Permit Details

Status:
Complete
Type:
Development Package
Address:
2717 E CORONA RD
Address NEW:
2717 E CORONA RD
Apply Date:
08/08/2022
Applicant:
Description:
Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park.

Permit Reviews

Permit Number - DP22-0214
Permit Status: Complete
Permit Description: Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park.
Start Date Submittal Complete Date Status  
08/08/2022 DEV PKG - OK TO SUBMIT 09/05/2022 COMPLETED Review Details
09/05/2022 DEV PKG 10/13/2022 COMPLETED Review Details
04/24/2023 DEVELOPMENT PACKAGE REVIEW v.4 04/28/2023 REQUIRES RESUBMIT Review Details
02/14/2023 DEVELOPMENT PACKAGE REVIEW v.3 03/16/2023 REQUIRES RESUBMIT Review Details
11/21/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/21/2022 REQUIRES RESUBMIT Review Details
12/13/2024 DEVELOPMENT PACKAGE NEW REVISION v.3 01/09/2025 APPROVED Review Details
10/30/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 11/07/2024 REQUIRES RESUBMIT Review Details
11/07/2024 DEVELOPMENT PACKAGE NEW REVISION v.2 12/13/2024 REQUIRES RESUBMIT Review Details
06/05/2023 DEVELOPMENT PACKAGE REVIEW v.5 07/05/2023 APPROVED Review Details
12/05/2022 DEVELOPMENT PACKAGE REVIEW v.2 01/04/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - DP22-0214
Permit Status: Complete
Permit Description: Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park.
Date Description Comments
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT
01/06/2025 Retaining Wall requires separate commercial wall permit

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0214
Permite Description: Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
12/19/2024 ENGR - Drainage Structures N/A Complete (Recurring) this also included the pipe inspection. Structures are good to pour, pipe is good to backfill
11/12/2024 NPPO Pre-Construction N/A Partial Pass
02/03/2025 NPPO Monitoring N/A Complete (Recurring) Temporary irrigation is working well here, no concerns
09/15/2025 N/A Partial Pass 9/15/25, An as-built will be completed to cover the rings around all clean outs and manholes to be concrete rings instead of asphalt. 9" at the ring and 6" at the edge with 2 #4 rebar rings.
11/19/2025 ENGR Paving N/A Partial Pass contractor called in the wrong inspection contractor needed to call in consultation inspection for the crosswalk on the north east corner from the building to the trash area in that crosswalk area noncompliance. Inform the contractor to get a letter from the engineer of record stating that he accepts the paving in that area .
11/06/2025 N/A Partial Pass 1. Pedestrian circulation from ROW to the SE corner of the building is good, cross-slope at or below 2%
2. Egress points are being corrected by removing curb, will require re-inspection once complete.
3. Pedestrian circulation to refuse enclosure at NE of property to be redone in concrete to achieve slope requirements. Will require re-inspection once complete.
4. ADA parking at NW will be corrected to less than 2% slope in all directions. Will require re-inspection once complete.
10/20/2025 ENGR Engineering Final N/A Partial Pass Contractor has not addressed the punchlist that we made up last week

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0214
Permit Description: Revision 1 - Site/Grading/Swppp - Corona Commerce Center. New industrial park.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/19/2024 NPPO Pre-Construction Passed
09/04/2025 Consultation SITE Passed Question on storm drain covers and rings.
09/29/2025 NPPO Final Passed
09/29/2025 LAND Landscape Appearance & Function Final Passed
11/04/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Passed Sign footer not built to approved plans. It is placed a few feet to the west because of a coms line conflict. It does comply otherwise.
01/12/2026 For trash and recycling enclosures Passed
01/12/2026 ENGR Paving Passed
01/12/2026 Passed is the engineering record past the sidewalk on the south end of building A
02/12/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CORONA DP REVISED SHELL SET 12-19-24_V1.PDF DOCUMENTS VIEW