Permit: DP19-0221

Parcel: 10503032C


Addresses:

5001 N ORACLE RD

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Final Inspection

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Final Inspection Not Ready
10/06/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by NGARCIA3 - not ready, complete work shown on City approved drawings for this permit. Complete all previously noted corrections. 5001 N ORACLE RD
10/06/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by NGARCIA3 - not ready 5075 N ORACLE RD
10/06/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by NGARCIA3 - not ready 5061 N ORACLE RD
10/06/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by NGARCIA3 - not ready 5055 N ORACLE RD
09/28/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by VVERA1 - Not ready. Site is not ready for final approval at this time. Provide notice of termination of SWPPP permit, only after work specified and development package plan has been completed. Chris with blue lion construction was reminded that the barrier railing along the Pima Canyon wash, at the connection job site basin, presents a safety hazard and needs to be corrected. Large material and debris piles remain on site close proximity to water way.
09/28/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by VVERA1 - Not ready. Site is not ready for final approval at this time. Provide notice of termination of SWPPP permit, only after work specified and development package plan has been completed. Chris with blue lion construction was reminded that the barrier railing along the Pima Canyon wash, at the connection job site basin, presents a safety hazard and needs to be corrected. Large material and debris piles remain on site close proximity to water way.
09/28/2022 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Site is not ready for final approval at this time. Provide notice of termination of SWPPP permit, only after work specified and development package plan has been completed. Chris with blue lion construction was reminded that the barrier railing along the Pima Canyon wash, at the connection job site basin, presents a safety hazard and needs to be corrected. Large material and debris piles remain on site close proximity to water way. 5055 N ORACLE RD
09/28/2022 SITE - Stormwater Final Inspection BBENEDOON Continued Entered by VVERA1 - Continued. Contractor requesting on-site meeting for 1 PM.
11/02/2022 SITE - Stormwater Final Inspection Passed