Date Description Inspector Results Comments
10/16/2020 BUILDING ABOVE CEILING Approved Approved
09/25/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level #1; Main Lobby area; bar area; coffee bar area. Duct work change in Lobby area as noted on plans. Ok to cover progress areas.
09/10/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level #1: Electric, Plumbing, Mechanical above ceilings in Meeting Room #4; South dining area; Main dining area; Coffee Bar, Retain space. Ok to cover progress areas.
08/27/2020 BUILDING ABOVE CEILING Partial Approval Partial. Meeting rooms; lobby area; lobby corridors. Ok to cover ceilings. Ensure that penetrations are properly fire caulked.
08/26/2020 BUILDING ABOVE CEILING Not ready for Inspection Not ready. Contractor cancelled. Will reschedule for 27 August.
08/12/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level #1; Meeting rooms, ok to cover ceilings. Level #6; Room Units #601-639 and corridors. Ok to cover progress areas.
07/31/2020 BUILDING ABOVE CEILING Partial Approval Partial. Elevator lobby areas on Levels #2-6. Ok to cover areas when fire system is in place.
07/27/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level #6; Room units at East and North corridors.
06/22/2020 BUILDING ABOVE CEILING Not ready for Inspection Not ready. Contractor cancelled.
05/05/2020 BUILDING ABOVE CEILING Partial Approval Partial. Pool restrooms at Level #2; public restrooms #243; 244. Ok to frame and cover ceilings.
04/27/2020 BUILDING ABOVE CEILING Partial Approval RVI Partial (VRI); Level #2; Balcony, exterior soffit.
04/21/2020 BUILDING ABOVE CEILING Partial Approval Level #1; Restrooms #050; 051; 053; 054; Corridor #16 and #16B.
03/11/2020 BUILDING ABOVE CEILING Partial Approval 1st floor back of house hard lid areas.