Permit: TC-COM-1222-00337
Permit Details
Apply Date:
12/20/2022
Applicant:
Ben Hager
Description:
New Multi-Family Structure HUB V
Permit Reviews
Permit Number - TC-COM-1222-00337
Permit Status: Issued
Permit Description: New Multi-Family Structure HUB V
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/03/2023 | COMMERCIAL REVIEW - FULL v.3 | 10/03/2023 | REQUIRES RESUBMIT |
11/29/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/04/2024 | APPROVED |
08/25/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/20/2023 | REQUIRES RESUBMIT |
05/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/10/2024 | APPROVED |
10/20/2023 | RESTAMP - COMMERCIAL v.1 | 10/24/2023 | APPROVED |
10/09/2023 | COMMERCIAL REVIEW - FULL v.4 | 10/17/2023 | REQUIRES RESUBMIT |
04/29/2024 | RESTAMP - COMMERCIAL v.1 | 04/30/2024 | APPROVED |
08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2024 | APPROVED |
12/27/2022 | COMMERCIAL REVIEW - FULL v.1 | 08/24/2023 | REQUIRES RESUBMIT |
01/04/2024 | RESTAMP - COMMERCIAL v.1 | 01/04/2024 | APPROVED |
04/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 04/29/2024 | APPROVED |
10/18/2023 | COMMERCIAL REVIEW - FULL v.5 | 10/20/2023 | APPROVED |
04/19/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/25/2024 | REQUIRES RESUBMIT |
05/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/28/2024 | REQUIRES RESUBMIT |
06/25/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/30/2024 | APPROVED |
01/09/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/28/2024 | REQUIRES RESUBMIT |
06/14/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/20/2024 | REQUIRES RESUBMIT |
05/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/14/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1222-00337
Permit Status: Issued
Permit Description: New Multi-Family Structure HUB V
Total Outstanding Activity Conditions - 21
Date | Name |
---|---|
06/13/2024 | AIR BALANCING REPORT IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/13/2024 | ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
06/13/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
06/13/2024 | Masonry Inspection Report submittal review is required. |
06/13/2024 | TWO-WAY COMMUNICATION SYSTEM Designs must be submitted and approved prior to FINAL. |
06/13/2024 | window designs must be submitted and approved prior to ... |
06/13/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/13/2024 | Post-Installed Anchor Inspection Report is required. |
06/13/2024 | Post-Tension Inspection Report is required. |
06/13/2024 | SPECIAL INSPECTION FOR SMOKE CONTROL SYSTEM IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR EFIS IS REQUIRED |
06/13/2024 | SPECIAL INSPECTION FOR FIRE-RESISTANT PENETRATIONS AND JOINTS (HIGH-RISES) IS REQUIRED |
06/13/2024 | SPECIAL INSPECTION FOR INTUMESCENT MATERIALS IS REQUIRED |
06/13/2024 | SPECIAL INSPECTION FOR SPRAY-APPLIED FIRE PROOFING IS REQUIRED. |
06/13/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
06/13/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1222-00337
Permit Status: Issued
Permit Description: New Multi-Family Structure HUB V
Date | Description | Comments |
---|---|---|
06/13/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
08/19/2024 | Elevator Designs must be submitted and approved prior to ... | |
06/13/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
06/10/2024 | Cold-formed metal framing Designs must be submitted and approved prior to ... | |
06/13/2024 | Glazed guardrail designs must be submitted and approved prior to .. | |
08/24/2023 | HANDRAILS Designs must be submitted and approved prior to FINAL. | |
06/13/2024 | REINFORCING SIZES AND LOCATIONS FORPOST-TENSION SLABS Designs must be submitted and approved prior to FINAL. | |
06/10/2024 | Temporary construction hoist designs must be submitted and approved prior to ... | |
06/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/13/2024 | Stair Designs must be submitted and approved prior to... |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1222-00337
Permite Description: New Multi-Family Structure HUB V
Total Outstanding Inspections - 15
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/02/2024 | COT - HCBU - Building Final | N/A | Not Ready | Please use BUILDING PROGRESS when calling in Post tension system inspections |
02/09/2024 | FCON – Fire – Intermediate | N/A | Partial Pass | Underground fire line pressure approved |
06/13/2024 | COT - HCEL - Outdoor Lighting | N/A | Partial Pass | Outdoor lighting for town houses #100 - 104. |
08/06/2024 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Level #3; room units 310 - 317. |
10/31/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | Level #9, Room units 902 - 909. |
11/18/2024 | COT - HCEL - Electrical Final | N/A | Not Ready | |
12/06/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Level #10.5, room units 1131 - 1134. Ok to insulate and cover walls. |
02/07/2024 | COT - HCBU - Masonry Pregrout | N/A | Not Ready | Contractor cancelled, will reschedule for 8 February. |
COT - HCEL - Electrical Above Ceiling | N/A | Scheduled | ||
COT - HCBU - Exterior Clips/Sheathing | N/A | Scheduled | ||
10/31/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Level #9, Room units 902 - 909. |
12/06/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Level #10.5. room units 1131 - 1134. Ok to insulate and cover walls. |
12/10/2024 | BULD - Electrical Clearance | N/A | Partial Pass | No electric clearance required; this inspection is for an electric intermediate inspection of electric room #1M25A: Electric panel #1P and panel #1DP with transformer #T-1. Electric room #1M23; panel #1M. Ok to energize panels and transformer. |
10/30/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Bonding grip for pool and spa in place. Rebar for spa and pool in place. Ok to gunite progress areas. |
02/20/2024 | COT - HCBU - Framing | N/A | Partial Pass | Level #5, placement #2 columns at GL; G.8/1.1, 2/G.8, I/1.4, J/2, K/2, K/1.2,H/3, H/4, H/5, H/6, H/7, J/7, J/6, J/5. OK to set forms and place concrete in progress areas. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1222-00337
Permit Description: New Multi-Family Structure HUB V
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/06/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
12/06/2024 | COT - HCBU - Roof Nailing | Passed | ||
12/06/2024 | COT - HCPL - Plumbing Roof Drains | Passed | ||
12/06/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
12/06/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
12/06/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
12/13/2024 | COT - HCPL - Gas Pressure Test | Passed | Gas connections for pool/spa and BBQ | |
12/19/2024 | COT - HCEL - Grounding/Bonding | Passed | Lightening grounding system for structure; bonded in place. |
Scheduled Inspections
Scheduled Inspections - TC-COM-1222-00337
Status: Issued
Description: New Multi-Family Structure HUB V
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
12/06/2024 | COT - HCBU - Exterior Clips/Sheathing | Scheduled | |
12/06/2024 | COT - HCEL - Electrical Above Ceiling | Scheduled |