Permit Details

Status:
Expired
Type:
Development Package
Address:
5001 N ORACLE RD
Address NEW:
5001 N ORACLE RD
Apply Date:
09/18/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Fiesta Plaza.

Permit Reviews

Permit Number - DP19-0221
Permit Status: Expired
Permit Description: SITE/GRADING/SWPPP - Fiesta Plaza.
Start Date Submittal Complete Date Status  
02/04/2020 DEV PKG - RESUBMITTAL 03/20/2020 COMPLETED Review Details
03/22/2021 DEV PKG - RESUBMITTAL 04/26/2021 COMPLETED Review Details
06/10/2022 DEV PKG - OK TO SUBMIT 07/13/2022 COMPLETED Review Details
07/13/2022 REVISION - - 1ST 07/14/2022 COMPLETED Review Details
08/21/2019 DEV PKG - OK TO SUBMIT 09/23/2019 COMPLETED Review Details
09/23/2019 DEV PKG 10/25/2019 COMPLETED Review Details
01/23/2023 DEVELOPMENT PACKAGE REVIEW v.1 02/02/2023 REQUIRES RESUBMIT Review Details
03/08/2023 DEVELOPMENT PACKAGE REVIEW v.2 03/08/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Expired
Permit Number: DP19-0221
Permite Description: SITE/GRADING/SWPPP - Fiesta Plaza.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
11/17/2022 SITE - Stormwater Follow-up N/A Deferred Stormwater follow up inspection. Continued. Large debris pile remains at south western portion of site in proximity to Pima wash.
11/17/2022 SITE - Stormwater Setup and Controls N/A Deferred 09152. Stormwater controls. Continued. Large material and debris piles remain at southwestern portion of the site close to Pima wash. Controls shall be kept in place as needed until debris piles have been removed. Reschedule inspection, after all work has been completed and coordinate with stormwater follow up and Stormwater final inspections after all controls have been removed and the SWPPP has been terminated.
12/19/2022 ENGR Engineering Final N/A Complete (Recurring) STOCKPILES REMAIN ON SITE, HANDRAIL AROUND THE BASIN IS STILL NOT CONSTRUCTED, THE RIP RAP IN THE BASIN AREA IS ONLY LAYER THICK AND THE FILTER FEBRIC IS VISIBLE, USUALLY THERE ARE TWO LAYERS OF ROCK RIP RAP. PROVIDE A DETAIL FROM THE ENGINEER OF RECIRD FOR THE RIP RAP THROUGHOUT THE SITE AS NEEDED, COMPLETE ALL REMAINING WORK FOR THIS SITE INCLUDING REMOVAL OF EXCESS MATERIAL STILL ON SITE, AND APPROVED REVISED STAMPED DRAWINGS FOR ALL CHANGES TO THIS SITE BY THE ENGINEER OF RECORD PRIOR TO REQUESTING ANY ADDITIONAL INSPECTIONS FOR THIS DEVELOPMENT PACKAGE.
12/16/2022 ENGR Grading Final N/A Not Ready

Completed Inspections

Permit Status: Expired
Permit Number: DP19-0221
Permit Description: SITE/GRADING/SWPPP - Fiesta Plaza.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/15/2022 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/15/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/03/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Conversation with Chris from blue lion Destruction. Please schedule Grading inspections.
5001 N Oracle Rd,
} ; {Activity date: 02/01/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - Partially approved. Unscheduled courtesy preconstruction meeting with Tyler from clear contracting and Kris with blue lion builders at 400 6949 . Post SWPPP,NOI at front gate and schedule Stormwater inspection from your development package permit. Schedule grading rebar and intermediate inspections for trash enclosure and site work. Trash enclosure requires rebar at 32 inches on center.} ; {Activity date: 01/27/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Unscheduled inspection. Requesting that Tyler with clear contracting at246-7491 provide a copy of and post NOI

} ; {Activity date: 12/09/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Unscheduled courtesy preconstruction meeting with Kris the general contractor and Tyler and Grading contractor. Contractor will start scheduling five from the development package permit.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Unscheduled courtesy preconstruction meeting. Cody with Wyco, 8018227322. New site superintendent.
Tyler w/ clear contracting 520 246 7491 grading contractor.
Please schedule a preconstruction meeting. Please provide SWPPP as required. Provide stormwater protections as needed. Ensure that no offsite discharge enters public drainage channel along the west end of the site. Note, minor erosion apparent in a few places at existing bank section.
Schedule Grading inspections for all Stormwater piping, catch basins and trashing closure. Schedule biweekly Stormwater follow up inspections.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Unscheduled courtesy preconstruction meeting. Cody with Wyco, 8018227322. New site superintendent.
Tyler w/ clear contracting 520 246 7491 grading contractor.
Please schedule a preconstruction meeting. Please provide SWPPP as required. Provide stormwater protections as needed. Ensure that no offsite discharge enters public drainage channel along the west end of the site. Note, minor erosion apparent in a few places at existing bank section.
Schedule Grading inspections for all Stormwater piping, catch basins and trashing closure. Schedule biweekly Stormwater follow up inspections.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. 5055 N ORACLE RD
Unscheduled courtesy preconstruction meeting. Cody with Wyco, 8018227322. New site superintendent.
Tyler w/ clear contracting 520 246 7491 grading contractor.
Please schedule a preconstruction meeting. Please provide SWPPP as required. Provide stormwater protections as needed. Ensure that no offsite discharge enters public drainage channel along the west end of the site. Note, minor erosion apparent in a few places at existing bank section.
Schedule Grading inspections for all Stormwater piping, catch basins and trashing closure. Schedule biweekly Stormwater follow up inspections.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. 5061 N ORACLE RD
Unscheduled courtesy preconstruction meeting. Cody with Wyco, 8018227322. New site superintendent.
Tyler w/ clear contracting 520 246 7491 grading contractor.
Please schedule a preconstruction meeting. Please provide SWPPP as required. Provide stormwater protections as needed. Ensure that no offsite discharge enters public drainage channel along the west end of the site. Note, minor erosion apparent in a few places at existing bank section.
Schedule Grading inspections for all Stormwater piping, catch basins and trashing closure. Schedule biweekly Stormwater follow up inspections.
}
04/11/2023 ENGR Engineering Final Passed THE FOLLOWING ITEMS WILL BE NOTED ON THIS PERMIT EVEN THOUGH IT IS BEING APPROVED AT THIS TIME:
1) THE DIMENSIONS OF THE ROCK RIP RAP ON THE SIDE SLOPES OF THE BASIN HAVE BEEN CALLED INTO QUESTION SINCE THERE WAS NOT A DETAIL FOR THIS ITEM. IT HAD BEEN REQUESTED TO HAVE THE ENGINEER OF RECORD PROVIDE US WITH A DETAIL OF THIS ITEM FOR INSPECTION, NOTHING HAS BEEN PROVIDED.
2) THE BASIN HAS BEEN NOTED DURING THE PAST YEAR THAT IT APPEARS TO HOLD STANDING WATER PAST THE MAXIMUM DRAIN DOWN TIME OF 12 HOURS. THIS SITE WILL BE APPROVED AT THIS TIME EVEN THOUGH THERE IS A QUESTION ABOUT THIS INFORMATION. THE CONTRACTOR AND THE OWNER OF THIS SITE ARE BEING PLACED ON NOTICE AT THIS TIME, FUTURE VIOLATIONS OF THIS DRAIN DOWN TIME WILL BE NOTED AND WILL NEED TO BE ADDRESSED BY THE OWNER AND THE CONTRACTOR FOR THIS SITE AT THAT TIME.
04/11/2023 ENGR Grading Final Passed THE FOLLOWING ITEMS WILL BE NOTED ON THIS PERMIT EVEN THOUGH IT IS BEING APPROVED AT THIS TIME:
1) THE DIMENSIONS OF THE ROCK RIP RAP ON THE SIDE SLOPES OF THE BASIN HAVE BEEN CALLED INTO QUESTION SINCE THERE WAS NOT A DETAIL FOR THIS ITEM. IT HAD BEEN REQUESTED TO HAVE THE ENGINEER OF RECORD PROVIDE US WITH A DETAIL OF THIS ITEM FOR INSPECTION, NOTHING HAS BEEN PROVIDED.
2) THE BASIN HAS BEEN NOTED DURING THE PAST YEAR THAT IT APPEARS TO HOLD STANDING WATER PAST THE MAXIMUM DRAIN DOWN TIME OF 12 HOURS. THIS SITE WILL BE APPROVED AT THIS TIME EVEN THOUGH THERE IS A QUESTION ABOUT THIS INFORMATION. THE CONTRACTOR AND THE OWNER OF THIS SITE ARE BEING PLACED ON NOTICE AT THIS TIME, FUTURE VIOLATIONS OF THIS DRAIN DOWN TIME WILL BE NOTED AND WILL NEED TO BE ADDRESSED BY THE OWNER AND THE CONTRACTOR FOR THIS SITE AT THAT TIME.

Scheduled Inspections

Scheduled Inspections - DP19-0221
Status: Expired
Description: SITE/GRADING/SWPPP - Fiesta Plaza.
Scheduled Date Description Entered By Entered Date
12/16/2022 ENGR Grading Final Scheduled
ENGR Grading Final Scheduled
12/16/2022 ENGR Grading Final Scheduled
12/16/2022 SITE - Stormwater Setup and Controls Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 06.08.22.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
FLOODPLAIN USE PERMIT T20OT00210.PDF DOCUMENTS VIEW
ADOT APPROVAL LETTER, 04.22.21.PDF DOCUMENTS VIEW
2ND SUBMITTAL COMMENT RESPONSE, 03.22.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 03.20.21.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
RESPONSE TO ADOT COMMENTS.PDF DOCUMENTS VIEW
TIA, TRAFFIC IMPACT STUDY.PDF DOCUMENTS VIEW
FACILITY IMPACT FORM, PIMA COUNTY FLOOD CONTROL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
EMAIL REGARDING CITY AGRMNTS, JAN. 2019.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
PIMACO ADDRESSING REVIEW, 10.18.19.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 02.05.2020.PDF DOCUMENTS VIEW
ERR, ENVIRONMENTAL RESOURCE REPORT.PDF DOCUMENTS VIEW
GEOTECHNICAL ADDENDUM 1.PDF DOCUMENTS VIEW
LANDSCAPE RESPONSE LETTER.PDF DOCUMENTS VIEW
MAINTENANCE AGREEMENT, DRAINAGE EASEMENT.PDF DOCUMENTS VIEW
ADOT REVIEW, FIESTA PLAZA_03.05.2020.PDF DOCUMENTS VIEW