Permit: T16CM02856
Permit Details
Apply Date:
04/20/2016
Applicant:
N/A
Description:
NEW HOTEL - SHELL
Contractors:
- U E B BUILDERS INC *** APA ***
Permit Reviews
Permit Number - T16CM02856
Permit Status: L of c
Permit Description: NEW HOTEL - SHELL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/08/2019 | PLANS OK TO SUBMIT - COMM | 02/08/2019 | COMPLETED |
| 02/12/2019 | 3RD PARTY REVIEW - COMMERCIAL | 04/10/2019 | COMPLETED |
| 02/12/2020 | 3RD PARTY REVIEW - REVISION/OTHER | 02/14/2020 | COMPLETED |
| 04/02/2020 | 3RD PARTY REVIEW - COMMERCIAL | 05/01/2020 | COMPLETED |
| 04/10/2019 | POST 3RD PARTY REVIEW | 08/23/2019 | COMPLETED |
| 04/20/2016 | PLANS OK TO SUBMIT - COMM | 04/26/2016 | COMPLETED |
| 04/26/2016 | COMMERCIAL - NEW | 02/08/2019 | COMPLETED |
| 05/14/2020 | 3RD PARTY REVIEW - REVISION/OTHER | 08/10/2020 | COMPLETED |
| 08/23/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 08/23/2019 | COMPLETED |
| 09/03/2020 | 3RD PARTY REVIEW - REVISION/OTHER-2ND | 09/22/2020 | COMPLETED |
| 09/16/2019 | 3RD PARTY REVIEW - REVISION/OTHER-2ND | 09/16/2019 | COMPLETED |
| 10/02/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 10/03/2019 | COMPLETED |
| 10/14/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 10/15/2019 | COMPLETED |
| 11/21/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 11/21/2019 | COMPLETED |
| 12/24/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 01/31/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T16CM02856
Permit Status: L of c
Permit Description: NEW HOTEL - SHELL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/20/2016 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T16CM02856
Permit Description: NEW HOTEL - SHELL
Total Completed Inspections - 42
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2019 | ELECTRIC - ABOVE CEILING | JBURGE | Approved | In wall electric at Level #3; Rooms 315; 317; 319; 322. Rooms at 3 South are not ready. |
| 12/03/2019 | MECHANICAL - ABOVE CEILING | JBURGE | Approved | Level #3; Rooms 315; 317; 319; 321; 322. Rooms at 3 South not ready. |
| 12/04/2019 | PLUMBING - ABOVE CEILING | JBURGE | Approved | Contractor cancelled. |
| 12/06/2019 | BUILDING PRE-SLAB | JBURGE | Approved | Contractor cancelled |
| 12/16/2019 | PLUMBING - INTERMEDIATE | JBURGE | Approved | Level #3 East, waste and vent lines in Rooms 344; 348; 349; 350; 350; 351 |
| 12/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | Level #11 South CMU Columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8; B/9: B/10; B/12; C.1/11; C.1/12; C/7; D.3/11; D.3/12; D.7. Ok to place concrete in progress areas. |
| 12/16/2019 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | Elevator area #106 at 4’-8’, Level #1. Level#1; West CMU wall topped-out at 18’6”: GL: A/9-12. Ok to place grout in progress areas. |
| 12/30/2019 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | Level #4; Rooms 419; 421; 422. |
| 12/30/2019 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | Garage Level#1; Hydronic Lines (4"-6"); Zones 1-3; Zone #1; tested up to level #4: Zones 2 & 3 tested up to level #4 (6" lines). All lines tested at 125 psi. Level #4; Rooms 419; 421; 422 |
| 12/30/2019 | SHEET ROCK NAILING | JBURGE | Approved | Level #2 , Rooms 246; 344. Ok to tape progress areas. |
| 12/30/2019 | BUILDING ABOVE CEILING | JBURGE | Approved | Mechanical, Electrical, Plumbing above ceiling in corridor #260 South. Insure all penetrations are properly fire caulked. |
| 12/31/2019 | FRAMING | JBURGE | Approved | Level#6; Rooms: 611; 620; 621; 622. |
| 12/31/2019 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | Exterior wall panels; 6004-6005; 6039-4042. |
| 12/31/2019 | FIREWALL/FIREBARRIER/FIRESTOP | JBURGE | Approved | Contractor cancelled. |
| 04/28/2020 | TEP CLEARANCE - PM | JBURGE | Approved | CODE ECO |
| 04/30/2020 | TEP CLEARANCE - AM | JBURGE | Approved | CODE ECO LEVL 1 SVC DISCN SES 1 & 2 |
| 05/20/2020 | MECHANICAL - FINAL | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - BACK WATER VALVE | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - SEWER HCS CONNECT | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - GAS PRESS TEST FNL | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - MD GAS/PRECONST MTG | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - ROOF DRAINS | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - PRE SLAB | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | |
| 05/20/2020 | OUTDOOR LIGHTING FINAL | JBURGE | Approved | |
| 05/20/2020 | ELECTRIC - FINAL | JBURGE | Approved | |
| 05/20/2020 | ELECTRIC - CABLE DROP | JBURGE | Approved | |
| 05/20/2020 | ELECTRIC - UFER | JBURGE | Approved | |
| 05/20/2020 | ELECTRIC - UNDERGROUND | JBURGE | Approved | |
| 05/20/2020 | STEM WALL/RETAINING WALL | JBURGE | Approved | |
| 05/20/2020 | ROOF NAILING | JBURGE | Approved | |
| 11/05/2020 | ZONING PROGRESS | RSALDAT1 | Approved | FIELD INSPECTION: CONDUCTED FULL INSPECTION, OPENINGS, ARCHTECTURAL, RENDERINGS AND MATERIALS. FYI, AFTER SPEAKING WITH BUILDING, OWNERS MAY BE LOOKING TO FINAL OUT PERMIT. HAVE PROVIDED A FULL REPORT AND PRESENTATION SHOWING PLANNERS COMPLIANCE. NEXT STEP: WILL MEET WITH MARIA AND NICK TO DISCUSS MY REPORT AND SEE IF FINAL IS APPROPRIATE. |
| 11/17/2020 | ELECTRIC - OUTDOOR LIGHTING | JBURGE | Approved | 2090 |
| 11/23/2020 | PLUMBING - FINAL | JBURGE | Approved | |
| 11/23/2020 | BUILDING - FINAL | JBURGE | Approved | Partial. Pending approval of Fire Finals. |
| 11/23/2020 | BUILDING - PROGRESS | JBURGE | Approved | |
| 11/23/2020 | STUCCO MESH | JBURGE | Approved | |
| 11/23/2020 | U VALUE FOR WINDOW | JBURGE | Approved | |
| 02/17/2021 | FIRE - FINAL | CBASALDUA | Approved | |
| 02/17/2021 | FIRE SPKLR - OH PIPING & HYDRO | CBASALDUA | Approved | |
| 02/17/2021 | FIRE SPKLR - FINAL | CBASALDUA | Approved | |
| 02/17/2021 | FIRE - ALARM FINAL | CBASALDUA | Approved |