Permit: T19CM04184

Parcel: 11720029A


Addresses:

280 S CHURCH AV

Inspection Status: Approved

Inspection History: FIRE - FINAL

Date Description Inspector Results Comments
03/11/2021 FIRE - FINAL Approved
02/25/2021 FIRE - FINAL Not ready for Inspection 1. Need to complete Fire Alarm notes.
2. Install elvator keys in elevator lobby key box.
3. Finish exterior signage.
12/22/2020 FIRE - FINAL Partial Approval - Checked emergency lights and exit signs. Add chevrons to exit signs oposite elevators on all floors.
-verify orientation of exit signs at stairwells
12/10/2020 FIRE - FINAL Partial Approval 1. Ok for TCO for FF&E and stocking.
2. Building has a live sprinkler system that is monitored.