Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/04/2026 |
COT - LCPL - Plumbing Final |
|
Re-inspection required |
5-4-26: install ADA restroom signs at latch side of doors- see plans for height details,install restroom mirrors to 40" to the reflective surface and install vertical grab bars,condensate drain at warehouse cannot drain into sink-have architect submit a detail showing re-locate of condensate, have architect also submit a letter documenting which restrooms are intended to meet ADA requirements and seek clarification on how warehouse restroom is to be labeled. |
| 05/26/2026 |
COT - LCPL - Plumbing Final |
|
Partial Pass |
5-26-26: install evaporator coolers, install R3 insulation at hose bibs, label all disconnects-see NEC requirements for minimum lettering height requirements, seal HVAC line set at wall penetrations, HVAC refrigerant caps must be lockable, install hammer arrestor at dishwasher line, protection of HVAC line set requires shielding of not less than 6' from the equipment using removable material and adhesive tape is prohibited. |
| 06/01/2026 |
COT - LCPL - Plumbing Final |
|
Passed |
6-1-26: plumbing & mechanical final approved. |