Permit: TC-COM-0825-01478
Permit Details
Apply Date:
08/07/2025
Applicant:
Arthur Schlegel
Description:
TENANT IMPROVEMENT 6500 SF B-OCCUPANCY AND (2) 2964 SF F-2 OCCUPANCY ADDITIONS, (1) ON EACH SIDE OF EXISTING BUILDING Revision 2 Started 03.16.2026 ** Revision 1: delta 4 - 2/24/2026 (NEW: fire rated wall, doors, exterior & interior concrete slabs, equipment's, welding gas tank & pad, restroom, eyewash, roof steel frame & evaporative cooler) REV2: delta-5. Owner installed equipment and power requirement changes.
Permit Reviews
Permit Number - TC-COM-0825-01478
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT 6500 SF B-OCCUPANCY AND (2) 2964 SF F-2 OCCUPANCY ADDITIONS, (1) ON EACH SIDE OF EXISTING BUILDING
Revision 2 Started 03.16.2026 ** Revision 1: delta 4 - 2/24/2026 (NEW: fire rated wall, doors, exterior & interior concrete slabs, equipment's, welding gas tank & pad, restroom, eyewash, roof steel frame & evaporative cooler)
REV2: delta-5. Owner installed equipment and power requirement changes.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 02/24/2026 | APPROVED |
| 12/17/2025 | RESTAMP - COMMERCIAL v.1 | 12/19/2025 | APPROVED |
| 08/07/2025 | COMMERCIAL REVIEW - FULL v.1 | 08/28/2025 | REQUIRES RESUBMIT |
| 12/08/2025 | COMMERCIAL REVIEW - FULL v.3 | 12/17/2025 | APPROVED |
| 06/12/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/15/2026 | APPROVED |
| 09/12/2025 | COMMERCIAL REVIEW - FULL v.2 | 10/15/2025 | REQUIRES RESUBMIT |
| 06/23/2026 | SPECIAL INSPECTION REVIEW v.1 | 06/25/2026 | APPROVED |
| 03/16/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/25/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0825-01478
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT 6500 SF B-OCCUPANCY AND (2) 2964 SF F-2 OCCUPANCY ADDITIONS, (1) ON EACH SIDE OF EXISTING BUILDING
Revision 2 Started 03.16.2026 ** Revision 1: delta 4 - 2/24/2026 (NEW: fire rated wall, doors, exterior & interior concrete slabs, equipment's, welding gas tank & pad, restroom, eyewash, roof steel frame & evaporative cooler)
REV2: delta-5. Owner installed equipment and power requirement changes.
| Date | Description | Comments |
|---|---|---|
| 08/28/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/28/2025 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. (PLACEMENT OF CAST-IN-PLACE BOLTS) | |
| 08/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/28/2025 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. (SUBMIT FABRICATOR'S CERTIFICATE OF COMPLIANCE OR SPECIAL INSPECTION REPORT TO RESOLVE) | |
| 02/23/2026 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 08/28/2025 | SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED. | |
| 08/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/28/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 08/28/2025 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED.( INSPECTION MAY BE WAIVED WHEN PERFORMED IN A PRE-APPROVED SHOP) | |
| 06/01/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01478
Permite Description: TENANT IMPROVEMENT 6500 SF B-OCCUPANCY AND (2) 2964 SF F-2 OCCUPANCY ADDITIONS, (1) ON EACH SIDE OF EXISTING BUILDING
Revision 2 Started 03.16.2026 ** Revision 1: delta 4 - 2/24/2026 (NEW: fire rated wall, doors, exterior & interior concrete slabs, equipment's, welding gas tank & pad, restroom, eyewash, roof steel frame & evaporative cooler)
REV2: delta-5. Owner installed equipment and power requirement changes.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | COT - LCPL - Rough Soil | N/A | Not Applicable | |
| 02/09/2026 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | East side: footings and slab areas for equipment pad and fabrication area. Ok to place concrete in,-regress areas. |
| 02/09/2026 | COT - LCBU - Preslab | N/A | Partial Pass | East side slab areas for equipment pad and fabrication areas. Ensure slab areas are termite treated. Ok to place concrete in progress areas. |
| 04/13/2026 | BULD - Electrical Clearance | N/A | Not Ready | 4-13-26: not ready-have TEP set transformer and pull feeders for tie in. |
| 05/27/2026 | COT - FCON - Fire - Final | N/A | Re-inspection required | Address for building, FDC sign, FACP sign, Knox box, fire extinguishers. Sprinkler head in storage room shall be moved due to cabinets, heads for the head box. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01478
Permit Description: TENANT IMPROVEMENT 6500 SF B-OCCUPANCY AND (2) 2964 SF F-2 OCCUPANCY ADDITIONS, (1) ON EACH SIDE OF EXISTING BUILDING
Revision 2 Started 03.16.2026 ** Revision 1: delta 4 - 2/24/2026 (NEW: fire rated wall, doors, exterior & interior concrete slabs, equipment's, welding gas tank & pad, restroom, eyewash, roof steel frame & evaporative cooler)
REV2: delta-5. Owner installed equipment and power requirement changes.
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2026 | COT - LCEL - Electrical Intermediate | Passed | Passed 1/29/26 | |
| 01/29/2026 | COT - LCBU - Framing | Passed | Passed 1/29/26 | |
| 02/25/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 02/25/2026 | COT - LCBU - Preslab | Passed | ||
| 03/17/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Dust collector support pad approved. Okay for concrete placement. 3/17/2026 | |
| 05/04/2026 | COT - LCPL - Plumbing Intermediate | Passed | 5-4-26: approved. | |
| 05/26/2026 | COT - LCME - Mechanical Intermediate | Passed | 5-26-26: mechanical intermediate approved. | |
| 06/01/2026 | COT - LCME - Mechanical Final | Passed | 6-1-26: plumbing & mechanical final approved. | |
| 06/01/2026 | COT - LCPL - Plumbing Final | Passed | 6-1-26: plumbing & mechanical final approved. | |
| 06/05/2026 | COT - LCEL - Grounding/Bonding | Passed | 6-5-26: grounding/bonding approved. | |
| 06/05/2026 | COT - LCEL - Electrical Underground | Passed | 6-5-26: electrical underground approved. | |
| 06/05/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 6-5-26: electrical above ceiling approved. | |
| 06/05/2026 | COT - HCEL - Electrical Intermediate | Passed | 6-5-26: electrical intermediates at office areas together with warehouse approved. | |
| 06/08/2026 | COT - FCON - Fire - Final | Passed | ||
| 06/08/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 06/09/2026 | COT - LCEL - Electrical Final | Passed | 6-9-26: electrical final approved. | |
| 06/11/2026 | COT - LCBU - Roof Nailing | Passed | 6-11-26: roof nailing approved. | |
| 07/08/2026 | ENGR Engineering Final | Passed | Building site is safe and free of construction activity. | |
| 08/04/2026 | COT - LCBU - Building Final | Passed |