Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Final Inspection |
|
Not Ready |
|
| 10/06/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready, complete work shown on City approved drawings for this permit. Complete all previously noted corrections.
5001 N ORACLE RD |
| 10/06/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready
5075 N ORACLE RD |
| 10/06/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready
5061 N ORACLE RD |
| 10/06/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready
5055 N ORACLE RD |
| 09/28/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - Not ready. Site is not ready for final approval at this time. Provide notice of termination of SWPPP permit, only after work specified and development package plan has been completed. Chris with blue lion construction was reminded that the barrier railing along the Pima Canyon wash, at the connection job site basin, presents a safety hazard and needs to be corrected. Large material and debris piles remain on site close proximity to water way. |
| 09/28/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - Not ready. Site is not ready for final approval at this time. Provide notice of termination of SWPPP permit, only after work specified and development package plan has been completed. Chris with blue lion construction was reminded that the barrier railing along the Pima Canyon wash, at the connection job site basin, presents a safety hazard and needs to be corrected. Large material and debris piles remain on site close proximity to water way. |
| 09/28/2022 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready. Site is not ready for final approval at this time. Provide notice of termination of SWPPP permit, only after work specified and development package plan has been completed. Chris with blue lion construction was reminded that the barrier railing along the Pima Canyon wash, at the connection job site basin, presents a safety hazard and needs to be corrected. Large material and debris piles remain on site close proximity to water way.
5055 N ORACLE RD
|
| 09/28/2022 |
SITE - Stormwater Final Inspection |
BBENEDOON |
Continued |
Entered by VVERA1 - Continued. Contractor requesting on-site meeting for 1 PM.
|
| 11/02/2022 |
SITE - Stormwater Final Inspection |
|
Passed |
|