Permit: T19CM01353

Parcel: 128100570


Addresses:

251 S WILLIAMS BL

Inspection Status: Approved

Inspection History: BUILDING ABOVE CEILING

Date Description Inspector Results Comments
10/29/2020 BUILDING ABOVE CEILING Approved
09/21/2020 BUILDING ABOVE CEILING Partial Approval pa

1st floor rooms 118, 114, 111, 112, 102, 138, 144, 145, 174, 175, 161
Ok to drop lids
09/18/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level 1 Multi purpose room east of entryway; reception area west of entryway. Level 2 lobby area off stairs.
09/15/2020 BUILDING ABOVE CEILING Partial Approval pa
Remainder of 1st floor north hallway, east side lid, ok to cover.
09/01/2020 BUILDING ABOVE CEILING Partial Approval Partial approval for L1 corridor North side to Gen Lab 130 east end all trades ok to install extruded metal ceiling
08/28/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level one, #101 & 104, cafe area and hallway by bathrooms.
08/27/2020 BUILDING ABOVE CEILING Partial Approval Partial, Gen Lab ok to drop ceiling tiles
08/21/2020 BUILDING ABOVE CEILING Partial Approval Partial. Level one, section A labs. Ok to drop tiles.
08/20/2020 BUILDING ABOVE CEILING Partial Approval Partial approval for level 3 north east open office area 389
08/18/2020 BUILDING ABOVE CEILING Partial Approval Partial. Third floor #314, NW open office area.
08/14/2020 BUILDING ABOVE CEILING Partial Approval Partial. Second floor, north and east side of open area.
08/13/2020 BUILDING ABOVE CEILING Partial Approval Partial, Level 1- Area C, Rooms 150, 151, 152, 153, 154, 155, 156, 157 ok to proceed.
08/10/2020 BUILDING ABOVE CEILING Not ready for Inspection Not ready
08/07/2020 BUILDING ABOVE CEILING Cancelled Cancelled by contractor. Will reschedule.
08/05/2020 BUILDING ABOVE CEILING Partial Approval Partial. Third floor #341 open area. Ok to drop ceiling.