Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
Permit Number - T19CM01353
Inspection Description - BUILDING ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/29/2020 | BUILDING ABOVE CEILING | Approved | ||
09/21/2020 | BUILDING ABOVE CEILING | Partial Approval | pa 1st floor rooms 118, 114, 111, 112, 102, 138, 144, 145, 174, 175, 161 Ok to drop lids |
|
09/18/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial. Level 1 Multi purpose room east of entryway; reception area west of entryway. Level 2 lobby area off stairs. | |
09/15/2020 | BUILDING ABOVE CEILING | Partial Approval | pa Remainder of 1st floor north hallway, east side lid, ok to cover. |
|
09/01/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial approval for L1 corridor North side to Gen Lab 130 east end all trades ok to install extruded metal ceiling | |
08/28/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial. Level one, #101 & 104, cafe area and hallway by bathrooms. | |
08/27/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial, Gen Lab ok to drop ceiling tiles | |
08/21/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial. Level one, section A labs. Ok to drop tiles. | |
08/20/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial approval for level 3 north east open office area 389 | |
08/18/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial. Third floor #314, NW open office area. | |
08/14/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial. Second floor, north and east side of open area. | |
08/13/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial, Level 1- Area C, Rooms 150, 151, 152, 153, 154, 155, 156, 157 ok to proceed. | |
08/10/2020 | BUILDING ABOVE CEILING | Not ready for Inspection | Not ready | |
08/07/2020 | BUILDING ABOVE CEILING | Cancelled | Cancelled by contractor. Will reschedule. | |
08/05/2020 | BUILDING ABOVE CEILING | Partial Approval | Partial. Third floor #341 open area. Ok to drop ceiling. |