Permit Details

Status:
L of c
Type:
MULTI FAMILY NEW
Address:
930 E 2ND ST
Address NEW:
930 E 2ND ST
Apply Date:
04/20/2016
Applicant:
N/A
Description:
NEW HOTEL - SHELL
Contractors:
  • U E B BUILDERS INC *** APA ***

Permit Reviews

Permit Number - T16CM02856
Permit Status: L of c
Permit Description: NEW HOTEL - SHELL
Start Date Submittal Complete Date Status  
02/08/2019 PLANS OK TO SUBMIT - COMM 02/08/2019 COMPLETED Review Details
02/12/2019 3RD PARTY REVIEW - COMMERCIAL 04/10/2019 COMPLETED Review Details
02/12/2020 3RD PARTY REVIEW - REVISION/OTHER 02/14/2020 COMPLETED Review Details
04/02/2020 3RD PARTY REVIEW - COMMERCIAL 05/01/2020 COMPLETED Review Details
04/10/2019 POST 3RD PARTY REVIEW 08/23/2019 COMPLETED Review Details
04/20/2016 PLANS OK TO SUBMIT - COMM 04/26/2016 COMPLETED Review Details
04/26/2016 COMMERCIAL - NEW 02/08/2019 COMPLETED Review Details
05/14/2020 3RD PARTY REVIEW - REVISION/OTHER 08/10/2020 COMPLETED Review Details
08/23/2019 3RD PARTY REVIEW - REVISION/OTHER 08/23/2019 COMPLETED Review Details
09/03/2020 3RD PARTY REVIEW - REVISION/OTHER-2ND 09/22/2020 COMPLETED Review Details
09/16/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 09/16/2019 COMPLETED Review Details
10/02/2019 3RD PARTY REVIEW - REVISION/OTHER 10/03/2019 COMPLETED Review Details
10/14/2019 3RD PARTY REVIEW - REVISION/OTHER 10/15/2019 COMPLETED Review Details
11/21/2019 3RD PARTY REVIEW - REVISION/OTHER 11/21/2019 COMPLETED Review Details
12/24/2019 3RD PARTY REVIEW - REVISION/OTHER 01/31/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T16CM02856
Permit Status: L of c
Permit Description: NEW HOTEL - SHELL
Total Outstanding Activity Conditions - 1
Date Name
04/20/2016 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: L of c
Permit Number: T16CM02856
Permit Description: NEW HOTEL - SHELL
Total Completed Inspections - 42
Date Description Inspector Results Comments
12/03/2019 ELECTRIC - ABOVE CEILING JBURGE Approved In wall electric at Level #3; Rooms 315; 317; 319; 322. Rooms at 3 South are not ready.
12/03/2019 MECHANICAL - ABOVE CEILING JBURGE Approved Level #3; Rooms 315; 317; 319; 321; 322. Rooms at 3 South not ready.
12/04/2019 PLUMBING - ABOVE CEILING JBURGE Approved Contractor cancelled.
12/06/2019 BUILDING PRE-SLAB JBURGE Approved Contractor cancelled
12/16/2019 PLUMBING - INTERMEDIATE JBURGE Approved Level #3 East, waste and vent lines in Rooms 344; 348; 349; 350; 350; 351
12/16/2019 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved Level #11 South CMU Columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8; B/9: B/10; B/12; C.1/11; C.1/12; C/7; D.3/11; D.3/12; D.7. Ok to place concrete in progress areas.
12/16/2019 REINFORCED MASONRY PRE-GROUT JBURGE Approved Elevator area #106 at 4’-8’, Level #1. Level#1; West CMU wall topped-out at 18’6”: GL: A/9-12. Ok to place grout in progress areas.
12/30/2019 ELECTRIC - INTERMEDIATE JBURGE Approved Level #4; Rooms 419; 421; 422.
12/30/2019 MECHANICAL - INTERMEDIATE JBURGE Approved Garage Level#1; Hydronic Lines (4"-6"); Zones 1-3; Zone #1; tested up to level #4: Zones 2 & 3 tested up to level #4 (6" lines). All lines tested at 125 psi. Level #4; Rooms 419; 421; 422
12/30/2019 SHEET ROCK NAILING JBURGE Approved Level #2 , Rooms 246; 344. Ok to tape progress areas.
12/30/2019 BUILDING ABOVE CEILING JBURGE Approved Mechanical, Electrical, Plumbing above ceiling in corridor #260 South. Insure all penetrations are properly fire caulked.
12/31/2019 FRAMING JBURGE Approved Level#6; Rooms: 611; 620; 621; 622.
12/31/2019 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved Exterior wall panels; 6004-6005; 6039-4042.
12/31/2019 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved Contractor cancelled.
04/28/2020 TEP CLEARANCE - PM JBURGE Approved CODE ECO
04/30/2020 TEP CLEARANCE - AM JBURGE Approved CODE ECO LEVL 1 SVC DISCN SES 1 & 2
05/20/2020 MECHANICAL - FINAL JBURGE Approved
05/20/2020 PLUMBING - BACK WATER VALVE JBURGE Approved
05/20/2020 PLUMBING - SEWER HCS CONNECT JBURGE Approved
05/20/2020 PLUMBING - GAS PRESS TEST FNL JBURGE Approved
05/20/2020 PLUMBING - MD GAS/PRECONST MTG JBURGE Approved
05/20/2020 PLUMBING - ROOF DRAINS JBURGE Approved
05/20/2020 PLUMBING - PRE SLAB JBURGE Approved
05/20/2020 PLUMBING - ROUGH, SOIL JBURGE Approved
05/20/2020 OUTDOOR LIGHTING FINAL JBURGE Approved
05/20/2020 ELECTRIC - FINAL JBURGE Approved
05/20/2020 ELECTRIC - CABLE DROP JBURGE Approved
05/20/2020 ELECTRIC - UFER JBURGE Approved
05/20/2020 ELECTRIC - UNDERGROUND JBURGE Approved
05/20/2020 STEM WALL/RETAINING WALL JBURGE Approved
05/20/2020 ROOF NAILING JBURGE Approved
11/05/2020 ZONING PROGRESS RSALDAT1 Approved FIELD INSPECTION: CONDUCTED FULL INSPECTION, OPENINGS, ARCHTECTURAL, RENDERINGS AND MATERIALS. FYI, AFTER SPEAKING WITH BUILDING, OWNERS MAY BE LOOKING TO FINAL OUT PERMIT. HAVE PROVIDED A FULL REPORT AND PRESENTATION SHOWING PLANNERS COMPLIANCE. NEXT STEP: WILL MEET WITH MARIA AND NICK TO DISCUSS MY REPORT AND SEE IF FINAL IS APPROPRIATE.
11/17/2020 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved 2090
11/23/2020 PLUMBING - FINAL JBURGE Approved
11/23/2020 BUILDING - FINAL JBURGE Approved Partial. Pending approval of Fire Finals.
11/23/2020 BUILDING - PROGRESS JBURGE Approved
11/23/2020 STUCCO MESH JBURGE Approved
11/23/2020 U VALUE FOR WINDOW JBURGE Approved
02/17/2021 FIRE - FINAL CBASALDUA Approved
02/17/2021 FIRE SPKLR - OH PIPING & HYDRO CBASALDUA Approved
02/17/2021 FIRE SPKLR - FINAL CBASALDUA Approved
02/17/2021 FIRE - ALARM FINAL CBASALDUA Approved