Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel11720029A
11720026A
117200270
JurisdictionTucson
City of Tucson ZoningPAD-5
Water Course

Washes

Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District, Downtown Core
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodDowntown
RedevelopmentDowntown Redevelopment District
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 280 S CHURCH AV
Date - 11/13/2024 4:20 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Rezoning Cases

Date - 11/13/2024 4:20 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-09-12 TCC - PAD 5 Amendment PAD Closed 10/19/2009

Special Development Requests & Requirements

Address: 280 S CHURCH AV
Date - 11/13/2024 4:20 a.m.
Total Number Of Special Development Permits - (7)
Activity Number Status Apply Date Expired Date Unit Type Description
T19SA00212 COMPLETE 05/30/2019 N/A Zoning Adminstration Letter ZONING LETTER REQUEST/REPLY
T20SA00068 APPROVED 02/20/2020 N/A IID RNA Subarea Rio Nuevo Review - New Parking Garage and Landscaping
T20SA00069 VOID 02/20/2020 N/A Historic Preservation Zone Activity number voided. For all associated documentation refer to T20SA00068.
T20SA00168 APPROVED 06/09/2020 N/A Historic Preservation Zone
T20SA00169 APPROVED 06/09/2020 N/A Historic Preservation Zone
T20SA00180 APPROVED 06/16/2020 N/A Historic Preservation Zone TCC Landscaping restoration/ Upper Plaza
T21SA00125 APPROVED 04/09/2021 N/A Historic Preservation Zone Railing

Permits

Address: 280 S CHURCH AV
Date - 11/13/2024 4:20 a.m.
Total Number Of Permits - (32)
Permit Status Apply Date Expired Date Unit Type Description
DP19-0312 Complete 12/24/2019 05/23/2021 Development Package SITE/GRADING/SWPPP/IID - TCC, Lot A, Parking Structure/Garage.
T20SA00320 Submitted 11/03/2020 N/A Zoning Compliance TCC - West Meeting Room Addition, West Parking Garage, and Hardscape/Landscape Imrpovements - - No
T20SA00321 Submitted 11/03/2020 N/A Zoning Compliance
DP20-0205 Fees Due 10/06/2020 10/18/2025 Development Package Site/Grading/SWPPP - Tucson Convention Center improvements. Meeting rooms, parking garage, site impr
DP19-0123 Complete 05/10/2019 06/21/2021 Development Package SITE - Tucson Convention Center, surface parking lot.
T21RW02227 Complete 05/06/2021 09/16/2022 Right-of-Way (ROW) *AFTER-THE-FACT* DOCUMENTED AFTER INSTALLATION IN CITY OF TUCSON ROWNO EXCAVATION REQUIRED; BARR
DP19-0038 Complete 02/14/2019 04/05/2023 Development Package SITE/GRADING/SWPPP/ IID - TCC Hotel, construction of new hotel.
T19CM02310 FINAL 04/02/2019 07/27/2021 COMBO E- FOUNDATION AND SUPER STRUCTURE
T19CM03594 FINAL 05/21/2019 02/22/2020 COMBO DEMO PORTION OF EAST LOBBY
T19CM03779 FINAL 05/29/2019 07/05/2021 COMBO 24x 56 CONSTRUCTION
T19CM04184 C OF O 06/11/2019 09/13/2021 COMBO HOTEL
T19CM05115 FINAL 07/18/2019 01/20/2020 COMBO TEMP POWER POLE
T19CM05924 FINAL 08/19/2019 12/21/2020 COMBO CONCRETE SLAB
T19CM07381 FINAL 10/08/2019 12/21/2020 COMBO TEMP ELEC SERVICE
T19FC01035 FINAL 12/10/2019 09/11/2021 FIRECONS NEW FIRE ALARM SYSTEM FOR TCC DOUBLETREE HOTEL CUSTOM FIREFIGHTERS SMOKE CONTROL PANEL DRIVEN BY FIRE ALARM PANEL
T19FC01065 FINAL 12/20/2019 06/08/2021 FIRECONS New Kitchen Hood System for TCC Hotel
T19RW04850 FINAL 09/03/2019 10/03/2019 ROW TEP NEED TO RUN OVERHEAD CONDUCTOR FROM POLE ON SOUTHSIDE OF CUSHING TO POLE ON NORTHSIDE OF CUSHING IN CONSTRUCTION YARD
T19RW05584 FINAL 09/24/2019 12/06/2019 ROW TEP TO PERFORM MAINTENANCE ON A PULL LOCATED IN RIGHT-OF-WAY ON THE CORNER OF CHURCH AVE & CUSHING ST. TEP VEHICLES WILL NEED TO PARK IN ROW. FIELD ADJUSTMENTS MAY BE REQUIRED. PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D.
T19RW06061 FINAL 10/14/2019 11/13/2019 ROW INSTALLATION OF A 6" FIRE PROTECTION SERVICE AND 3" WATER METER. CONTACT PARK TUCSON FOR METER HOODING.
T19RW06529 FINAL 10/25/2019 11/23/2019 ROW TO EXCAVATE AND INSTALL CONDUIT FOR TUCSON ELECTRIC POWER; WORK IS ON CUSHING STREET; CLOSING SIDEWALK PLEASE COORDINATE WORK WITH OTHER COMPANIES IN THE SAME WORK AREA.
T19RW07616 FINAL 12/19/2019 12/22/2019 ROW TEP TO PERFORM MAINTENANCE ON A PULL IN RIGHT-OF-WAY ON THE CORNER OF CHURCH AV & CUSHING ST. TEP VEHICLES WILL NEED TO PARK IN ROW. WO 6262686
T19RW07723 FINAL 12/26/2019 01/31/2019 ROW (2) 5X5 bellholes in dirt/blktop/concrete front and approx 25 ft trench---to install new gas line NOTES: PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. ALONG WITH GEM SHOW RESTRICTION BEGINNING JANUARY 31, 2020 - FEBUARY 16, 2020. CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC COTROL SHELL BE REMOVED PRIOR TO 3:30 PM This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO 12/31/2019 - R1: TEMPORARY TRAFFIC CONTROL PLAN APPROVED FROM THURSDAY 01/02/2020 - THURSDAY 01/09/2020 MESSAGE BOARD MUST BE UP PRIOR AND DURING WORK.
T19RW07767 FINAL 12/30/2019 02/01/2020 ROW INSTALLING A 6" FIRE PROTECTION SERVICE AND 3" WATER METER
T20FC00010 FINAL 01/08/2020 06/28/2021 FIRECONS Install NEW Fire Sprinkler System
T20FC00063 FINAL 01/23/2020 12/12/2020 FIRECONS Install fire sprinkler underground piping
T20FC00237 FINAL 04/07/2020 07/24/2021 FIRECONS Install, DBA (DAS) Fire Fighters Radio Communication system in 5 story, new construction Hotel
T20RW01059 FINAL 02/20/2020 04/01/2020 ROW INSTALLATION OF A 6" FIRE PROTECTION SERVICE AND 3" WATER METER, CONTINUATION OF PERMIT T19RW07767. THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. STOP WORK AND NOTIFY HPO IF ANY BURIED CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION
T20RW02941 FINAL 05/21/2020 07/25/2020 ROW INSTALLATION OF FIBER @ 645 LF 463 LF AERIAL AND 182 LF UG Riser up and Overlash 175' going East continue North 132' contine going N/W 156' and riser down. Trench/bore 152' crossing Cushing St continue going West 30' to out of ROW. AERIAL FIBER MUST BE 16-FT HIGH. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED.
T21FC00177 FINAL 03/04/2021 03/18/2022 FIRECONS Install Cellular dialer to existing FA system
T21OT00031 FINAL 01/12/2021 01/02/2022 SIGN Freestanding sign for Double Tree
T21OT00073 FINAL 01/27/2021 10/26/2021 SIGN 1= illum wall sign (LED)
T21RW04528 FINAL 10/05/2021 01/16/2022 ROW TRAFFIC CONTROL SET-UP TO ONE LANE IN EACH DIRECTION ALONG CHURCH AV, BETWEEN BROADWAY BL AND CUSHING ST FOR THE CITY OF TUCSON HOLIDAY ICE RINK. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 11/10/2021 - PLAN CHANGE - R1 MOVING LIMITS OF HARD CLOSURE ON CHURCH AV FROM CUSHING TO McCORMICK BASED ON PRE-CONSTRUCTION MEETING WITH DTM ROW INSPECTORS.

Plans

Address: 280 S CHURCH AV
Date - 11/13/2024 4:20 a.m.
Total Number Of Plans - (3)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-19-0038 Active 02/14/2019 04/05/2023 -- Commercial Water Harvesting Ordinance SITE/GRADING/SWPPP/ IID - TCC Hotel, construction of new hotel.
CWH-19-0312 Active 12/24/2019 05/23/2021 -- Commercial Water Harvesting Ordinance SITE/GRADING/SWPPP/IID - TCC, Lot A, Parking Structure/Garage.
T19PRE0215 CLOSED 11/21/2019 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site/Grading/SWPPP: Tucson Convention Ctr, parking garage.