| 10/06/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - continued. Stormwater protections at South West portion of the site require correction.
5001 N ORACLE RD |
| 10/06/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - continued. Stormwater protections at South West portion of the site require correction.
5075 N ORACLE RD |
| 10/06/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - continued. Stormwater protections at South West portion of the site require correction.
5061 N ORACLE RD |
| 10/06/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - continued. Stormwater protections at South West portion of the site require correction.
5055 N ORACLE RD |
| 07/20/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Correction Required |
Entered by VVERA1 - Correction required. Provide concrete containment.
|
| 07/20/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Correction Required |
Entered by VVERA1 - Correction required. Provide concrete containment.
|
| 06/17/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Additional controls installed at Southern portion of site.
5075 N ORACLE RD |
| 06/17/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Additional controls installed at Southern portion of site.
5061 N ORACLE RD |
| 06/17/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Chris with blue lion construction, asked to move and or ensure adequate containment of material piles in close proximity to The Pima wash.
5055 N ORACLE RD |
| 06/17/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Chris with blue lion construction, asked to move and or ensure adequate containment of material piles in close proximity to The Pima wash.
5001 N ORACLE RD
|
| 04/07/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Concerned about large material piles at Southwest corner near Pima wash. Please provide protection as needed
5075 N ORACLE RD |
| 03/11/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved.NOI. Received from Chris with blue lion construction.
5001 N Oracle Rd |
| 03/11/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready.NOI has not been posted. Chris will send NOI via text.
Temporary perimeter fencing remains in place |
| 12/22/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - Continue. No track out protection at Southern entrance onto river road. |
| 12/09/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved . controls installed along west property line next to existing county wash. A head of forecasted rain event |
| 09/28/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by VVERA1 - Partially approved. Waddle installed along west perimeter fencing.
And track out protection at Northeast entrance |
| 10/28/2022 |
SITE - Stormwater Setup and Controls |
|
Re-inspection required |
|
| 10/28/2022 |
SITE - Stormwater Setup and Controls |
|
Re-inspection required |
|
| 11/17/2022 |
SITE - Stormwater Setup and Controls |
|
Deferred |
09152. Stormwater controls. Continued. Large material and debris piles remain at southwestern portion of the site close to Pima wash. Controls shall be kept in place as needed until debris piles have been removed. Reschedule inspection, after all work has been completed and coordinate with stormwater follow up and Stormwater final inspections after all controls have been removed and the SWPPP has been terminated. |