Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - HYDRONIC PIPING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2020 | MECHANICAL - HYDRONIC PIPING | Approved | Approved | |
| 07/13/2020 | MECHANICAL - HYDRONIC PIPING | Partial Approval | Partial. Fan coils (7 wall hung, 2 ceiling mounted) on all floors. | |
| 06/19/2020 | MECHANICAL - HYDRONIC PIPING | Partial Approval | Partial approval Inspected piping and hangers associated with the following ok for insulation Level 1 inspected pumps 1,2,3 and on chilled water side heat exchangers 1 and 2 Level 2 roof chillers 1,2,3 and air handlers 6 and 7 Level 4 roof air handlers 1A, 1B, 1C, 2A, 3, 4 and 5 |
|
| 02/07/2020 | MECHANICAL - HYDRONIC PIPING | Partial Approval | L1 and2 Chilled Water OH Rough In. |