Permit Number: DP19-0221
Parcel: 10503032B

Address:
5001 N ORACLE RD

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP19-0221
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/04/2020 SBEASLE1 START PLANS SUBMITTED Completed
02/26/2020 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: FIESTA PLAZA
Development Package (2nd Review) 5001 N ORACLE RD
DP19-0221 - C-3 Zoning

TRANSMITTAL DATE: February 26, 2020
DUE DATE: March 5, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 18, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

***Address the Follow up comment and resubmit for review.

1. Follow up to previous comment 10: Clarify if the long term bicycle facilities will be the bike enclosure boxes depicted in Detail E on sheet 10? If this is not correct include a detail of the proposed long term facilities to be provided within the buildings as noted in the Calculations note 5.

2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

Previous Comment 10: 2-06.4.9.H.5.d - Provide the location and the calculations for short and long term bicycle parking for the existing building.

2. COMMENT: The remaining comment is minor and zoning is willing to do an over the counter review once the digital copy of the corrected plans is uploaded. (Send an email request for an over the counter digital review of the corrected plans.)


***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact David Rivera at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
02/27/2020 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP19-0221 / 2nd Subm. for review / Fiesta Plaza is Approved by Pima County Addressing based on the assumption that S20-009 will be Approved and deeds and/or the plat recorded appropriately to execute the correct configuration of the Lot Lines as shown in the Development Package.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor Tucson, AZ 85701
(520) 724-7570
03/05/2020 ANDREW CONNOR LANDSCAPE REVIEW Approved
03/05/2020 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Reqs Change (The "attached correspondence" mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the "Documents" section.)

Attached you will find correspondence as it relates to the DP19-0221 for Fiesta Plaza for the NW corner of SR 77 (Oracle Road) and River Road.

The TIS will need to be revised and resubmitted according to the correspondence for comments and clarifications to be addressed.

The TIS outlines off-Site improvement needs to ADOT facilities.

This development will need to continue to coordinate closely with ADOT (and has already begun) due to an upcoming project in the same area.

Should you have any questions or concerns regarding this matter, please feel free to contact me directly.
Thank you,
Respectfully,
James Gomes, Jr., Southern Regional Traffic Engineer
1221 S. 2nd Ave.
Tucson, Az 85713
(520)388-4231 Office, (520)603-9826 Cell, www.azdot.gov
03/09/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
03/10/2020 MARTIN BROWN FIRE REVIEW Approved
03/18/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change The City of Tucson Engineering Comments have been addressed.

Pima County RFCD response:

1) The Pima Wash parcel is privately owned. Please correct the (Public) label on Sheet 2. The Public Drainage Easement is recorded at Docket 06793 Page 01133. Please note the easement information and show the easement limits.

Addressed.


2) The Zone AE is also a designated FEMA Floodway. Please note this on the plan. Provide documentation that there are no impacts to the Floodway.

Addressed.


3) Provide a detail for the splash pads designated by Keynote 15. Show clearly how the pads will direct flow over the gabions and prevent infiltration behind the gabions.

The design has changed from splash pads to a basin with pipe outlets. The District does not approve PVC outlets. Provide concrete collar where the pipes connect to the gabions or replace pipes with concrete pipes. Provide a detail for the pipe outlets at the gabions. Existing outlets south of River Road have a concrete surround, and there is a detail in the road plan set provided with the drainage report. An existing outlet north of River Road has a flapgate. Infrastructure Management reports that flapgates and trash racks on the southern outlets were removed by vandals. Provide a workable design with a detail that provides construction information for the removal and repair of the gabions during construction as appropriate. Review the outlet velocities of the pipes and evaluate energy dissipation as flows travel across the gabions to the bottom of the wash. Provide evidence that scour at the wash will be avoided. Infrastructure management does not want a splash pad in the wash. The Director’s office wants some assurance that scour will not be an ongoing maintenance problem.



Prior to constructing the basin outlet, a Facility Impact Permit is required to set inspection notifications for the District.



The 100-year water surface elevation in Pima Wash is higher than the 12” pipe inverts and approximately the same as the 24” pipe inverts. Discuss how this affects the basin function during a large storm event.



The max WSEL of the basin is higher than the edge of pavement west of the trash enclosure. Review and correct if necessary



4) Contact Tim Murphy, Pima County Real Property, to provide an agreement that Pima County will have no maintenance responsibility for private improvements within the public drainage easement.

The Director’s office is holding on signing the agreement until the outlet design is approved by the District.


5) Provide a planting detail for planting adjacent to the gabions, with construction notes for shoring or other protective measures.

Addressed.


6) Provide a statement from the geotechnical engineer that irrigation and stormwater harvesting will not have an adverse impact on soils adjacent to the gabions.

Addressed.
03/20/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: Resubmittal with a Comment Response Letter

DESCRIPTION: SITE/GRADING/SWPPP - Fiesta Plaza.
PERMIT: DP19-0221
PROJECT MANAGER: Andrew.Connor@tucsonaz.gov or 837-4950
FEE BALANCE: $0 (zero)

SEE REVIEWER'S COMMENTS and your submitted documentson PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Reviews section, click on Review Details
- Documents section, click on blue icon to the right of each document

YOUR NEXT STEPS: Submit the following items to the Filedrop- https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff

- Name your 3rd submittal documents to start with the submittal number, for example: 3_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter
201 N. Stone Avenue, 2nd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
03/20/2020 SBEASLE1 OUT TO CUSTOMER Completed