Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/27/2021
Applicant:
Erin Dick
Description:
New Hotel

Permit Reviews

Permit Number - T21CM00864
Permit Status: Complete
Permit Description: New Hotel
Start Date Submittal Complete Date Status  
01/27/2021 COMMERCIAL - NEW 03/18/2021 COMPLETED Review Details
04/30/2022 REVISION - - 2ND 05/18/2022 COMPLETED Review Details
05/24/2022 REVISION - - 3RD 06/07/2022 COMPLETED Review Details
06/28/2022 REVISION - - 3RD 07/12/2022 COMPLETED Review Details
07/07/2021 RESUBMITTAL 08/06/2021 COMPLETED Review Details
09/28/2021 RESUBMITTAL 10/07/2021 COMPLETED Review Details
11/22/2021 REVISION - - 1ST 12/07/2021 COMPLETED Review Details
04/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.3 04/20/2023 APPROVED Review Details
04/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/06/2023 REQUIRES RESUBMIT Review Details
12/08/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/14/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T21CM00864
Permit Status: Complete
Permit Description: New Hotel
Total Outstanding Activity Conditions - 2
Date Name
07/20/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/20/2021 SPECIAL INSPECTION IS REQUIRED FOR EIFS

Conditions

Permit Number - T21CM00864
Permit Status: Complete
Permit Description: New Hotel
Date Description Comments
07/20/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/20/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/20/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
07/20/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/20/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/20/2021 SHOP DRAWINGS REQUIRED FOR STEEL STAIRS
07/20/2021 SPECIAL INSPECTION IS REQUIRED FOR POST INSTALL ANCHORS

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM00864
Permite Description: New Hotel
Total Outstanding Inspections - 23
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
12/01/2022 COT - HCPL - Plumbing Intermediate N/A Partial Pass partial approval for first floor common area lobby
10/26/2022 COT - HCPL - Gas Pressure Test N/A Not Ready
01/18/2023 COT - BULD - SWG Clearance N/A Not Ready
01/17/2023 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
01/17/2023 COT - HCEL - Electrical Above Ceiling N/A Not Ready
01/17/2023 COT - HCME - Mechanical Above Ceiling N/A Not Ready
01/17/2023 COT - HCBU - Building Above Ceiling N/A Not Ready
01/17/2023 COT - HCPL - Plumbing Above Ceiling N/A Not Ready
02/28/2023 COT - HCME - Kitchen Hood N/A Not Applicable
10/26/2022 COT - HCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - HCEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - HCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - HCBU - Framing N/A Not Ready
10/26/2022 COT - HCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - HCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - HCEL - Electrical Intermediate N/A Not Ready
11/07/2022 COT - FCON - Sprinkler - Final N/A Not Ready No message was on permit to contact the general contractor could not find them on site. Subs did not call in their permit.

11/7/22 - This was for OH/Hydro of First Floor. Not ready for a Sprinkler Final.
10/26/2022 COT - HCPL - Sewer N/A Not Ready
10/26/2022 COT - HCME - Mechanical Final N/A Not Ready
03/06/2023 COT - HCEL - Electrical Final N/A Partial Pass
COT - FCON - Fire - Final N/A Not Ready Still need to finish punch list items.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM00864
Permit Description: New Hotel
Total Completed Inspections - 41
Date Description Inspector Results Comments
01/28/2022 COT - HCPL - Rough Soil Passed {Activity date: 01/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/27/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Under foundation waste lines installed and tested from (GL 8-21) ok to backfill progress areas.

} ; {Activity date: 01/20/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Sanitary & Grease lines installed and tested from GL-1-8 OK to backfill and prep slab.}
03/08/2022 COT - HCBU - Masonry Pregrout Passed {Activity date: 03/08/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, final lift for CMU Elevator shaft complete.} ; {Activity date: 03/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 12TH lift CMU Elevator shaft @ 48’ ok to grout.} ; {Activity date: 03/04/2022; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by VVERA1 - cancelled by Contractor due to wind} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - No inspection required today see previous notes.} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, 8TH LIFT CMU elevator shaft ok to grout and proceed.} ; {Activity date: 02/28/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 7th lift CMU Elevator shaft ok for grout.} ; {Activity date: 02/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial.- 5th & 6th lift of CMU @ Elevator shaft ok to grout and proceed.} ; {Activity date: 02/23/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, 4TH lift CMU @Elevator shaft ok to grout and proceed.} ; {Activity date: 02/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 3RD LIFT for CMU ELEVATOR SHAFT WALLS OK for grout.} ; {Activity date: 02/18/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for 2nd lift (10’-4” from pit) of the CMU elevator shaft, okay to grout} ; {Activity date: 02/09/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Not Ready} ; {Activity date: 01/20/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, first lift for elevator shaft CMU walls ok to grout and proceed.}
03/14/2022 COT - HCPL - Backwater Valve Passed {Activity date: 03/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
03/14/2022 COT - HCPL - Plumbing Progress Passed {Activity date: 03/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Grease interceptor installed and tested ok to backfill.} ; {Activity date: 02/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 3” main line stubbed in foundation out of slab under test and ok to backfill.}
03/16/2022 COT - HCBU - Preslab Passed {Activity date: 03/16/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/15/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR}
05/27/2022 COT - HCBU - Roof Nailing Passed {Activity date: 05/27/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/13/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Not ready.} ; {Activity date: 04/04/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, CANOPY and second floor deck nailing ok to proceed.} ; {Activity date: 03/30/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, continued progress for 2nd floor deck nailing ok to proceed.} ; {Activity date: 03/16/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for 2nd floor deck on the south side and continued on north side up to elevator shaft.} ; {Activity date: 03/08/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 2nd floor deck nailing from GL 10-21 North of corridor ok to proceed.}
06/01/2022 COT - FCON - Underground Flush Passed {Activity date: 06/01/2022; Status: Approved; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - }
06/01/2022 COT - FCON - Underground Pressure Passed {Activity date: 06/01/2022; Status: Approved; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - }
08/15/2022 COT - HCEL - Construction Power Passed {Activity date: 08/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok for clearance ECO
}
08/15/2022 BULD - Electrical Clearance Passed {Activity date: 08/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - CODE ECO}
11/09/2022 COT - HCPL - Plumbing Roof Drains Passed
11/22/2022 COT - HCBU - Interior Shear Bracing Passed
12/13/2022 COT - HCPL - Plumbing Intermediate Passed partial approval for meeting room above hard lids
01/04/2023 COT - HCPL - Gas Pressure Test Passed
01/13/2023 COT - HCME - Mechanical Progress Passed
01/13/2023 COT - HCBU - Building Progress Passed
01/13/2023 COT - HCEL - Electrical Progress Passed
01/27/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed All penetrations through firewall are properly fire caulked.
01/27/2023 COT - HCEL - Electrical Above Ceiling Passed All J-boxes are labeled, all penetration through firewalls are fire caulked, all conduit is properly supported, all fire alarm J-boxes & conduits are painted red and labeled properly.
01/27/2023 COT - HCME - Mechanical Above Ceiling Passed All mechanical ductwork is properly supported on the first floor corridor, meeting rooms, and break rooms. air supply and return registers are installed in grid ceiling. okay to install ceiling tiles.
01/27/2023 COT - HCBU - Building Above Ceiling Passed First floor corridors, break rooms, and meeting rooms are complete. Okay to install ceiling tiles.
01/27/2023 COT - HCPL - Plumbing Above Ceiling Passed All plumbing pipes and fire sprinkler pipes are properly supported to plumbing rack. Okay to install ceiling tile.
03/01/2023 COT - HCBU - Exterior Clips/Sheathing Passed
03/01/2023 COT - HCEL - Grounding/Bonding Passed
03/01/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
03/01/2023 COT - HCEL - Electrical Underground Passed
03/01/2023 COT - HCBU - Framing Passed
03/01/2023 COT - HCME - Mechanical Intermediate Passed
03/01/2023 COT - HCEL - Outdoor Lighting Passed
03/01/2023 COT - HCBU - Sustainability Passed
03/02/2023 COT - HCEL - Electrical Intermediate Passed
04/05/2023 COT - FCON - Sprinkler - Final Passed
04/05/2023 COT - FCON - Alarm - Final Passed
03/03/2023 COT - HCPL - Sewer Passed
03/06/2023 COT - HCME - Mechanical Final Passed
03/08/2023 COT - HCPL - Plumbing Final Passed Plumbing is complete to all rooms and common areas.
03/14/2023 COT - HCEL - Electrical Final Passed
03/30/2023 COT - HCBU - Building Final Passed
04/13/2023 ENGR Engineering Final Passed
04/13/2023 COT - ENGR - Site - Assurance Release Passed
04/13/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
2942JZ181, HSL CONSTRUCTION SERVICES, SPRINGHILL SUITES C.O.T. FINAL_V1.PDF DOCUMENTS VIEW
2942JZ181, HSL CONSTRUCTION SERVICES, SPRINGHILL SUITES C.O.T. FINAL-2023-04-06_V1.PDF DOCUMENTS VIEW
SPRINGHILL SUITES (CHLORINATION REPORT)_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
SPRINGHILL BY MARRIOTT - KCME TAB REVIEW CORRECTIONS_V1.PDF DOCUMENTS VIEW
TEST AND BALANCE REPORT T21CM00864_V1.PDF DOCUMENTS VIEW
SPRINGHILL BY MARRIOTT - KCME TAB REVIEW CORRECTIONS_V1.PDF DOCUMENTS VIEW
TEST AND BALANCE REPORT T21CM00864_V1.PDF DOCUMENTS VIEW
T21CM000864 TCO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
SPRINGHILL SUITES TCO_2022.12.30.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRC APPROVAL.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
EMAIL FROM ADDRESSING.PDF DOCUMENTS VIEW
GEOTECHNICAL EVALUATION REPORT.PDF DOCUMENTS VIEW
ENVELOPE COMCHECK.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
SPECIFICATION SET.PDF DOCUMENTS VIEW
SPECICAL INSPECTION CERT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
REV1_REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV1_PLAN SET 1.PDF CONSTRPLANS VIEW
REV1_PLAN SET 2.PDF CONSTRPLANS VIEW
REV2_STAIR FABRICATION R4.PDF DOCUMENTS VIEW
REV2_WOOD TRUSS SHOP DRAWINGS.PDF DOCUMENTS VIEW
REV3_REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV3_PLAN SET.PDF CONSTRPLANS VIEW