Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/18/2025
Applicant:
Avinash Karnati
Description:
REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.

Permit Reviews

Permit Number - TC-COM-0325-00543
Permit Status: Complete
Permit Description: REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.
Start Date Submittal Complete Date Status  
12/22/2025 RESTAMP - COMMERCIAL v.1 12/23/2025 APPROVED Review Details
10/29/2025 COMMERCIAL REVIEW - FULL REVISION v.1 11/18/2025 APPROVED Review Details
12/01/2025 COMMERCIAL REVIEW - FULL REVISION v.1 12/22/2025 APPROVED Review Details
03/20/2025 COMMERCIAL REVIEW - FULL v.1 04/16/2025 REQUIRES RESUBMIT Review Details
04/23/2025 COMMERCIAL REVIEW - FULL v.2 05/13/2025 REQUIRES RESUBMIT Review Details
05/20/2025 COMMERCIAL REVIEW - FULL v.3 05/20/2025 APPROVED Review Details
05/20/2025 RESTAMP - COMMERCIAL v.1 05/28/2025 APPROVED Review Details
01/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/21/2026 APPROVED Review Details
09/02/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0325-00543
Permit Status: Complete
Permit Description: REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.
Date Description Comments
03/20/2025 UNIT IDENTIFICATION
03/20/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/20/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/20/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00543
Permite Description: REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/24/2025 COT - HCPL - Plumbing Intermediate N/A Canceled 10-24-25: canceled by contractor.
10/24/2025 COT - HCEL - Electrical Intermediate N/A Canceled 10-24-25: canceled by contractor.
11/25/2025 COT - HCBU - Building Progress N/A Partial Pass 11/25/2025 partial pass. Screw inspection approved on demising wall.
12/16/2025 COT - HCEL - Electrical Progress N/A Partial Pass 12-16-25: will check HVAC receptacles on rooftop at finals.
10/01/2025 COT - HCME - Mechanical Progress N/A Partial Pass 10-1-25: verified duct trunk, round duct work and sealing of joints.
01/14/2026 COT - FCON - Alarm - Final N/A Not Applicable
01/05/2026 COT - HCME - Mechanical Final N/A Canceled 1-5-26: canceled by contractor.
10/24/2025 COT - HCME - Mechanical Intermediate N/A Canceled 10-24-25: canceled by contractor.
01/05/2026 COT - HCBU - Building Final N/A Canceled 1-5-26: canceled by contractor.
01/05/2026 COT - HCEL - Electrical Final N/A Canceled 1-5-26: canceled by contractor.
01/05/2026 COT - HCPL - Plumbing Final N/A Canceled 1-5-26: canceled by contractor.
09/15/2025 COT - HCPL - Plumbing Progress N/A Re-inspection required 9-15-25: arrived on site at approximately 950am and noted that pour back had already occurred. Therefore, provide a letter to the city for review & approval documenting that pour back at plumbing areas was done per the 2018 IBC and per approved plans. The Letter must be submitted & approved prior to releasing a C of O.
01/21/2026 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00543
Permit Description: REV2: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. REV1: Electrical: Sheet E0.1 • Updated the Sheet Index. Sheet E1.3 • Added Lighting Demolition Sheet. Sheet E2.3 • Revised Lighting circuiting and Switching in Warehouse. Sheet E2.6 • Revised Lighting circuiting in Vestibule. Sheet E6.2 • Revised Lighting load on Panel Schedule ‘S150H’. Sheet Response G0. 0 Revised Schedule of Drawings to included E1.3. G0.1 Revised History of Drawings. E1.3 added. G0.2 - G1.0 Demising walls now shown as being built under th eir respective suite permits. A0.1 Door Schedule updated to include vestibule doors. Door hardware group 4 added to schedule to accommodate vestibules . A1.1 – A1.12 Demising walls included under this permit were updated, tagged, and clouded. Vestibules noted and dimensioned. Bollards added around electrical panels and transformers in warehouse . A7.2 Detail 6 added for contractor constructability. Tenant improvement on existing shell building.
Total Completed Inspections - 17
Date Description Inspector Results Comments
11/18/2025 COT - HCPL - Plumbing Intermediate Passed 11-18-25: plumbing intermediate approved.
11/20/2025 BULD - Electrical Clearance Passed 11-20-25: okay to energize Suite 170. ECO clearance issued to TEP.
11/20/2025 COT - HCEL - Electrical Above Ceiling Passed 11-20-25: approved.
11/20/2025 COT - HCEL - Electrical Intermediate Passed 11-20-25: approved.
01/08/2026 COT - HCBU - Building Progress Passed 1-8-26: approved.
01/08/2026 COT - HCEL - Electrical Progress Passed 1-8-26: approved.
01/08/2026 COT - HCME - Mechanical Progress Passed 1-8-26: approved.
01/14/2026 COT - FCON - Fire - Final Passed
01/14/2026 ENGR Engineering Final Passed 1/14/25 - unit 170 exterior is complete and safe
01/14/2026 TRSP - ROW - Final/Close-Out Passed
01/14/2026 COT - FCON - Sprinkler - Final Passed Approved on 1/5/26 on permit TF-FCP-0925-00715
01/14/2026 COT - HCME - Mechanical Final Passed 1-14-26: approved.
01/14/2026 COT - HCME - Mechanical Intermediate Passed 1-14-26: approved.
01/20/2026 COT - HCBU - Building Final Passed 1-20-26: building final approved.
01/20/2026 COT - HCEL - Electrical Final Passed 1-20-26: electrical final approved.
01/20/2026 COT - HCPL - Plumbing Final Passed 1-20-26: plumbing final approved.
01/20/2026 COT - HCPL - Plumbing Progress Passed 1-20-26: approved.