest loading area. Sidewalk to East needs to be evaluated for proper slope.
11/04/2020 PLUMBING - FINAL JBURGE Approved Not ready. Contractor cancelled.
12/10/2020 MECHANICAL - PROGRESS ESTEVENS Approved Canceled by contractor.
12/22/2020 FIRE - FINAL MRoss Approved - Checked emergency lights and exit signs. Add chevrons to exit signs oposite elevators on all floors.
-verify orientation of exit signs at stairwells
12/22/2020 FIRE - ALARM FINAL MRoss Approved Submit as-built plans
12/22/2020 OUTDOOR LIGHTING FINAL JBURGE Approved Approved. Exterior lighting for building and parking lot inspected by special inspection.
12/23/2020 POOL/SPA FINAL/BARRIER JBURGE Approved Approved.
12/28/2020 POOL/SPA HEATER JBURGE Approved APPROVED
12/28/2020 POOL/SPA GAS JBURGE Approved APPROVED
12/28/2020 MECHANICAL - HOODS JBURGE Approved APPROVED
12/28/2020 PLUMBING - SEWER HCS CONNECT JBURGE Approved APPROVED
12/28/2020 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved APPROVED
12/28/2020 ELECTRIC - PROGRESS JBURGE Approved APPROVED
12/28/2020 ELECTRIC - UNDERGROUND JBURGE Approved APPROVED
12/28/2020 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved APPROVED
12/29/2020 BUILDING - FINAL JBURGE Approved PARTIAL, Pre-TCO walk through on Level #2 Admin Offices and Lobby area.
12/30/2020 FIRE SPKLR - FINAL CBASALDUA Approved
02/08/2021 ENGINEERING - FINAL DROBERTS Approved
02/09/2021 MECHANICAL - FINAL JBURGE Approved Approved
02/09/2021 ELECTRIC - FINAL JBURGE Approved Approved
03/17/2021 CERTIFICATE OF OCCUPANCY LBOWERS Approved PER CT

Documents

File Name Document Type  
1ST TEMP C OF O 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
2ND TEMP C OF O 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
C OF O 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR COFFEE BAR 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR HOTEL LODGING 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR KITCHEN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR MAIN BAR 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR POOL BAR 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
NOTIFICATION OF INSPECTION RIGHTS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO REQUEST FORM 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
1ST TEMP C OF O.PDF DOCUMENTS VIEW
2ND TEMP C OF O.PDF DOCUMENTS VIEW
C OF O.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR COFFEE BAR.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR HOTEL LODGING.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR KITCHEN.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR MAIN BAR.PDF DOCUMENTS VIEW
HEALTH APPROVAL FOR POOL BAR.PDF DOCUMENTS VIEW
NOTIFICATION OF INSPECTION RIGHTS.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
TCO REQUEST FORM.PDF DOCUMENTS VIEW
T19CM04184 D3 APPROVED WITH R4 SHEETS.PDF CONSTRPLANS VIEW
None DOCUMENTS VIEW
1_APPLICATION.PDF DOCUMENTS VIEW
2ND PARTY_T19CM04184 COT INSPECTIONS.PDF DOCUMENTS VIEW
2ND PARTY_T19CM04184 COT PLAN REVIEW CARD.PDF DOCUMENTS VIEW
APPROVED_T19CM04184 POOL STRUCT CALCS -.PDF DOCUMENTS VIEW
APPROVED_T19CM04184 COMCHECK -.PDF DOCUMENTS VIEW
TCC HOTEL TI.PDF DOCUMENTS VIEW