Permit: TC-COM-0126-00078
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
2717 E CORONA RD UNIT 150
Address NEW:
2717 E CORONA RD UNIT 150
Apply Date:
01/20/2026
Applicant:
Jeff Spiek
Description:
Erect and Anchor Tall metal shelving (new pallet rack from Interlake Mecalux). No field welding. Licensed contractor is Storage Equipment Systems. Occupancy in suite by GC permits.
Permit Reviews
Permit Number - TC-COM-0126-00078
Permit Status: Issued
Permit Description: Erect and Anchor Tall metal shelving (new pallet rack from Interlake Mecalux). No field welding. Licensed contractor is Storage Equipment Systems. Occupancy in suite by GC permits.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2026 | SPECIAL INSPECTION REVIEW v.2 | 03/16/2026 | APPROVED |
| 02/13/2026 | COMMERCIAL REVIEW - FULL v.2 | N/A | APPROVED |
| 01/21/2026 | COMMERCIAL REVIEW - FULL v.1 | 02/10/2026 | REQUIRES RESUBMIT |
| 03/05/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/06/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0126-00078
Permit Status: Issued
Permit Description: Erect and Anchor Tall metal shelving (new pallet rack from Interlake Mecalux). No field welding. Licensed contractor is Storage Equipment Systems. Occupancy in suite by GC permits.
| Date | Description | Comments |
|---|---|---|
| 03/16/2026 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 01/21/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/21/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0126-00078
Permit Description: Erect and Anchor Tall metal shelving (new pallet rack from Interlake Mecalux). No field welding. Licensed contractor is Storage Equipment Systems. Occupancy in suite by GC permits.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2026 | COT - FCON - Fire - Final | Passed | ||
| 03/05/2026 | COT - LCBU - Building Final | Passed | 3-5-26: racking system installed per plans. Building final approved. |