Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2009 | ENGINEERING - FINAL | Approved | THE SITE HAS BEEN CERTIFIED BY THE ENGINEER OF RECORD FOR THE RETENTION/DETENTION BASINS, OFF-SITE DRAINAGE ISSUES, AND THAT THE SITE IS ADA ACCESSIBLE. THE ONLY REMAINING ITEM THAT HAS NOT BEEN COMPLETED AT THIS TIME IS ITEM #2) STABILIZE ALL DISTURBED AREAS FROM THE PREVIOUS INSPECTION COMMENTS. THIS ITEM WILL BE CHECKED PRIOR TO THE FINALIZATION OF THE GRADING PERMIT REF. #T07BU00618. | |
| 06/02/2009 | ENGINEERING - FINAL | Denied | DAVID ROBERTS AND I MET ON SITE WITH MIKE LANDAU CONTRACTOR NEEDS TO COMPLETE ALL SITE WORK PER APPROVED PLAN. 1)ADDRESS GRATE ON S/S ENTRANCE 2) STABILIZE ALL DISTURBED AREAS 3) ENGINEER NEEDS TO CERTIFY BOTH BASINS 4) COMPLETE WATER HAVRESTING AREAS ON S/S OF BLDG. TO PREVENT WATER FROM CROSSING SIDE WALK 5) REMOVE ALL CONSTRUCTION DEBRIS FROM PUBLIC AREAS 6) SWEEP AND REMOVE TRACKOUT FROM PARKING LOTS AND BAY COLONY DRIVE. REF. T07BU00618 |
|
| 06/01/2009 | ENGINEERING - FINAL | Denied | 1)COMPLETE ALL SITE WORK PER APPROVED PLAN 2) COMPLETE PUNCH LIST ITEMS 1,3,4,6,7,8,10 AND 12 3) ADDRESS THE FOLLOWING ITEMS: INSTALL H/C SIGNAGE INSTALL H/C ACCESS PATH SIGNAGE COMPLETE WATER HARVESTING AREAS ON SOUTH SIDE OF BLDG. AND VARIOUS LOCATIONS PER OUR DISCUSSION. CLEAR ALL SCUPPERS OF DIRT AND DEBRIS. GRATE ON S/S ENTRANCE NEEDS TO BE ADDRESSED GENERAL SITE CLEAN UP AND REMOVAL OF TRACK-OUT ON STREET 4) STABILIZE ALL DISTURBED AREAS 5) ENGINEER NEEDS TO CERTIFY BOTH BASINS--BASIN ON N/W SIDE OF PROPERTY SHOULD BE SCARIFIED. |
|
| 05/26/2009 | ENGINEERING - FINAL | Denied | DENIED. COMPLETE ALL SITE WORK PER APPROVED PLAN. COMPLETE NECESSARY PUNCH LIST ITEMS AS REFERENCED ON 5/21/09. | |
| 05/21/2009 | ENGINEERING - FINAL | Denied | Contractor needs to complete all site work per approved plan. REF PERMIT # T07BU00618 1) Construct basin on e/s of property per approved plan and in accordance with standards. Have engineer address the following: a) verify volume b) need for handrailing c) plans call for grouted rip-rap d) basin certification 2) H/C parking on south-side of building needs to be verified @ 2%, unable to verify at time of inspection due to placement of construction materials. 3) Address rear roof drains (splash pads…) 4) Ensure that all sidewalk scuppers are cleared of dirt and debris 5) Eliminate drainage over H/C access points on the south-east and rear center of the building 6) Remove all construction debris 7) Stabilize all areas disturbed by construction, Re-Hydro seed the southside of property where area has been re-disturbed. 8) Remove construction dumpsters 9) Dumpster for building needs to be placed in trash enclosure 10) Complete basin at the North-west corner of property per approved drawings: including but not limited to a) uncovering weir b) slope stabilization c) trash clean up 11) Place bumper blocks on parking spaces on both sides of front entrance per approved plan 12) Address expired permit status, no other engineering inspections will be completed until the expired status is removed |