Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/06/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - not ready, complete work shown on City approved drawings for this permit. Complete all previously noted corrections. 5001 N ORACLE RD |
| 10/06/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - not ready 5075 N ORACLE RD |
| 10/06/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - not ready 5061 N ORACLE RD |
| 10/06/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - not ready 5055 N ORACLE RD |
| 09/28/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Complete all work and corrections required as previously noted. Complete all work in accordance with plan specifications. On-site meeting with Chris from blue lion construction. Chris was reminded of safety hazard at the barrier rail along the Pima Wash at The connection to basin number seven. Accessible handrail required for the ramp along the south portion of the building, has not yet been installed, trash enclosures have not been completed and the bollard installations do not comply with DOT specifications. Landscaped areas have not been completed. Recess all landscaped areas to a point of 6 to9 inches below the curb inlet. Letter of acceptance for connection to Pima wash at basin number seven, from engineer of record has not been received at this time. Large material and debris piles remain on site with close proximity to Pima Wash. correct excessive standing water in parking spaces as needed. |
| 09/28/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Complete all work and corrections required as previously noted. Complete all work in accordance with plan specifications. On-site meeting with Chris from blue lion construction. Chris was reminded of safety hazard at the barrier rail along the Pima Wash at The connection to basin number seven. Accessible handrail required for the ramp along the south portion of the building, has not yet been installed, trash enclosures have not been completed and the bollard installations do not comply with DOT specifications. Landscaped areas have not been completed. Recess all landscaped areas to a point of 6 to9 inches below the curb inlet. Letter of acceptance for connection to Pima wash at basin number seven, from engineer of record has not been received at this time. Large material and debris piles remain on site with close proximity to Pima Wash. correct excessive standing water in parking spaces as needed. |
| 09/28/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - Not ready. Complete all work and corrections required as previously noted. Complete all work in accordance with plan specifications. On-site meeting with Chris from blue lion construction. Chris was reminded of safety hazard at the barrier rail along the Pima Wash at The connection to basin number seven. Accessible handrail required for the ramp along the south portion of the building, has not yet been installed, trash enclosures have not been completed and the bollard installations do not comply with DOT specifications. Landscaped areas have not been completed. Recess all landscaped areas to a point of 6 to9 inches below the curb inlet. Letter of acceptance for connection to Pima wash at basin number seven, from engineer of record has not been received at this time. Large material and debris piles remain on site with close proximity to Pima Wash. 5055 N ORACLE RD |
| 07/20/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Accessible parking spaces require correction. Excessive slope. Ramp requires handrail on both sides with a maximum height of 38 inches. Chris blue lion construction |
| 10/19/2022 | ENGR Engineering Final | Not Ready | {Activity date: 10/19/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Basin number seven is still holding water after last weeks Rain event. Engineering is required to fix 5055 N ORACLE RD} ; {Activity date: 10/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Basin number seven has standing water.} ; {Activity date: 10/07/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. Final grade at landscaped parking island. 5075 N ORACLE RD } ; {Activity date: 10/07/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved 5055 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready, complete work shown on City approved drawings for this permit. Complete all previously noted corrections. 5001 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready 5075 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready 5061 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready 5055 N ORACLE RD} ; {Activity date: 09/28/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Complete all work and corrections required as previously noted. Complete all work in accordance with plan specifications. On-site meeting with Chris from blue lion construction. Chris was reminded of safety hazard at the barrier rail along the Pima Wash at The connection to basin number seven. Accessible handrail required for the ramp along the south portion of the building, has not yet been installed, trash enclosures have not been completed and the bollard installations do not comply with DOT specifications. Landscaped areas have not been completed. Recess all landscaped areas to a point of 6 to9 inches below the curb inlet. Letter of acceptance for connection to Pima wash at basin number seven, from engineer of record has not been received at this time. Large material and debris piles remain on site with close proximity to Pima Wash. correct excessive standing water in parking spaces as needed. } ; {Activity date: 09/28/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Complete all work and corrections required as previously noted. Complete all work in accordance with plan specifications. On-site meeting with Chris from blue lion construction. Chris was reminded of safety hazard at the barrier rail along the Pima Wash at The connection to basin number seven. Accessible handrail required for the ramp along the south portion of the building, has not yet been installed, trash enclosures have not been completed and the bollard installations do not comply with DOT specifications. Landscaped areas have not been completed. Recess all landscaped areas to a point of 6 to9 inches below the curb inlet. Letter of acceptance for connection to Pima wash at basin number seven, from engineer of record has not been received at this time. Large material and debris piles remain on site with close proximity to Pima Wash. correct excessive standing water in parking spaces as needed. } ; {Activity date: 09/28/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Complete all work and corrections required as previously noted. Complete all work in accordance with plan specifications. On-site meeting with Chris from blue lion construction. Chris was reminded of safety hazard at the barrier rail along the Pima Wash at The connection to basin number seven. Accessible handrail required for the ramp along the south portion of the building, has not yet been installed, trash enclosures have not been completed and the bollard installations do not comply with DOT specifications. Landscaped areas have not been completed. Recess all landscaped areas to a point of 6 to9 inches below the curb inlet. Letter of acceptance for connection to Pima wash at basin number seven, from engineer of record has not been received at this time. Large material and debris piles remain on site with close proximity to Pima Wash. 5055 N ORACLE RD} ; {Activity date: 09/28/2022; Status: Continued; Inspector: BBENEDOON; Comment: Entered by VVERA1 - Continued. Contractor requesting on-site meeting for 1 PM. } ; {Activity date: 08/12/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Basin number seven has standing water 24 hours after last rain event. 5061 N ORACLE RD} ; {Activity date: 08/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - 5001 N ORACLE RD} ; {Activity date: 06/14/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. On site meeting to discuss ramp and handrail requirements. Follow plan or provide documentation to support changes. 5001 N ORACLE RD } ; {Activity date: 06/14/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. On site meeting to discuss ramp and handrail requirements. Follow plan or provide documentation to support changes. 5055 N ORACLE RD} ; {Activity date: 06/14/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. On site meeting to discuss ramp and handrail requirements. Follow plan or provide documentation to support changes. 5061 N ORACLE RD } ; {Activity date: 06/14/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Chris requesting 1 PM on site meeting for access ramp. 5075 N ORACLE RD} ; {Activity date: 06/09/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Dave and I met on site with Chris and Juan from blue lion construction regarding plan requirements for final approval and temporary certificate of occupancy. 5061 N ORACLE RD } ; {Activity date: 05/12/2022; Status: Denied; Inspector: BBENEDON; Comment: Entered by VVERA1 - Denied. Newly landscaped parking islands have not been recessed as shown. Basin has been overfilled with oversized rocks compromising capacity of basin. Install as shown per approved plans.} ; {Activity date: 04/29/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - not ready} ; {Activity date: 04/29/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Courtesy meeting on site requested by Steve property owner. Present project manager from blew lion and owl superintendent for landscaping company also grading contractor. Basin depth is measured from curb inlet low point to bottom of finished basin. Landscaped islands also require 6 inch depression per plan notes. Pedestrian access to be installed per plan. Trash enclosure size still to be determined. Shall be installed for DOT 6.01} ; {Activity date: 04/29/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Courtesy meeting on site requested by Steve property owner. Present project manager from blew lion and owl superintendent for landscaping company also grading contractor. Basin depth is measured from curb inlet low point to bottom of finished basin. Landscaped islands also require 6 inch depression per plan notes. Pedestrian access to be installed per plan. Trash enclosure size still to be determined. Shall be installed for DOT 6.01&# |
|
| 04/11/2023 | ENGR Engineering Final | Passed | THE FOLLOWING ITEMS WILL BE NOTED ON THIS PERMIT EVEN THOUGH IT IS BEING APPROVED AT THIS TIME: 1) THE DIMENSIONS OF THE ROCK RIP RAP ON THE SIDE SLOPES OF THE BASIN HAVE BEEN CALLED INTO QUESTION SINCE THERE WAS NOT A DETAIL FOR THIS ITEM. IT HAD BEEN REQUESTED TO HAVE THE ENGINEER OF RECORD PROVIDE US WITH A DETAIL OF THIS ITEM FOR INSPECTION, NOTHING HAS BEEN PROVIDED. 2) THE BASIN HAS BEEN NOTED DURING THE PAST YEAR THAT IT APPEARS TO HOLD STANDING WATER PAST THE MAXIMUM DRAIN DOWN TIME OF 12 HOURS. THIS SITE WILL BE APPROVED AT THIS TIME EVEN THOUGH THERE IS A QUESTION ABOUT THIS INFORMATION. THE CONTRACTOR AND THE OWNER OF THIS SITE ARE BEING PLACED ON NOTICE AT THIS TIME, FUTURE VIOLATIONS OF THIS DRAIN DOWN TIME WILL BE NOTED AND WILL NEED TO BE ADDRESSED BY THE OWNER AND THE CONTRACTOR FOR THIS SITE AT THAT TIME. |
|
| 11/16/2022 | ENGR Engineering Final | Deferred | Engineering final, not ready. Corrections to handrail are in progress. Material piles remain on site. Complete all remaining issues for final approval | |
| 12/19/2022 | ENGR Engineering Final | Complete (Recurring) | STOCKPILES REMAIN ON SITE, HANDRAIL AROUND THE BASIN IS STILL NOT CONSTRUCTED, THE RIP RAP IN THE BASIN AREA IS ONLY LAYER THICK AND THE FILTER FEBRIC IS VISIBLE, USUALLY THERE ARE TWO LAYERS OF ROCK RIP RAP. PROVIDE A DETAIL FROM THE ENGINEER OF RECIRD FOR THE RIP RAP THROUGHOUT THE SITE AS NEEDED, COMPLETE ALL REMAINING WORK FOR THIS SITE INCLUDING REMOVAL OF EXCESS MATERIAL STILL ON SITE, AND APPROVED REVISED STAMPED DRAWINGS FOR ALL CHANGES TO THIS SITE BY THE ENGINEER OF RECORD PRIOR TO REQUESTING ANY ADDITIONAL INSPECTIONS FOR THIS DEVELOPMENT PACKAGE. |