Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2020 |
BUILDING PRE-SLAB |
|
Approved |
Approved |
| 04/08/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
RVI Level #7 (Roof) East slab; #4 Wire mesh and rebar enforcement. Ok to place concrete in progress area. |
| 03/24/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Level #7 North; deck slab: rebar and wire mesh reinforced. Ok to place concrete in progress area. |
| 03/12/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Level #6 East; wire mesh and rebar reinforcement in place. Ok to place concrete in progress areas. |
| 03/03/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Level #6; North and Southwest slab area. Metal decking with #4 wire mesh over laid and #4 & #5 rebar. Ok to place concrete in progress areas. |
| 02/25/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Metal decking system; #4 mesh; rebar; Level #5 East slab. Ok to place concrete in progress area. |
| 02/24/2020 |
BUILDING PRE-SLAB |
|
Not ready for Inspection |
Contractor cancelled; will reschedule for 25 February. |
| 02/04/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Metal/rebar deck system at Level #4 East. Ok to place concrete. Blankets and weather protection must be place on finished concrete due to inclement weather. |
| 01/29/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Level #4; West deck; #4 wire mesh and rebar on a metal deck. Ok to place concrete in progress area. |
| 01/10/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Level #3; North: rebar and wire mesh in place. Ok to place concrete in progress area. |
| 01/08/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Level #3; GL: B.5/5-6; 6/A-B.5; 1-5/A-H; 5.75/A. Ok to place concrete in progress areas. |
| 12/03/2019 |
BUILDING PRE-SLAB |
|
Partial Approval |
Post Tension Cable System at Level #3; GL: A-H/5-13. Ok to place concrete. |