Inspection Status: Complete (Recurring)

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
03/14/2023 ENGR Engineering Final Complete (Recurring) Contractor formed storm drain from existing to new one on the northside and one on the southside. Remove the pile of spoils that’s on the northside of the building and the trash bin container needs to be removed.
03/14/2023 ENGR Engineering Final Partial Pass OK FOR TCO LEVEL 4 FOR ALL FLOORS
04/07/2023 ENGR Engineering Final Partial Pass
04/13/2023 ENGR Engineering Final Passed