Inspection Status: Partial Pass
Inspection History: COT - HCME - Mechanical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Partial Pass |
Positive air pressure system in stairwells at levels 4 - 10. |
| 08/09/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Partial Pass |
Level #2 corridors above ceiling. |
| 10/07/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Partial Pass |
Level #7 corridors above ceiling. |
| 12/03/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Not Ready |
Contractor cancelled, will reschedule. |
| 12/06/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Passed |
|