Permit: T05CM05118
Permit Details
Status:
C of o
Type:
COMMERCIAL ADDITION
Address:
2420 N JACKRABBIT AV
Address NEW:
2420 N JACKRABBIT AV
Apply Date:
10/07/2005
Applicant:
AMCO ENTERPRISES INC ,
Description:
BLDG ADDITION
Contractors:
- AMCO ENTERPRISES INC ,
Permit Reviews
Permit Number - T05CM05118
Permit Status: C of o
Permit Description: BLDG ADDITION
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/03/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 04/26/2007 | COMPLETED |
| 02/02/2006 | RESUBMITTAL - SITE ALL | 03/28/2006 | COMPLETED |
| 02/02/2006 | RESUBMITTAL | 03/28/2006 | COMPLETED |
| 04/21/2006 | RESUBMITTAL - SITE ALL | 04/24/2006 | COMPLETED |
| 04/21/2006 | RESUBMITTAL | 04/24/2006 | COMPLETED |
| 04/26/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 01/22/2008 | COMPLETED |
| 06/12/2006 | RESUBMITTAL | 06/12/2006 | COMPLETED |
| 10/06/2006 | REVISION - - 1ST | 11/16/2006 | COMPLETED |
| 10/07/2005 | PLANS OK TO SUBMIT - COMM | 10/19/2005 | COMPLETED |
| 10/07/2005 | PLANS OK TO SUBMIT - SITE | 10/19/2005 | COMPLETED |
| 10/19/2005 | SITE | 12/13/2005 | COMPLETED |
| 10/19/2005 | 3RD PARTY REVIEW-COMMERCIAL TI | 11/23/2005 | COMPLETED |
| 11/23/2005 | POST 3RD PARTY REVIEW | 12/13/2005 | COMPLETED |
| 12/13/2005 | RESUBMITTAL - SITE ALL | 02/02/2006 | COMPLETED |
| 12/13/2005 | RESUBMITTAL | 02/02/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM05118
Permit Status: C of o
Permit Description: BLDG ADDITION
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/07/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM05118
Permit Description: BLDG ADDITION
Total Completed Inspections - 30
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2006 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1. N/H UNDERGROUND OK WATER TEST ONE RISER TO TEN FEET 2. OK TO COVER |
| 10/11/2006 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* OK TO PLACE FOOTING CAPS (GET RFI FOR COLD JOINT) |
| 10/23/2006 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/13/2006 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1. YOU MAY NOT CONNECT THE BLDG. SEWER UNTIL YOU HAVE AUTHORITY TO DISCHARGE FROM PCDEQ. 2. PROVIDE INSPECTINO HISTORY, INCLUDING ALL TESTS FOR PRIVATE SEWER. |
| 12/19/2006 | FRAMING | JBURGE | Approved | IVRS - Inspection :* OK TO SHEETROCK ONE SIDE THROUGHOUT ENSURE BACKING FOR GRAB BARS IS PROPERLY INSTALLED IN ALL RESTROOMS. |
| 12/19/2006 | ELECTRIC - INTERMEDIATE | CCLEMENS | Approved | IVRS - Inspection :* OK TO COVER WALLS IN ENTRY OFFICE AREA AND 2 REAR BATH AREAS WALLS AND HARD LIDS. |
| 12/19/2006 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* |
| 01/04/2007 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* 1. EXHAUST DUCTS UPSIDE DOWN 2. INSTALL LOW VOLTAGE WIRES PER NEC 3. OK TO SHEETROCK RESTROOMS 4. WILL CHECK ON ABOVE CEILING INSPECTION 5. SECONDARY DRAIN PAN MUST BE MIN. 1 1/2" LARGER ON ALL SIDES OF FAN COIL. |
| 01/26/2007 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/02/2007 | ELECTRIC - ABOVE CEILING | RMAJUTA | Approved | |
| 03/06/2007 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/07/2007 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* 1. RE-READ NOTE FROM 2/15/07 AND COMPLY 2. CLOSET FLANGE SHALL EXTEND 1/4" ABOVE FINISHED FLOOR |
| 03/15/2007 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/15/2007 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/15/2007 | NPPO - FINAL | ACONNOR | Approved | |
| 03/16/2007 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES. LEAVE OUT UNDER FAN COIL. PROVIDE 15 AMP BREAKER FOR FAN COIL DUCT INSULATION OK |
| 04/04/2007 | MECHANICAL - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 04/04/2007 | FIRE - FINAL | LTHOMAS | Approved | |
| 04/05/2007 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL (NOTE: CURB DEPRESSION FOR DRAINAGE OKAY PER STEVE TINEO) |
| 04/06/2007 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* 1) BLDG INSPECTOR TO LOOK AT SINK CONNECTION ON FINAL |
| 04/06/2007 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* |
| 04/06/2007 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* |
| 04/09/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 04/13/2007 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 04/23/2007 | ENGINEERING - FINAL | MRUSSO | Approved | |
| 04/23/2007 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 04/25/2007 | PERMIT FINALED | BFLORES | Approved | |
| 04/25/2007 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | |
| 04/25/2007 | ELECTRIC - UFER | DSANTACR | Approved | |
| 05/10/2007 | ELECTRIC - FINAL | DSANTACR | Approved | PER INSPECTION COPY |