Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T19CM01353
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2020 | REINFORCED MASONRY PRE-GROUT | Approved | ||
| 07/27/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial approval ok for grout 1st lift stair site wall | |
| 04/08/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Unable to make contact for remote inspection. | |
| 03/26/2020 | REINFORCED MASONRY PRE-GROUT | Cancelled | SI completed; will forward report to me. RVI |
|
| 03/20/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Generator enclosure, first lift | |
| 03/19/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | First lift basketball court. | |
| 12/20/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out main building south wall OK. | |
| 12/19/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | to 11’6" from column 9-14b. | |
| 12/12/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out South side Column lines 1-9. | |
| 12/10/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift, South Side Columns 1-9. | |
| 12/02/2019 | REINFORCED MASONRY PRE-GROUT | Cancelled | on-site by contractor. Looked at North half of HCS. | |
| 11/27/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | First lift from column 11 to 14b. Second lift from columns 3 to 4. | |
| 10/29/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2nd lift, South side to lintels and top-out of West wall. | |
| 10/28/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Northeast stairwell at B-14. From steel beam D-8 to steel beam D-12, 1st lift. | |
| 10/16/2019 | REINFORCED MASONRY PRE-GROUT | Denied | top out grunted prior to inspection.east elec. room top out. | |
| 10/15/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | phase 2 stem wall south side CL 1 to CL 8 ok. | |
| 10/11/2019 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Unable to access for inspection. | |
| 10/10/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out West wall. | |
| 10/08/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift west wall face 1. Electric room t/o 12’. Shipping and receiving 3 rd lift. N/East end. |
|
| 10/04/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Second lift West wall main building OK. | |
| 10/02/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top-out maintenance building. | |
| 09/30/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top our for East and South walls of maintenance building. 4th lift for West and North walls of maintenance building. | |
| 09/27/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | First lift East wall and East end of South wall from corner to fourth column. | |
| 09/20/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out maintenance yard. | |
| 09/18/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Bond beam missing at stem on west and south west, special inspector to confirm, document to be provided at next inspection. | |
| 09/17/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift, Outside walls of maintenance building. | |
| 09/16/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2nd lift; Shipping and Receiving and maintenance yard. | |
| 09/12/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2nd lift for maintenance building and 1st lift for maintenance yard. | |
| 09/11/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | First lift OK at shipping and main electrical room. | |
| 09/06/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1st lift of Maintenance building only; maintenance yard not inspected. |