Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/30/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/05/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PROVIDE CITY OF TUCSON APPROVED PLANS 2. PARTIAL APPROVAL PER REDLINE DRAWING |
|
| 08/04/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE GRADE ON ALL PIPING 2. REPAIR ALL LEAKS BEFORE CALLING FOR INSPECTION |
|
| 07/30/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CONTRACTOR IS USING A CAP DRAWING WHICH SHALL SERVE AS THE REDLINE INSPECTION AT THIS TIME. WATER TEST FROM WEST END OF BLD. THRU TO SANITARY SYSTEM TO 6" PIPE STUBBED OUT OF BUNDLE C PER INITIAL ON SITE. THESE PLANS AND REVISED APPROVED PLANS WILL BE REQUIRED TO BE APPROVED BY CITY AT LATER DATE AND BE ON SITE. MAKE REPAIR AT UNIT 134 & 136 - 2" TUB RISER DRAIN |
|
| 07/29/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* THIS INSPECTION WITH PLB CONTRACTOR & DESIGNER AND GENERAL CONTR. TO EXPLAIN REDLINE REQUIREMENTS FOR CHANGES TO APPROVED PLANS. REDLINES OF CHANGES ARE REQUIRED AT TIME OF INSPECTION WITH CITY APPROVED PLANS OF THESE TO FOLLOW AND BOTH TO BE ON SITE. CONTRACTOR TAKES ALL RESPONSIBILITY FOR CHANGES OR CORRECTIONS TO PLB SYSTEMS IF REQUIRED AT TIME REDLINES & CITY APPROVED PLANS ARE PRODUCED |
|
| 07/28/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* INSTALL ALL PIPING PER APPROVED PLAN 2" & 3" PIPING REQUIRES MINIMUM 1/4" PER FOOT FALL |