Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/18/2025
Applicant:
Avinash Karnati
Description:
Commercial tenant improvement for existing shell building

Permit Reviews

Permit Number - TC-COM-0325-00539
Permit Status: Complete
Permit Description: Commercial tenant improvement for existing shell building
Start Date Submittal Complete Date Status  
09/02/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/26/2025 APPROVED Review Details
12/03/2025 COMMERCIAL REVIEW - FULL REVISION v.1 12/29/2025 APPROVED Review Details
10/29/2025 COMMERCIAL REVIEW - FULL REVISION v.1 11/24/2025 APPROVED Review Details
03/20/2025 COMMERCIAL REVIEW - FULL v.1 04/15/2025 REQUIRES RESUBMIT Review Details
01/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/21/2026 APPROVED Review Details
04/23/2025 COMMERCIAL REVIEW - FULL v.2 05/13/2025 REQUIRES RESUBMIT Review Details
05/20/2025 RESTAMP - COMMERCIAL v.1 05/28/2025 APPROVED Review Details
05/20/2025 COMMERCIAL REVIEW - FULL v.3 05/20/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0325-00539
Permit Status: Complete
Permit Description: Commercial tenant improvement for existing shell building
Date Description Comments
03/20/2025 UNIT IDENTIFICATION
03/20/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/20/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/20/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00539
Permite Description: Commercial tenant improvement for existing shell building
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
10/30/2025 COT - HCBU - Building Progress N/A Partial Pass 10/30/25 framing per plan, ok to proceed in suite
12/10/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass All of front office areas approved. Okay to drop ceiling tiles in place. 12/10/2025
12/10/2025 COT - HCEL - Electrical Above Ceiling N/A Partial Pass All of front office areas approved. Okay to drop ceiling tiles in place. 12/10/2025
12/10/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass All of front office areas approved. Okay to drop ceiling tiles in place. 12/10/2025
12/16/2025 COT - HCEL - Electrical Progress N/A Partial Pass 12-16-25: will check HVAC receptacles on rooftop at finals.
12/10/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass All of front office areas approved. Okay to drop ceiling tiles in place. 12/10/2025
09/16/2025 COT - HCPL - Plumbing Progress N/A Partial Pass 9-16-25: reinforcement verified per A7.1 Detail 6-okay for pour back.
01/14/2026 COT - FCON - Alarm - Final N/A Not Applicable
01/15/2026 COT - HCBU - Building Final N/A Re-inspection required 1-15-26: install bollard to protect water heater-have architect submit documentation to the city with details, seal penetrations above ceiling at warehouse to office space, provide pictures of labeled junction boxes in warehouse side, adjust interior glass door & warehouse door to office to 5 pounds of pressure, complete installation of drinking fountain and will check water at next inspection.
01/15/2026 COT - HCME - Mechanical Final N/A Re-inspection required 1-15-26: install bollard to protect water heater-have architect submit documentation to the city with details, seal penetrations above ceiling at warehouse to office space, provide pictures of labeled junction boxes in warehouse side, adjust interior glass door & warehouse door to office to 5 pounds of pressure.
01/15/2026 COT - HCPL - Plumbing Final N/A Re-inspection required 1-15-26: install bollard to protect water heater-have architect submit documentation to the city with details, seal penetrations above ceiling at warehouse to office space, provide pictures of labeled junction boxes in warehouse side, adjust interior glass door & warehouse door to office to 5 pounds of pressure.
01/21/2026 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00539
Permit Description: Commercial tenant improvement for existing shell building
Total Completed Inspections - 17
Date Description Inspector Results Comments
12/17/2025 COT - HCBU - Building Progress Passed 12-17-25: drywall nailing approved-okay to tape/texture.
01/05/2026 BULD - Electrical Clearance Passed 1-5-26: okay to energize Unit 110-2. ECO clearance issued to TEP.
01/08/2026 COT - HCME - Mechanical Intermediate Passed 1-8-26: approved.
01/08/2026 COT - HCEL - Electrical Above Ceiling Passed 1-8-26: approved.
01/08/2026 COT - HCEL - Electrical Intermediate Passed 1-8-26: electrical intermediate approved.
01/08/2026 COT - HCEL - Electrical Progress Passed 1-8-26: approved.
01/08/2026 COT - HCME - Mechanical Progress Passed 1-8-26: approved.
01/08/2026 COT - HCPL - Plumbing Intermediate Passed 1-8-26: plumbing intermediate approved.
01/08/2026 COT - HCPL - Plumbing Progress Passed 1-8-26: approved.
01/14/2026 COT - FCON - Fire - Final Passed
01/14/2026 ENGR Engineering Final Passed 1/14/25 - unit 110 exterior is complete and safe
01/14/2026 TRSP - ROW - Final/Close-Out Passed
01/14/2026 COT - FCON - Sprinkler - Final Passed Approved on 1/5/26 on permit TF-FCP-0925-00711
01/15/2026 COT - HCEL - Electrical Final Passed 1-15-26: approved.
01/20/2026 COT - HCBU - Building Final Passed 1-20-26: building final approved.
01/20/2026 COT - HCME - Mechanical Final Passed 1-20-26: mechanical final approved.
01/20/2026 COT - HCPL - Plumbing Final Passed 1-20-26: plumbing final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
SUITE 110 TEST - BALANCE_V1.PDF DOCUMENTS VIEW
TORQUE REPORT SUITES 110, 140, 150, 160, 170 - 190_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CORONA SPEC TI PERMIT REVISION 3 11-24-25_V1.PDF DOCUMENTS VIEW
NARRATIVE OF CHANGES 11-24-2025_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CORONA TI SPEC SUITE 110 REVISIONS 10-29-25_V1.PDF DOCUMENTS VIEW
NARRATIVE OF CHANGES 10-28-2025_V1.PDF DOCUMENTS VIEW
NARRATIVE OF CHANGES ELECTRICAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2025-09-02 CORONA TI SUITE 110_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CORONA TI SET RESUBMITTAL SUITE 110 4-21-25_V2.PDF DOCUMENTS VIEW
CHECKSHEET RESPONSE LETTER 04-21-25_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS_SEALED 4-21-25_V1.PDF DOCUMENTS VIEW
SUITE 110 COMCHECK 04-25-2025_V1.PDF DOCUMENTS VIEW