Permit: T19CM04184
Permit Details
Apply Date:
06/11/2019
Applicant:
N/A
Description:
HOTEL
Architects:
- MARLEY, EDWARD TODD
Contractors:
- RYAN COMPANIES U S INC
Permit Reviews
Permit Number - T19CM04184
Permit Status: C of o
Permit Description: HOTEL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/07/2020 | REVISION - - 1ST | 03/11/2020 | COMPLETED |
06/11/2019 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 06/27/2019 | COMPLETED |
06/27/2019 | COMMERCIAL - TI | 09/23/2019 | COMPLETED |
08/02/2019 | RESUBMITTAL - TI ALL | 09/25/2019 | COMPLETED |
09/25/2019 | RESUBMITTAL - TI ALL | 03/17/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM04184
Permit Status: C of o
Permit Description: HOTEL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/11/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T19CM04184
Permit Description: HOTEL
Total Completed Inspections - 57
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/03/2019 | BUILDING PRE-SLAB | JBURGE | Approved | Post Tension Cable System at Level #3; GL: A-H/5-13. Ok to place concrete. |
12/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | Level #3; elevator shear walls #3;4;5. Ok to set forms and place concrete in progress areas. |
12/16/2019 | FRAMING | JBURGE | Approved | Courtesy inspection of new framing system. |
12/26/2019 | TEP CLEARANCE - PM | ESTEVENS | Approved | Temporary power #2. CODE ECO. |
12/26/2019 | ELECTRIC - TEMPORARY SERVICE | ESTEVENS | Approved | Temporary power #2. The TEP clearance code is ECO. |
12/30/2019 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | Stairwell #1; Northwest and North CMU walls at 8’-12’, CMU walls at 0’-4’; at GL: K.5/14.5-13.8; 14.5/K.8-K; K/14.5-12. Ok to grout progress areas. |
09/08/2020 | POOL/SPA ELECTRIC | JBURGE | Approved | Approved. Ok to Gunite pool. |
09/11/2020 | GAS CLEARANCE | JBURGE | Approved | CODE |
10/16/2020 | MECHANICAL - ABOVE CEILING | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - GAS PRESS TEST FNL | JBURGE | Approved | Approved |
10/16/2020 | BUILDING ABOVE CEILING | JBURGE | Approved | Approved |
10/16/2020 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | Approved |
10/16/2020 | POOL/SPA PLUMBING | JBURGE | Approved | Approved |
10/16/2020 | POOL/SPA PRE-GUNITE | JBURGE | Approved | Approved |
10/16/2020 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | Approved |
10/16/2020 | MECHANICAL - UNDERGROUND | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - PROGRESS | JBURGE | Approved | Approved |
10/16/2020 | SITE - SEWER | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - BACK WATER VALVE | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - GAS PRESSURE TEST | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - YARD WTR LINE/TEST | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - ROOF DRAINS | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - ABOVE CEILING | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - INTERMEDIATE | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - PRE SLAB | JBURGE | Approved | Approved |
10/16/2020 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | Approved |
10/16/2020 | ELECTRIC - SERVICE UPGRADE | JBURGE | Approved | Approved |
10/16/2020 | ELECTRIC - CONSTRUCTION POWER | JBURGE | Approved | Approved |
10/16/2020 | ELECTRIC - ABOVE CEILING | JBURGE | Approved | Approved |
10/16/2020 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | Approved |
10/16/2020 | ELECTRIC - UFER | JBURGE | Approved | Approved |
10/16/2020 | SHEET ROCK NAILING | JBURGE | Approved | Approved |
10/16/2020 | U VALUE FOR WINDOW | JBURGE | Approved | Approved |
10/16/2020 | STUCCO MESH | JBURGE | Approved | Approved |
10/16/2020 | ROOF NAILING | JBURGE | Approved | Approved |
10/16/2020 | STEM WALL/RETAINING WALL | JBURGE | Approved | Approved |
11/04/2020 | BUILDING - PROGRESS | JBURGE | Approved | Partial. Information for placement of 6” drain/clean out at sidewalk area of Southwest loading area. Sidewalk to East needs to be evaluated for proper slope. |
11/04/2020 | PLUMBING - FINAL | JBURGE | Approved | Not ready. Contractor cancelled. |
12/10/2020 | MECHANICAL - PROGRESS | ESTEVENS | Approved | Canceled by contractor. |
12/22/2020 | FIRE - FINAL | MRoss | Approved | - Checked emergency lights and exit signs. Add chevrons to exit signs oposite elevators on all floors. -verify orientation of exit signs at stairwells |
12/22/2020 | FIRE - ALARM FINAL | MRoss | Approved | Submit as-built plans |
12/22/2020 | OUTDOOR LIGHTING FINAL | JBURGE | Approved | Approved. Exterior lighting for building and parking lot inspected by special inspection. |
12/23/2020 | POOL/SPA FINAL/BARRIER | JBURGE | Approved | Approved. |
12/28/2020 | POOL/SPA HEATER | JBURGE | Approved | APPROVED |
12/28/2020 | POOL/SPA GAS | JBURGE | Approved | APPROVED |
12/28/2020 | MECHANICAL - HOODS | JBURGE | Approved | APPROVED |
12/28/2020 | PLUMBING - SEWER HCS CONNECT | JBURGE | Approved | APPROVED |
12/28/2020 | ELECTRIC - OUTDOOR LIGHTING | JBURGE | Approved | APPROVED |
12/28/2020 | ELECTRIC - PROGRESS | JBURGE | Approved | APPROVED |
12/28/2020 | ELECTRIC - UNDERGROUND | JBURGE | Approved | APPROVED |
12/28/2020 | FIREWALL/FIREBARRIER/FIRESTOP | JBURGE | Approved | APPROVED |
12/29/2020 | BUILDING - FINAL | JBURGE | Approved | PARTIAL, Pre-TCO walk through on Level #2 Admin Offices and Lobby area. |
12/30/2020 | FIRE SPKLR - FINAL | CBASALDUA | Approved | |
02/08/2021 | ENGINEERING - FINAL | DROBERTS | Approved | |
02/09/2021 | MECHANICAL - FINAL | JBURGE | Approved | Approved |
02/09/2021 | ELECTRIC - FINAL | JBURGE | Approved | Approved |
03/17/2021 | CERTIFICATE OF OCCUPANCY | LBOWERS | Approved | PER CT |