Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
251 S WILLIAMS BL
Apply Date:
02/25/2019
Applicant:
N/A
Description:
OFFICE BUILDING
Contractors:
  • SUNDT CONSTRUCTION INC

Permit Reviews

Permit Number - T19CM01353
Permit Status: C of o
Permit Description: OFFICE BUILDING
Start Date Submittal Complete Date Status  
02/20/2020 REVISION - - 1ST 02/20/2020 COMPLETED Review Details
02/25/2019 PLANS OK TO SUBMIT - COMM 02/26/2019 COMPLETED Review Details
02/28/2019 COMMERCIAL - NEW 05/22/2019 COMPLETED Review Details
03/04/2021 REVISION - - 2ND 04/01/2021 COMPLETED Review Details
05/22/2019 RESUBMITTAL - TI ALL 07/10/2019 COMPLETED Review Details
07/10/2019 RESUBMITTAL - TI ALL 08/13/2019 COMPLETED Review Details
08/14/2019 RESUBMITTAL 08/20/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM01353
Permit Status: C of o
Permit Description: OFFICE BUILDING
Total Outstanding Activity Conditions - 1
Date Name
02/25/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM01353
Permit Description: OFFICE BUILDING
Total Completed Inspections - 43
Date Description Inspector Results Comments
09/09/2019 STEM WALL/RETAINING WALL RCHANDLER Approved Maintenance yard.
10/31/2019 PLUMBING - YARD WTR LINE/TEST RCHANDLER Approved 70’ East from last inspection. No test at this time; bury at own risk.
11/14/2019 BUILDING - PROGRESS MRMABER Approved
11/21/2019 MECHANICAL - INTERMEDIATE RCHANDLER Approved Rained out.
11/27/2019 ELECTRIC - UNDERGROUND RCHANDLER Approved Under building complete; site work remains to be inspected.
11/27/2019 FRAMING RCHANDLER Approved West exterior wall levels two and three.
12/04/2019 PLUMBING - SEWER HCS CONNECT RCHANDLER Approved All but test and connection to building.
12/17/2019 PLUMBING - ROUGH, SOIL RCHANDLER Approved
12/17/2019 PLUMBING - INTERMEDIATE RCHANDLER Approved Work incomplete.
12/18/2019 BUILDING PRE-SLAB MRAMBER Approved Work not complete
12/20/2019 REINFORCED MASONRY PRE-GROUT MRAMBER Approved Top out main building south wall OK.
05/20/2020 PLUMBING - ROOF DRAINS TTREMBULAK Approved
06/05/2020 ELECTRIC - FINAL WGALLAGHER Approved Partial Approval for SES #1 and #2
ok to energize 2 meter bases
TEP clearance ECO
06/30/2020 PLUMBING - GAS PRESS TEST FNL TTREMBULAK Approved Approved. Clearance for SWGas connect called in to Jesse at 9:00.
08/10/2020 ELECTRIC - ABOVE CEILING WGALLAGHER Approved Partial approval for 1st level bathrooms by entry,
1st level bathrooms and showers by gym, and 2nd level south open office area
08/24/2020 MECHANICAL - HYDRONIC PIPING TTREMBULAK Approved Approved
10/23/2020 FIRE SPKLR - FINAL jfordney Approved
10/26/2020 MECHANICAL - FINAL RSHERRY Approved REVIEW OF PRELIMINARY AIR BALANCE REPORT COMPLETED
10/26/2020 PLUMBING - FINAL RSHERRY Approved REVIEW OF WATER DISINFECTION REPORT COMPLETED
10/27/2020 FIRE - ALARM FINAL jfordney Approved
10/28/2020 FIRE - FINAL jfordney Approved Permanent signs on electrical rooms
Interior standpipes labeled 2" letters
Keys in Knoxbox by main entrance. (Aready in other two)
Verify EM responder radio coverage
Verify Knox key opens Northwest gate
APPROVED TO OBTAIN TCO
10/29/2020 TEP CLEARANCE - PM aquiroz Approved CODE ECO
10/29/2020 ENGINEERING - FINAL rledonne Approved Ok for TCO.Complete all work on approved plan for engineer in final.
10/29/2020 CERTIFICATE OF OCCUPANCY aquiroz Approved Ok for TCO
10/29/2020 ELECTRIC - UFER aquiroz Approved
10/29/2020 ELECTRIC - INTERMEDIATE aquiroz Approved
10/29/2020 ELECTRIC - TEMPORARY SERVICE aquiroz Approved
10/29/2020 ELECTRIC - CONSTRUCTION POWER aquiroz Approved
10/29/2020 ELECTRIC - PROGRESS aquiroz Approved
10/29/2020 ELECTRIC - OUTDOOR LIGHTING aquiroz Approved
10/29/2020 PLUMBING - ABOVE CEILING aquiroz Approved
10/29/2020 PLUMBING - GAS PRESSURE TEST aquiroz Approved
10/29/2020 MECHANICAL - HOOD SYSTEMS aquiroz Approved
10/29/2020 MECHANICAL - ABOVE CEILING aquiroz Approved
10/29/2020 BUILDING - FINAL aquiroz Approved Ok for TCO
10/29/2020 FIREWALL/FIREBARRIER/FIRESTOP aquiroz Approved
10/29/2020 U VALUE FOR WINDOW aquiroz Approved
10/29/2020 STUCCO MESH aquiroz Approved
10/29/2020 EXCAVATION/LAYOUT REBAR & ZON aquiroz Approved
10/29/2020 BUILDING ABOVE CEILING aquiroz Approved
10/29/2020 ROOF NAILING aquiroz Approved
10/29/2020 EXT METAL CLIPS/EXT SHEATHING aquiroz Approved
03/11/2021 OUTDOOR LIGHTING FINAL TTREMBULAK Approved