Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
|
| 04/21/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
South parking garage; CMU wall as 4’-8’. North Parking garage, CMU walls at 8’-12’. Ok to grout progress areas. |
| 12/16/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
Elevator area #106 at 4’-8’, Level #1. Level#1; West CMU wall topped-out at 18’6”: GL: A/9-12. Ok to place grout in progress areas. |
| 12/12/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
Level #1; Loading area; CMU Wall at 12’-16’ at GL: A/9-12. Ok to grout progress areas. |
| 12/03/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
West CMU walls at Residential electric #121: top out at 16’-20’. Pump room #122 at 12’-16’; Fire pump room #123 at 12’-16’. Ok to grout progress areas. |
| 11/27/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
North and West wall of generator room at 12’-16’ (top out). West exterior wall at 12’-16’; GL: 5-7.8. Ok to place grout in progress areas. |
| 11/20/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
West exterior walls at A/1-7.8 at 4’-8’; Residential electric room #121 at 4’-8’; Electric Distribution Room #122, at 4’-8’; Fire Pump Room #123 at 4’-8’, Pump room #124 at 4’-8’; Fire communication center at GL: A-B.5; column at GL: A.2/1 at 0’-4’. Ok to place grout in progress areas. |