Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/29/2020 |
MECHANICAL - INTERMEDIATE |
|
Approved |
|
| 04/14/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
1- Overhead Chilled water distribution is okay to cover from Mechanical chase East of grid line 9 and South of grid line C. 1” branch South of grid line C West through corridor to FCU 3.3 at grid line 7A. Advances West to to FCU 3.1 in Electric room between grid lines 4 & 5. Penetration through Mechanical chase at grid line 9 to 3/4” branch East in Corridor and South of grid line C to FUC 3.2 in Extricate room between grid lines 9 to 9A. |
| 04/08/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Unable to make contact for remote inspection. |
| 11/21/2019 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Rained out. |