Permit: TC-COM-1222-00337

Parcel: 11504495A


Addresses:

1001 N PARK AV

Inspection Status: Passed

Inspection History: COT - HCPL - Plumbing Intermediate 

Date Description Inspector Results Comments
05/09/2025 COT - HCPL - Plumbing Intermediate  Passed
05/13/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Eight inch sewer lines (2 each), from East side of building to main sewer line in Park Avenue.
06/17/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Room units 100 - 104, 217, 317.
06/25/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic water lines (copper) in amenities areas at levels 1 and 1.5; town home areas 101 - 104.
07/01/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #2; Room units 202 - 209
07/02/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #2, units 201, 210 - 212, 214 - 216. Ok to insulate and cover walls.
07/22/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #3, domestic water lines pressure tested at 80 psi - 100 psi throughout this level.
NOTE: Will not be able to go forward with inspections with water on floors throughout level.
07/23/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #5, plumbing waste lines in units #502 - 508
07/25/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #5, units (DWV) at 507, 510, 511.
08/01/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic water in room units on Level #4 (except for,rooms 402 and 406) under hydraulic testing. Additional inspections of room shafts on levels 3, 4, 5.
08/05/2024 COT - HCPL - Plumbing Intermediate  Partial Pass In wall plumbing with waste and vent, domestic water system.
08/06/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #3; Room units #310 - 317. Ok to insulate and cover walls.
08/07/2024 COT - HCPL - Plumbing Intermediate  Canceled Contractor cancelled.
08/13/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Levels 5 & 6 DWV (2 1/2” - 4” lines) in room units 502 - 510, 602 - 610.
08/16/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic waste and vent lines at 2 1/2” - 4” at Level #7 room units 701, 710 - 717; Level #4; room units 402 and 406.
08/20/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #4; room units 402, 403, 406, 407, 408, 409. Ok to,insulate and cover walls.
08/22/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #1, Lobby offices and mailroom corridor. Level #4. room units 401, 410, 412, 413, 414, 415, 416, 417
08/23/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #4, Room units 404, 406, 414.
08/26/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #4; unit #411.
NOTE: Plumbing for spa is not ready.
08/29/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Roof level at pool equipment room; 6” vent pipe is connected to vent pipes on level #10. Note: Level #4: sprinkler pipe leak at room 417.
09/06/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #5; room units 502 - 510.
09/09/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #5, room units; #501’ 511 - 517.
09/13/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #5, corridor ceilings,areas.
09/19/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #6; room units 602 - 609.
09/20/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #6; Room units: 601, 610 - 617.
09/24/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Roof level: Pool/spa area, plumping for spa complete and under hydro test. OK to place compressed styrofoam in spa at 3’6” level.
09/26/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Plumbing above ceiling on,Level #6 corridors. Level #7: domestic water system under hydro test.
09/27/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic waste lines at 2” - 4” on Level #10; Room units 1001 - 1010.
09/30/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic waste lines are 2” - 4” in Level 10 rooms: 1004, 1006, 1011, 1012, 1013, 1014, 1015. 1016, 1017
10/03/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #7; Room units 702 - 709.
10/04/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #7; Room units 701, 710 - 717. level #1, Package room
10/11/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Plumbing in walls at Level #1: fitness/spa areas, maintenance rooms. Ok to insulate and cover walls.
10/14/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #1.5 corridor walls below ceiling level. Ok to sheet rock,progress areas.
10/17/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #8, Room units 802 - 810. Level #9, water main gauge under hydro test. Level #8 domestic water system under hydro test.
10/21/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #8; Room units 810, 811, 812, 814: in wall plumbing.
10/22/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #8; in wall plumbing in room united 810 - 817, 801. OK to insulate and cover walls.
10/25/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #1.5; restrooms, corridors, storage room, elevator lobby. Level #1. townhouse #101.
10/30/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Water lines to,pool and spa are under pressure test at 24 - 26 psi. Domestic water lines on Level #9 under hydro pressure test.
10/31/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #9, Room units 902 - 909.
11/01/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #9; Room units 901 - 917.
11/05/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #9; above ceilings in corridors and,elevator lobby.
11/07/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #10 domestic water tests for rooms 1002 - 1009.
11/08/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Amenities bathrooms and corridors, Level 1.5 Sauna, Elevator lobbies at Levels 10 and 10.5.
11/13/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #10: Domestic water lines for floor level. Room units at 1002 - 1009.
11/15/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #10, Room units 1010, 1012, 1015, 1016.
11/19/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #10, corridors above ceiling.
12/02/2024 COT - HCPL - Plumbing Intermediate  Not Ready Contractor cancelled, will reschedule for 3 December.
12/06/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level #10.5. room units 1131 - 1134. Ok to insulate and cover walls.