ENGR Grading Final |
|
Scheduled |
{Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready, complete work shown on City approved drawings for this permit. Complete all previously noted corrections.
5001 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready
5075 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready
5061 N ORACLE RD} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready
5055 N ORACLE RD} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready. Complete installation of rebar bond beam and provide clean outs for 6’ grout. Bollards are required to be 4 feet tall.
5075 N ORACLE RD} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - not ready. Complete installation of rebar bond beam and provide clean outs for 6’ grout. Bollards are required to be 4 feet tall.
5061 N ORACLE RD
} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Kris with blue lion construction anticipates contractor will have trash enclosure pre-grout ready for inspection by 1 PM
5055 N ORACLE RD} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready at this time.
5001 N ORACLE RD} ; {Activity date: 09/08/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. Pre-grout trash enclosure South
5055 N ORACLE RD
} ; {Activity date: 09/08/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. Pre-grout trash enclosure South
5001 N ORACLE RD
} ; {Activity date: 09/08/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partially approved. Pre-grout trash enclosure South
5075 N ORACLE RD} ; {Activity date: 09/08/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - . Not ready at this time.
5061 N ORACLE RD} ; {Activity date: 08/31/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VVERA1 - Not ready. Install minimum size riprap at splash pad in basin has specified. Conversation with installer} ; {Activity date: 08/12/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Standing water in basin number seven.
5001 N ORACLE RD} ; {Activity date: 08/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued
5055 N ORACLE RD} ; {Activity date: 08/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Discussed issues with Chris from blue line construction about main basin. Standing water present. Mud and erosion. Ensure that water recedes from basin as required or consult with engineer of record prior to final installation. Install rip rap as shown on approved plans. Materials not on site at this time.
5001 N ORACLE RD} ; {Activity date: 08/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. On-site meeting with Chris from blue line construction, first left of first trash enclosure OK. Remove excess of mud prior to Bollard installation. Seven’ by 4 inch bollards not yet on site.
5075 N ORACLE RD} ; {Activity date: 08/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - continued. Chris requesting 1 PM inspection for trash enclosure and main base and Grading.
5061 N ORACLE RD
} ; {Activity date: 07/08/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 5061 Partially approved. Grading} ; {Activity date: 07/08/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 5001 Partially approved. Grading} ; {Activity date: 07/08/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 5075 Partially approved. Grading} ; {Activity date: 07/08/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved grading, Landscaped areas
5055 N ORACLE RD} ; {Activity date: 07/01/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - partially approved. Progress at landscape areas and basins.} ; {Activity date: 07/01/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - partially approved. Progress at landscape areas and basins.
} ; {Activity date: 06/28/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue. Courtesy on schedule inspection First layer riprap via photo inspection. Contractor requested to schedule inspections
5001 N Oracle Rd} ; {Activity date: 06/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Asphalt pavement installation in progress.
5001 N Oracle Rd} ; {Activity date: 05/27/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Un scheduled Inspection. Asphalt paving east parking lot in progress. Grading activities throughout the site
} ; {Activity date: 05/25/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - continued. Courtesy unscheduled inspection. Curbs at southern entrance. Grade/Depress 6 to 9 inches and install rip rap as shown per notes 5 and 15.} ; {Activity date: 05/12/2022; Status: Denied; Inspector: BBENEDON; Comment: Entered by VVERA1 - Denied. Newly landscaped parking islands have not been recessed as shown. Basin has been overfilled with oversized rocks compromising capacity of basin. Install as shown per approved plans.} ; {Activity date: 05/12/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 05/12/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 05/12/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Chris with blue lion construction. Curb installation at southern entrance} ; {Activity date: 05/06/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Grading and material moving and sorting. Debris piles.
5001 N Oracle Rd
} ; {Activity date: 05/03/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Material and debris piles have been moved to the south west portion of the Southwest portion of the site. On-going grading activity
5001 N Oracle Rd,
} ; {Activity date: 04/26/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 04/21/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. Restriping of existing
} ; {Activity date: 04/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Water utility work in progress. New material stock piles on site.
} ; {Activity date: 04/13/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued
5055 N ORACLE RD} ; {Activity date: 04/13/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved . Final grading of parking lot in front of building, Ready for asphalt
5001 N ORACLE RD} ; {Activity date: 04/13/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 04/13/2022; Status: Continued; Inspector: BBENEDO |