Permit: T07CM01151
Permit Details
Apply Date:
03/21/2007
Applicant:
N/A
Description:
NEW HOTEL
Contractors:
- P H I ,
Permit Reviews
Permit Number - T07CM01151
Permit Status: C of o
Permit Description: NEW HOTEL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2008 | RESUBMITTAL - SITE ALL | 02/27/2008 | COMPLETED |
| 02/27/2008 | RESUBMITTAL - SITE ALL | 03/28/2008 | COMPLETED |
| 02/27/2008 | RESUBMITTAL | 03/28/2008 | COMPLETED |
| 02/27/2008 | OTHER | 02/27/2008 | COMPLETED |
| 03/21/2007 | PLANS OK TO SUBMIT - SITE | 03/22/2007 | COMPLETED |
| 03/22/2007 | SITE | 06/26/2007 | COMPLETED |
| 03/23/2009 | REVISION - - 2ND | 03/23/2009 | COMPLETED |
| 03/28/2008 | RESUBMITTAL | 06/23/2008 | COMPLETED |
| 04/23/2009 | REVISION - - 3RD | 04/27/2009 | COMPLETED |
| 04/24/2007 | PLANS OK TO SUBMIT - COMM | 04/24/2007 | COMPLETED |
| 04/24/2007 | COMMERCIAL NEW | 07/11/2007 | COMPLETED |
| 04/29/2009 | REVISION - - 3RD | 04/30/2009 | COMPLETED |
| 05/15/2009 | REVISION - - 4TH | 05/15/2009 | COMPLETED |
| 06/02/2009 | REVISION - SITE | 06/11/2009 | COMPLETED |
| 07/11/2007 | RESUBMITTAL | 08/30/2007 | COMPLETED |
| 08/30/2007 | RESUBMITTAL - SITE ALL | 10/03/2007 | COMPLETED |
| 09/06/2007 | RESUBMITTAL | 10/03/2007 | COMPLETED |
| 09/09/2008 | REVISION - - 1ST | 09/09/2008 | COMPLETED |
| 10/24/2007 | RESUBMITTAL | 11/08/2007 | COMPLETED |
| 10/24/2007 | RESUBMITTAL - SITE ALL | 11/08/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM01151
Permit Status: C of o
Permit Description: NEW HOTEL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/21/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM01151
Permit Description: NEW HOTEL
Total Completed Inspections - 49
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2008 | ELECTRIC - UNDERGROUND | GDABBS | Approved | IVRS - Inspection :* 2 LIGHT POLE BASES ON NORTH SIDE FIRST TWO WEST TO EAST |
| 08/18/2008 | BUILDING PRE-SLAB | MHENSON | Approved | IVRS - Inspection :* REMAINING BLDG. SLAB AND INTERIOR FOOTINGS KRAZEN SPECIAL INSPECTED |
| 08/18/2008 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 08/18/2008 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* |
| 08/28/2008 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* OK CONDUIT SOUTH POLE BASES |
| 09/24/2008 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 09/24/2008 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 11/03/2008 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* OK GUEST ROOMS ROUGH 1ST, 2ND, 3RD, MAINT., LAUNDRY |
| 11/06/2008 | FRAMING | MHENSON | Approved | |
| 11/06/2008 | ROOF NAILING | MHENSON | Approved | IVRS - Inspection :* |
| 11/06/2008 | EXT METAL CLIPS/EXT SHEATHING | MHENSON | Approved | IVRS - Inspection :* |
| 11/10/2008 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | IVRS - Inspection :* PER REDLINE DRAWING TEST OK REDLINE DRAWINGS TO BE APPROVED BY CITY OF TUCSON |
| 11/13/2008 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
| 11/13/2008 | PLUMBING - PROGRESS | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/16/2008 | BUILDING ABOVE CEILING | MHENSON | Approved | IVRS - Inspection :* 3RD FLOOR RMS. 323 THRU 339 AND HALLWAY |
| 12/16/2008 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
| 12/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | MHENSON | Approved | IVRS - Inspection :* PERGOLA FOOTING PER SKA 4 COLUMNS |
| 12/29/2008 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* 1) PREP AREA AND BUFFET AREA 2) LAUNDRY ROOM IN WALL PIPING OK 3) EYE WASH TO 3RD FLOOR MAINT ROOM OK 4) HALLWAY PIPING ? OK |
| 12/29/2008 | SHEET ROCK NAILING | MHENSON | Approved | IVRS - Inspection :* 1) UNDER 1ST FLOOR STAIRS OK |
| 12/29/2008 | STUCCO MESH | MHENSON | Approved | IVRS - Inspection :* 1) REMAINING GATE HOUSE OK |
| 12/29/2008 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/29/2008 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/30/2008 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* 1) OK TO ROCK ALL AREAS MECH ONLY |
| 02/04/2009 | REINFORCED MASONRY PRE-GROUT | MHENSON | Approved | IVRS - Inspection :* |
| 03/30/2009 | TEP CLEARANCE - PM | BFLORES | Approved | OK TO CLEAR TEC - PER D.SANTA CRUZ |
| 04/09/2009 | STEM WALL/RETAINING WALL | MHENSON | Approved | IVRS - Inspection :* |
| 04/30/2009 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 04/30/2009 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 05/11/2009 | U VALUE FOR WINDOW | MHENSON | Approved | IVRS - Inspection :* |
| 05/12/2009 | FIRE - FINAL | LTHOMAS | Approved | |
| 05/12/2009 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
| 05/26/2009 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 06/02/2009 | FIREWALL/FIREBARRIER/FIRESTOP | MHENSON | Approved | IVRS - Inspection :* HOLES REPAIRED |
| 06/03/2009 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* ELECTRIC ROOM: 1. GROUNDED CONDUCTORS ATTACHED TO BREAKERS 2. FINISH PANEL SCHEDULES 408.4 LAUNDRY ROOM: 1. SEPARATE GROUNDED AND GROUNDING CONDUCTOR AT DISCONNECTS 250.24 2. LABEL DISCONNECTS 3. BOND ENCLOSURES 4. CORRECTLY IDENTIFY UNGROUNDED CONDUCTORS 5. BOND PANEL ENCLOSURE 6. FIXTURES TO HAVE DISCONNECTING MEANS 410.63 AND GROUND FIXTURES RISER ROOM: 1. USE APPROVED FITTINGS WITH M/C CABLE 2. FILL UNUSED OPENINGS IN BOXES 3. HEATER NOT AS PER PLANS NEED DISCONNECTING MEANS |
| 06/03/2009 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* RECEIVED CK#008059000 - $300.00 1. LABEL A/C DISCONNECTS 2. SPLICES TO BE FOR WET LOCATION |
| 06/03/2009 | BUILDING - PROGRESS | MHENSON | Approved | IVRS - Inspection :* |
| 06/03/2009 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection :* |
| 06/03/2009 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
| 06/03/2009 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 06/03/2009 | ENGINEERING - FINAL | DROBERTS | Approved | THE SITE HAS BEEN CERTIFIED BY THE ENGINEER OF RECORD FOR THE RETENTION/DETENTION BASINS, OFF-SITE DRAINAGE ISSUES, AND THAT THE SITE IS ADA ACCESSIBLE. THE ONLY REMAINING ITEM THAT HAS NOT BEEN COMPLETED AT THIS TIME IS ITEM #2) STABILIZE ALL DISTURBED AREAS FROM THE PREVIOUS INSPECTION COMMENTS. THIS ITEM WILL BE CHECKED PRIOR TO THE FINALIZATION OF THE GRADING PERMIT REF. #T07BU00618. |
| 06/03/2009 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
| 06/03/2009 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
| 06/03/2009 | NPPO - FINAL | ACONNOR | Approved | |
| 06/04/2009 | ELECTRIC - TEMP POWER FOR TEST | RHOLLAND | Approved | |
| 06/04/2009 | PLUMBING - ABOVE CEILING | RLEDONNE | Approved | |
| 06/04/2009 | SIGN - FINAL | LHANLY | Approved | |
| 06/08/2009 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 06/10/2009 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* |
| 06/11/2009 | PERMIT FINALED | DROBEY | Approved |