Inspection Status: Canceled
Inspection History: COT - LCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 02/02/2026 |
COT - LCBU - Preslab |
|
Canceled |
Canceled per contractor. 2/1/2026 |
| 02/03/2026 |
COT - LCBU - Preslab |
|
Partial Pass |
New machine room 130. Reinforcement per plan okay for concrete placement. 2/3/2026 |
| 02/04/2026 |
COT - LCBU - Preslab |
|
Partial Pass |
2-4-26: pre slab/excavation & reinforcement for slab on grade and columns/columns tie on footings along the east side of building verified per plans/ S2.0, S2.0/details 101, 105, 108, 109, C3/F2, C3/F3. Okay for concrete placement at progress areas. |
| 02/06/2026 |
COT - LCBU - Preslab |
|
Partial Pass |
2-6-26: 5/8" drywall screw inspection at 1 hr. Fire rated walls for office space areas- okay to tape & texture. |
| 02/09/2026 |
COT - LCBU - Preslab |
|
Partial Pass |
East side slab areas for equipment pad and fabrication areas. Ensure slab areas are termite treated. Ok to place concrete in progress areas. |
| 02/18/2026 |
COT - LCBU - Preslab |
|
Partial Pass |
2-18-26: reinforcement at slab on grade/footing located on west side verified per RFI26. RFI to be submitted to the city for review. Also verified reinforcement for pad on west side per detail 109-#4 @12" o.c.... Okay to pour pad and RFI26 at own risk pending city approval. |
| 02/25/2026 |
COT - LCBU - Preslab |
|
Passed |
|