Permit: T07CM01151

Parcel: 14042080C

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
12/29/2008 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
09/30/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
08/05/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. PROVIDE CITY OF TUCSON APPROVED PLANS
2. PARTIAL APPROVAL PER REDLINE DRAWING
08/04/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1. PROVIDE GRADE ON ALL PIPING
2. REPAIR ALL LEAKS BEFORE CALLING FOR INSPECTION
07/30/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
CONTRACTOR IS USING A CAP DRAWING WHICH SHALL SERVE AS THE REDLINE INSPECTION AT THIS TIME. WATER TEST FROM WEST END OF BLD. THRU TO SANITARY SYSTEM TO 6" PIPE STUBBED OUT OF BUNDLE C PER INITIAL ON SITE. THESE PLANS AND REVISED APPROVED PLANS WILL BE REQUIRED TO BE APPROVED BY CITY AT LATER DATE AND BE ON SITE. MAKE REPAIR AT UNIT 134 & 136 - 2" TUB RISER DRAIN
07/29/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
THIS INSPECTION WITH PLB CONTRACTOR & DESIGNER AND GENERAL CONTR. TO EXPLAIN REDLINE REQUIREMENTS FOR CHANGES TO APPROVED PLANS. REDLINES OF CHANGES ARE REQUIRED AT TIME OF INSPECTION WITH CITY APPROVED PLANS OF THESE TO FOLLOW AND BOTH TO BE ON SITE.
CONTRACTOR TAKES ALL RESPONSIBILITY FOR CHANGES OR CORRECTIONS TO PLB SYSTEMS IF REQUIRED AT TIME
REDLINES & CITY APPROVED PLANS ARE PRODUCED
07/28/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
INSTALL ALL PIPING PER APPROVED PLAN
2" & 3" PIPING REQUIRES MINIMUM 1/4" PER FOOT FALL