| 05/20/2020 |
MECHANICAL - INTERMEDIATE |
|
Approved |
|
| 04/21/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #10; Rooms 1030; 1031; 1032; 1033; 1034; 1036. Duct system and thermostat lines are in place. |
| 04/16/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #9; Rooms #931; 932; 933; 934; 936. Duct system and thermostat landed in place. |
| 04/06/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
RVI-Outside air shafts at Levels 9-14; duct system in place. Level #7; duct system in rooms: 730; 731; 732; 733; 734; 736. |
| 04/02/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #7; all room units and fitness area. Ok to insulate and cover walls in room units. |
| 03/20/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 03/19/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #4; in wall duct system and thermostat lines. |
| 03/17/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 03/13/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 03/12/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #11; Rooms: 1100; 1101; 1103; 1105; 1107; 1109; duct system in place, thermostat locations. |
| 03/11/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Canceled by contractor. |
| 03/10/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level#11; Rooms: 1109; 1110; 1111; 1112; duct systems are in place, thermostat locations set. |
| 03/05/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 03/04/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 03/03/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #10; duct system and thermostats in rooms: 1000; 1001; 1003; 1005; 1007; 1009; 1010; 1011; 1012. |
| 02/26/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #9; electric in walls, Rooms: 900; 901; 902; 903; 904; 905; 907; 910; 911; 912. Ok to cover walls. |
| 02/25/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #6; Rooms: 618; 619. |
| 02/24/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 02/21/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
|
| 02/20/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled |
| 02/19/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #8; Rooms: 800; 802; 864. |
| 02/14/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Fire stopping above lid not complete. |
| 02/13/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #7; Room 710; duct system above ceiling and in walls. |
| 02/12/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 02/11/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #7; Rooms: 700; 701; 702; 703. Duct system in walls and ceiling. |
| 02/10/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level#7; Rooms 707; 709; 711; 712. |
| 02/07/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled |
| 02/06/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Mechanical in walls and above ceilings (Flex duct system). |
| 02/05/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #6; in wall and above ceiling duct systems in rooms: 607; 609; 610; 611; 612; 613 |
| 02/04/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Mechanical duct systems in walls and above ceiling. |
| 01/31/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 01/30/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 01/27/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #5; Rooms: 503; 505; 507. |
| 01/25/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Units 511 and 513 electrical and mechanical OK. Unit 510 mechanical still needs attention.Electrical in 510 approved. |
| 01/23/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #5, Rooms 509; 512. |
| 01/22/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
CONTACTOR CANCELED |
| 01/17/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #5; Rooms: 517; 519; 520; 521; 522. Level #4; Room 418. |
| 01/15/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #3; Room 344. |
| 01/14/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #3; Room 318 |
| 01/13/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 01/10/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
(Mechanical above ceiling); corridor #360. Ensure all corridor penetrations are properly fire caulked. |
| 01/09/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #4; Rooms: 400; 401; 402; 403; 405; 409; 430; 434. Ok to cover walls. |
| 01/07/2020 |
MECHANICAL - INTERMEDIATE |
|
Not ready for Inspection |
Contractor cancelled. |
| 01/06/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #2; Corridors: 266; 319. Level #3: 312; Level #4; Rooms: 411; 412; 413; 415; 417; 420 |
| 01/02/2020 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Hydronic 2" lines; in Mechanical rooms of units at Levels 4 through 6. Ok to insulate lines. |
| 12/30/2019 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Garage Level#1; Hydronic Lines (4"-6"); Zones 1-3; Zone #1; tested up to level #4: Zones 2 & 3 tested up to level #4 (6" lines). All lines tested at 125 psi. Level #4; Rooms 419; 421; 422 |
| 12/19/2019 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level#3; Room 351. Level #4; Rooms 463; 464. |
| 12/18/2019 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Duct systems in rooms 348; 350; 354. |
| 12/17/2019 |
MECHANICAL - INTERMEDIATE |
|
Cancelled |
Contractor cancelled, reschedule for 18 December. |
| 12/13/2019 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #3; Room 309. Ok to insulate and cover walls. |
| 12/10/2019 |
MECHANICAL - INTERMEDIATE |
|
Partial Approval |
Level #3; Rooms: 300; 301; 303; 305; 307; 311; 313; 340; 342 |