Permit: TR-UTL-0525-00859
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2717 E CORONA RD
Address NEW:
2717 E CORONA RD
Apply Date:
05/29/2025
Applicant:
Erika Fund
Description:
Installing approximately 1000' of new main in dirt via bore method.
Permit Reviews
Permit Number - TR-UTL-0525-00859
Permit Status: Inspections
Permit Description: Installing approximately 1000' of new main in dirt via bore method.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2025 | RIGHT-OF-WAY REVIEW v.2 | 06/03/2025 | APPROVED |
| 05/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/02/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00859
Permit Status: Inspections
Permit Description: Installing approximately 1000' of new main in dirt via bore method.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/30/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 05/30/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0525-00859
Permite Description: Installing approximately 1000' of new main in dirt via bore method.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 07/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 07/30/2025 | TRSP - ROW - Final | N/A | Re-inspection required | |
| 09/19/2025 | TRSP - ROW - Bituminous Treatment | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0525-00859
Permit Description: Installing approximately 1000' of new main in dirt via bore method.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |