Inspection History Details
Inspection Status: Approved
Inspection History: SHEET ROCK NAILING
Permit Number - T16CM02856
Inspection Description - SHEET ROCK NAILING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2020 | SHEET ROCK NAILING | Approved | ||
| 04/30/2020 | SHEET ROCK NAILING | Partial Approval | Partial. Stairwell #3; Levels 2-14. Ok to tape progress areas. | |
| 04/28/2020 | SHEET ROCK NAILING | Partial Approval | Partial. Level #7 (Burn area corridor). Ok to tape walls and ceiling. | |
| 04/28/2020 | SHEET ROCK NAILING | Partial Approval | Partial. Level #7 (Burn area corridor). Ok to tape walls and ceiling. | |
| 04/24/2020 | SHEET ROCK NAILING | Not ready for Inspection | No contact information to schedule inspection. | |
| 04/21/2020 | SHEET ROCK NAILING | Partial Approval | Level #6 (Burn area); Rooms #630; 631; 632; 633; 634; 634. Ok to tape progress areas. | |
| 04/16/2020 | SHEET ROCK NAILING | Partial Approval | RVI Level #5; Rooms #531; 532; 533; 534; 536. Ok to tape progress areas. | |
| 04/14/2020 | SHEET ROCK NAILING | Partial Approval | RVI Level #4; Burn Area, Rooms 430; 431; 432; 433; 434; 436. Ok to tape progress areas. | |
| 04/08/2020 | SHEET ROCK NAILING | Not ready for Inspection | RVI Contractor cancelled. | |
| 04/06/2020 | SHEET ROCK NAILING | Partial Approval | RVI-Levels #9 and #10; corridor walls and ceilings. Ok to tape progress areas. | |
| 03/20/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 03/19/2020 | SHEET ROCK NAILING | Partial Approval | Level#10; Rooms: 1000; 1001; 1003; 1005; 1007; 1009; 1010; 1011; 1012. Ok to,tape progress areas. | |
| 03/18/2020 | SHEET ROCK NAILING | Partial Approval | Level #12; Rooms 1200; 1201 top-out sheetrock at 18” below deck above. Ok to tape progress areas. | |
| 03/17/2020 | SHEET ROCK NAILING | Partial Approval | Level #9; Rooms: 900; 901; 902; 903; 905; 907; 909; 910; 911; 912. Ok to tape progress. | |
| 03/13/2020 | SHEET ROCK NAILING | Partial Approval | Level #8; Corridor walls and ceiling. Ok to tape progress areas. | |
| 03/12/2020 | SHEET ROCK NAILING | Partial Approval | Level #8; Rooms: 800; 801; 803; 805. Ok to tape progress areas. | |
| 03/11/2020 | SHEET ROCK NAILING | Not ready for Inspection | Canceled by contractor. | |
| 03/10/2020 | SHEET ROCK NAILING | Partial Approval | Level#15; South Elevator Lobby #1561; shafts all 2 hour rated with 2 layers of sheetrock | |
| 03/09/2020 | SHEET ROCK NAILING | Partial Approval | North elevator shafts; West side: Levels #14 to basement. Taped and fire caulked. | |
| 03/06/2020 | SHEET ROCK NAILING | Partial Approval | Top-out sheetrock at 18" from deck above: Level #5; 530; 531; 532; 533; 534; 536. Level #12; 1211; 1230; 1231; 1232; 1236. Ok to tape progress areas. NOTE: At approximately 1000 hours, a tool gang box from CECO Concrete fell from level #14; Southwest area. The box impacted in the street between The Collective and the Marriott Hotel. No injuries were sustained and the proper authorities were notified. The box was removed and work in the area continued. Cause of the falling box is unknown to this Inspector at thIs time, |
|
| 03/04/2020 | SHEET ROCK NAILING | Partial Approval | Level #12; corridor #1260; top-out sheetrock at 18" below deck above. | |
| 02/28/2020 | SHEET ROCK NAILING | Partial Approval | Level #7; Rooms: 700; 702; 707; 709; 710. Ok to tape progress areas. | |
| 02/27/2020 | SHEET ROCK NAILING | Partial Approval | Level #15; Elevator shaft exterior wall sheathing on North and West walls. | |
| 02/26/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled | |
| 02/25/2020 | SHEET ROCK NAILING | Partial Approval | Level #6; Rooms: 600; 601; 602; 603; 605; 607; 609; 610; 619. Ok to tape progress areas. | |
| 02/24/2020 | SHEET ROCK NAILING | Partial Approval | Top-out sheetrock at 18" below above decking at Level #11; Rooms: 1100; 1101; 1102; 1103; 1105; 1107; 1109; 1110; 1112; 1163; 1164. Level #9; Rooms: 900; 901; 902; 903; 904; 905; 907; 909; 910; 911; 912 |
|
| 02/21/2020 | SHEET ROCK NAILING | Partial Approval | Rock ok to tape in units 613, 611, 612 | |
| 02/20/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled | |
| 02/19/2020 | SHEET ROCK NAILING | Partial Approval | Level #6; Rooms: 617; 619; 620; 621; 622. Ok to tape progress areas. | |
| 02/14/2020 | SHEET ROCK NAILING | Not ready for Inspection | Canceled | |
| 02/13/2020 | SHEET ROCK NAILING | Partial Approval | Level #9; top-out at 18” below the deck above: Rooms: 900; 901; 902; 903; 904; 905; 907; 909; 910; 911; 912; 965; Corridor #960. Ok to tape progress areas. | |
| 02/12/2020 | SHEET ROCK NAILING | Partial Approval | Level #8; Rooms: 800; 801; 802; 803; 804; 805; 807; 809; 810; 811; 812. Top out sheetrock at 18" below deck above. Ok to tape progress areas. | |
| 02/11/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 02/10/2020 | SHEET ROCK NAILING | Partial Approval | Level #3; corridor #360; Level #4; Corridor #460; Level #5; corridor #560. Level #5 Rooms: 500; 501; 502; 503; 505; 507; 509; 511; 512; 513. Ok to tape progress areas | |
| 02/07/2020 | SHEET ROCK NAILING | Partial Approval | Level #5; Rooms: 513; 517; 518; 519; 521; 520; 522. Ok to tape progress areas. | |
| 02/06/2020 | SHEET ROCK NAILING | Partial Approval | Level #6; top-out sheetrock at 24" from deck above; corridor #650 and west side rooms. Ok to tape progress areas. | |
| 02/05/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 02/04/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 01/31/2020 | SHEET ROCK NAILING | Partial Approval | Top-out sheetrock nailing at 24" below deck above at Level#9: corridor 960 (North to South student side). | |
| 01/30/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 01/27/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 01/24/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 01/22/2020 | SHEET ROCK NAILING | Partial Approval | Level #4; Rooms 401; 403; 405; 417; 419; 421; 422. Ok to tape progress areas. | |
| 01/17/2020 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 01/16/2020 | SHEET ROCK NAILING | Not ready for Inspection | Per super | |
| 01/15/2020 | SHEET ROCK NAILING | Partial Approval | Top-out sheetrock at 18” below deck above at Level #5; Rooms: 500; 501; 502; 503; 504; 505; 507; 509; 510; 511; 512; 513; 517; 518; 519; 520; 521; 522. | |
| 01/14/2020 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 01/13/2020 | SHEET ROCK NAILING | Partial Approval | Level. #5 Corridor #560: North, East, West Sections. | |
| 01/10/2020 | SHEET ROCK NAILING | Partial Approval | Level #3; Room 315. Ok to tape progress areas | |
| 01/09/2020 | SHEET ROCK NAILING | Partial Approval | Level #4, top out Sheetrock at 18 below deck above; room #404; 402. Sheetrock in rooms; Level #3; Rooms 309; 310; 348; 350; 354. Ok to tape progress areas. | |
| 01/07/2020 | SHEET ROCK NAILING | Partial Approval | Level #3; Rooms: 300; 301; 305; 307; 303; 340; 342. | |
| 01/06/2020 | SHEET ROCK NAILING | Partial Approval | Level #3; Rooms: 311; 313; 317; 317; 319; 321; 322. Ok to tape progress areas. | |
| 01/02/2020 | SHEET ROCK NAILING | Partial Approval | Level#4; Top out at 18 inches from deck above in rooms, 422; 430; 431; 433; 434; 436. Ok to tape progress areas. | |
| 12/30/2019 | SHEET ROCK NAILING | Partial Approval | Level #2 , Rooms 246; 344. Ok to tape progress areas. | |
| 12/24/2019 | SHEET ROCK NAILING | Partial Approval | Level #2; Room 200. Ok to tape progress areas. | |
| 12/20/2019 | SHEET ROCK NAILING | Partial Approval | Level #2; Rooms 201; 203; 240; 242; 348; 350; 252; 354; 255. Ok to tape progress areas | |
| 12/19/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 12/18/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 12/17/2019 | SHEET ROCK NAILING | Cancelled | Contractor cancelled, reschedule for 18 December. | |
| 12/16/2019 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 12/13/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. Level #3; Room 309. | |
| 12/12/2019 | SHEET ROCK NAILING | Partial Approval | Level #4; Rooms 400; 401; 405; 411; 413 top-out at 18” below deck above. Ok to tape progress areas. | |
| 12/10/2019 | SHEET ROCK NAILING | Partial Approval | Level #3 top-out at 30' below deck above in rooms: 300; 301; 303; 305; 307; 309; 340; 342; 344; 348; 349; 351. Ok to tape progress areas. | |
| 12/09/2019 | SHEET ROCK NAILING | Partial Approval | Level #3; top out rooms at 30” below above deck: Rooms 310; 318; 350. Level #4; top out rooms at 18” below above deck: 415; 417; 419; 421. | |
| 12/06/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled | |
| 12/05/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled | |
| 12/03/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 12/02/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 11/26/2019 | SHEET ROCK NAILING | Partial Approval | Level #3; Rooms: Electric Room #374; IDF Room #373; Shaft #360 and 366. Ok to tape progress areas. | |
| 11/22/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 11/21/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. | |
| 11/20/2019 | SHEET ROCK NAILING | Not ready for Inspection | Contractor cancelled. |