Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T05CM05118
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/23/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/25/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 11/28/2005 | GERRY KOZIOL | WWM | REVIEW | Denied | 1:need to build public sewer. 2:needs wastewater IWC review-Tom Tomchak 579-5771 3:needs wastewater credit evaluation if applicable. Was exsisting facility connected to septic? |
| 11/30/2005 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The site plan must be approved before the building plans will be approved. The building plans must be consistent with the approved Site Plan. |
| 12/01/2005 | DAVID BELL | LANDFILL | REVIEW | Approved | |
| 12/06/2005 | DAN CASTRO | ZONING | REVIEW | Denied | Building plans may not be approved by the Zoning Review section prior to structural review approval and obtaining site plan approval. A copy of the stamped approved site plan shall be inserted into each building plan set. Please assure that building size, height, and location shown on the approved site plan match the building plans. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/13/2005 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 12/13/2005 | DELMA ROBEY | OUT TO CUSTOMER | Completed |