Parcel Search: 14042025A
Parcel Search
Parcel Attributes
| Parcel | 14042025A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 5 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 4:23 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 14042025A
Date - 08/17/2026 4:23 a.m.
Total Number Of Permits - (33)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TF-FOP-0125-00015 | Complete | 01/06/2025 | 01/15/2025 | Fire Operational Permit | Tent - 40x60 | |
| TC-COM-0126-00078 | Issued | 01/20/2026 | 09/01/2026 | UNIT 150 | Commercial Building | Erect and Anchor Tall metal shelving (new pallet rack from Interlake Mecalux). No field welding. Licensed contractor is Storage Equipment Systems. Occupancy in suite by GC permits. |
| TF-FOP-0126-00086 | Complete | 01/20/2026 | 02/25/2027 | UNIT 150 | Fire Operational Permit | High Pile review. Install of Pallet racks is TC-COM-0126-00078. All suite occupancy is under GC's permit TC-COM-0325-00541 |
| TC-CFO-0126-00018 | Complete | 01/21/2026 | 02/27/2026 | UNIT 150 | Certificate of Occupancy | Willmeng requests temporary certificate of occupancy on suite 150 of the Corona Commerce Center project due to the building permit T22CM05804 and development permit DP22-0214 remaining open due to remediation work ongoing in the north storm water retention area. Construction is complete on suite 150 and we have passed all final inspections and satisfied all conditions except closing out the building and development permits of the shell building. We request level 4 occupancy level for a period of 30 days. |
| TC-COM-0125-00177 | Complete | 01/28/2025 | 03/30/2026 | Commercial Building | Retaining Wall - Main Permit Building T22CM05804 and DP22-0214 | |
| TF-FCP-0225-00097 | Complete | 02/03/2025 | 03/04/2026 | Fire Construction Permit | SHELL BLDG., ARCHITECT PLANS SHOW 2717 ADDRESS ALSO DEDICATED FUNCTION SPRINKLER-MONITORING SYSTEM, NO OCCUPANCY | |
| TR-ROW-0225-00163 | Complete | 02/04/2025 | 06/25/2025 | Right-of-Way (ROW) | The contractor will open trenching to install 4"-inch conduit for TEP for Benjamin Sepulveda for High Quality Electric. | |
| TC-COM-0325-00539 | Complete | 03/18/2025 | 07/20/2026 | UNIT 110 | Commercial Building | Commercial tenant improvement for existing shell building |
| TC-COM-0325-00540 | Complete | 03/18/2025 | 07/20/2026 | UNIT 140 | Commercial Building | Commercial tenant improvement for exiting shell building |
| TC-COM-0325-00541 | Complete | 03/18/2025 | 07/20/2026 | UNIT 150 | Commercial Building | Tenant improvement to an exiting shell building |
| TC-COM-0325-00542 | Complete | 03/18/2025 | 07/20/2026 | UNIT 160 | Commercial Building | REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building. |
| TC-COM-0325-00543 | Complete | 03/18/2025 | 07/20/2026 | UNIT 170 | Commercial Building | REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building. |
| TC-COM-0325-00544 | Complete | 03/18/2025 | 07/20/2026 | UNIT 190 | Commercial Building | REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: New layouts, Floor Plan, Charts, calcs, finish schedule, demising wall between gridlines F&E, interior finish, casework, wood doors specs added, MEP Tenant improvement on existing shell building. |
| TZ-CMP-0425-00060 | Complete | 04/17/2025 | N/A | Zoning Verification Letter | light industrial project under construction | |
| TR-ROW-0525-00711 | Complete | 05/21/2025 | 08/31/2025 | Right-of-Way (ROW) | This right of way work will be associated with the Corona Commerce Center project. Project Building Permit #T22CM05804 and Development Permit #DP22-0214. The scope involves adding a sidewalk and drive entrances to the project on the Corona Road side. PER PAG STANDARD DETAIL 200&206 Renew 60 days as of 07/02/2025, new expiration date 08/31/2025 | |
| TR-UTL-0525-00859 | Inspections | 05/29/2025 | 08/05/2025 | Right-of-Way (ROW) - Utility | Installing approximately 1000' of new main in dirt via bore method. | |
| TS-PRM-0626-00238 | Inspections complete | 06/23/2026 | 02/08/2027 | UNIT 150 | Sign - Permanent | Install one set of non illuminated flat cut out aluminum letters |
| TF-FCP-0625-00511 | Complete | 06/26/2025 | 02/07/2026 | Fire Construction Permit | Underground Fire Line | |
| T22CM05804 | Complete | 07/29/2022 | 08/11/2026 | Commercial Building | Proposed construction of a 147,646 sf concrete tilt shell/speculative building and associated site w | |
| TS-PRM-0825-00329 | Issued | 08/01/2025 | 03/22/2026 | Sign - Permanent | Install (2) non illuminated monument signs consisting of non illuminated 1/2" thick flat cut out letters mounted flush to balck granite tile background on cast in place concrete bases. Bases to be installed by others. | |
| DP22-0214 | Complete | 08/08/2022 | 02/12/2029 | Development Package | Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park. | |
| TR-ROW-0925-01084 | Complete | 09/03/2025 | 11/24/2025 | Right-of-Way (ROW) | **CONTINUATION OF PERMIT TR-ROW-0525-00711** This right of way work will be associated with the Corona Commerce Center project. Project Building Permit #T22CM05804 and Development Permit #DP22-0214. The scope involves adding a sidewalk and drive entrances to the project on the Corona Road side. PER PAG STANDARD DETAIL 200&206 | |
| TF-FCP-0925-00711 | Complete | 09/04/2025 | 03/22/2026 | UNIT 110 | Fire Construction Permit | modification to existing system 17 new 5.6k 155 Deg. Pendents and 10 new 16.8k 212 Deg. ESFR Pendents. |
| TF-FCP-0925-00712 | Complete | 09/04/2025 | 03/22/2026 | UNIT 140 | Fire Construction Permit | modification to existing system 17 new 5.6k 155 Deg. Pendents and 10 new 16.8k 212 Deg. ESFR Pendents. |
| TF-FCP-0925-00713 | Complete | 09/04/2025 | 03/23/2026 | UNIT 150 | Fire Construction Permit | modification to existing system 18 new 5.6k 155 Deg. Pendents and 42 new 16.8k 212 Deg. ESFR Pendents. |
| TF-FCP-0925-00714 | Complete | 09/04/2025 | 03/22/2026 | UNIT 160 | Fire Construction Permit | modification to existing system 10 new 5.6k 155 Deg. Pendents and 1 new 16.8k 212 Deg. ESFR Pendent. |
| TF-FCP-0925-00715 | Complete | 09/04/2025 | 03/22/2026 | UNIT 170 | Fire Construction Permit | modification to existing system 11 new 5.6k 155 Deg. Pendents and 1 new 16.8k 212 Deg. ESFR Pendent. |
| TF-FCP-0925-00716 | Complete | 09/04/2025 | 03/22/2026 | UNIT 190 | Fire Construction Permit | modification to existing system 17 new 5.6k 155 Deg. Pendents and 42 new 16.8k 212 Deg. ESFR Pendents. |
| TR-UTL-1024-01937 | Complete | 10/08/2024 | 02/22/2025 | Right-of-Way (ROW) - Utility | WO T128805. TEP TO REPLACE POLE. | |
| TF-FCP-1124-00922 | Complete | 11/04/2024 | 08/04/2025 | Fire Construction Permit | Install (4) wet pipe ESFR fire sprinkler systems. | |
| TF-FCP-1225-01013 | Complete | 12/05/2025 | 06/30/2026 | UNIT 150 | Fire Construction Permit | MODIFICATION, ADDING 2 CONTROL MODULES |
| TZ-PMT-1224-00091 | Complete | 12/19/2024 | 03/07/2026 | Zoning Permit Annual | This is a temporary use permit for the jobsite trailer. | |
| TR-UTL-1225-02204 | Complete | 12/29/2025 | 04/05/2026 | Right-of-Way (ROW) - Utility | COX TO OVERLASH 1571' AERIAL FIBER AND COAX, PULL 150' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE. SET NEW 2'X3' VAULT |
Plans
Parcel Number - 14042025A
Date - 08/17/2026 4:23 a.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TW-CWH-0226-00011 | Active | 02/12/2026 | N/A | Water Conservation and Harvesting | Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park. CRWH PLAN |