Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T16CM02856

Parcel: 12404100A


Addresses:

930 E 2ND ST


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T16CM02856

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
11/23/2020 PLUMBING - INTERMEDIATE Approved
04/22/2020 PLUMBING - INTERMEDIATE Partial Approval RVI Level #6; Domestic water lines under test at approximately 90 psi.
04/16/2020 PLUMBING - INTERMEDIATE Partial Approval RVI Level #5; shower pans and bath tubs hydro tested in Rooms #531; 532; 533; 534; 536.
03/12/2020 PLUMBING - INTERMEDIATE Partial Approval Level #11; Rooms: 1100; 11001; 1103; 1105; 1107; 1109; Plumbing in walls. Domestic water line test at west side: Tested at 122 psi.
03/05/2020 PLUMBING - INTERMEDIATE Partial Approval Level #10; domestic water lines, Hydro tested at 122 psi.
02/20/2020 PLUMBING - INTERMEDIATE Partial Approval Waste and vent lines (2"-4") at Level #10; Rooms 1000; 1001; 1004; 1005; 1009; 1010; 1011; 1012. Level #11; Rooms 1100; 1101; 1102; 1103; 1107; 1109; 1110; 1111; 1112. Level #12; Rooms 1200; 1201; 1203; 1205; 1207; 1209; 1210; 1211; 1212.
02/19/2020 PLUMBING - INTERMEDIATE Partial Approval Level #8; Residential side, domestic water lines, (hot and cold).
02/12/2020 PLUMBING - INTERMEDIATE Partial Approval Level #6 Apartment side; domestic hot and cold water all under hydro test.
02/05/2020 PLUMBING - INTERMEDIATE Partial Approval Level #6; in wall plumbing in rooms: 607; 609; 610; 611; 612;613.
02/04/2020 PLUMBING - INTERMEDIATE Partial Approval Domestic water tested at 110 psi. In rooms: 617; 619; 620; 621; 622.
01/31/2020 PLUMBING - INTERMEDIATE Partial Approval Level #7; waste and vent lines (2"-4"); Rooms: 700; 702; 703; 704; 705; 709; 710; 711; 712.
01/30/2020 PLUMBING - INTERMEDIATE Partial Approval Levels #6; 8; 9: Waste and vent lines in student housing areas.
01/17/2020 PLUMBING - INTERMEDIATE Partial Approval Level #6, Rooms 613; 615; 618; 619; 620; 622. 02035. Partial. In wall electric at Level #5; Rooms 517; 519; 521; 522; 520. Level #4; Room 418.
01/02/2020 PLUMBING - INTERMEDIATE Partial Approval Level #4; domestic hot and cold water lines under test at 110 psi.
12/16/2019 PLUMBING - INTERMEDIATE Partial Approval Level #3 East, waste and vent lines in Rooms 344; 348; 349; 350; 350; 351
12/13/2019 PLUMBING - INTERMEDIATE Partial Approval Level #3; Room 309; waste and vent lines.
12/05/2019 PLUMBING - INTERMEDIATE Partial Approval Level #4; waste and vent lines at West portion; Level#5 at West and South portions; Level #3; West portion (lines 2"-4").
12/04/2019 PLUMBING - INTERMEDIATE Partial Approval Level #4; Rooms: 407; 409; 411; 412; waste and vent lines
06/07/2019 PLUMBING - INTERMEDIATE Prior to Intermediates Prior to intermediate inspection the sewer connection fee for record P19WX01201 shall be paid
06/07/2019 PLUMBING - INTERMEDIATE Prior to Intermediates Prior to intermediate inspection, the design for the private sewer building connection to the existing private sewer with proposed new manhole shall be submitted and approved and construction authorization (CA) shall be issued
06/07/2019 PLUMBING - INTERMEDIATE Not Applicable **Notice** The private sewer connection to the existing private sewer with proposed new manhole to which this building intends to connect has not been approved for construction. Owner/contractor shall proceed entirely at own risk with the understanding that the building sewer connection may be denied thereby resulting in the revocation of this permit. It is strictly the responsibility of the owner and person doing the work to ensure that the sewer connection is approved prior to connecting to the proposed manhole. Note that Intermediate inspections shall not be allowed prior to the construction authorization is allowed.