Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 06/03/2009 | ELECTRIC - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 05/18/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 05/04/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 04/30/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 04/28/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 04/22/2009 | ELECTRIC - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* NEED TO CHECK WITH ELECTRICAL CONTRACTOR BEFORE CALLING INSPECTIONS. HAVE ELECTRICAL CONTRACTOR GO THROUGH AREAS AND MAKE SURE THEY ARE READY. UNNECESSARY INSPECTIONS WILL RESULT IN REINSPECTION FEE. INSPECTED STOPPED BY G.C. BECAUSE NOT READY. |
|
| 04/17/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 04/10/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL SEISMIC WIRE ON EXITS AND RECESSED FIXTURES |
|
| 03/09/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* OK 2ND FLOOR CORRIDOR CEILING |
|
| 02/18/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* OK SOFFIT LTG. 1ST FLOOR ELEVATOR LOBBY AND HALLWAY BY LOBBY |