Permit: T07CM01151

Parcel: 14042080C

Inspection Status: Denied

Inspection History: ELECTRIC - UNDERGROUND

Date Description Inspector Results Comments
06/03/2009 ELECTRIC - UNDERGROUND Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
06/03/2009 ELECTRIC - UNDERGROUND Approved IVRS - Inspection :*
04/22/2009 ELECTRIC - UNDERGROUND Not ready for Inspection IVRS - Inspection :*
04/21/2009 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK TO ADD BOLTS FOR BOLLARDS AT POOL

1. DO NOT POOR COOL DECK UNTIL EQUPOTENTIAL BOND IS INSPECTED ON POOL PERMIT
04/17/2009 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
04/16/2009 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK UNDERGROUND FOR BOLLARDS AS DISCUSSED
04/15/2009 ELECTRIC - UNDERGROUND Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1. CONDUITS TO BE AS PER 300.5
2. SUPPORT & SECURE NM CABLE WITHIN 12" OF BOXES
3. GROUND METAL BOXES
03/31/2009 ELECTRIC - UNDERGROUND Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
UF CABLE TO BE MIN. 24" DEEP PLEASE VERIFY
IF UF CABLE IS ALLOWED FOR USE.
02/02/2009 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1. OK REMAINDER OF 4" SECONDARYS
2. CHECK FOR BRACING REQUIREMENTS FOR SECONDARY FEEDERS
3. BOND MUST BE POSTED FOR TEMP POWER FOR TEST
4. CHECK FOR WATER & GAS BONDING
08/15/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
2 LIGHT POLE BASES ON NORTH SIDE
FIRST TWO WEST TO EAST
08/12/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK 4" DATA/COMM FROM BLD. TO 50' SOUTH & WEST
OK 1 1/2 PVC FOR LIGHT POLES NORTH PARKING & EAST
07/28/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1. OK 7-4" PVC FROM EDGE OF BUILDING TO SES
2. OK 1 - 1 1/2" PVC FROM SES TO EDGE OF BUILDING FOR EPO
3. OK BRANCH CIRCUITS & FEEDERS FROM LIS TO EDGE OF BUILDING & HEADING NORTH 30'